1999 HONDA CR-V Power

[x] Cancel search: Power

Page 879 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Power Steering Gearbox
Removal (contdl
24. Remove the mounting brackets.
25.lvlove the steering gearbox to the right so the
rack end clears the rear beam, then place the
rack end below the rear beam

Page 881 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Power Steering Gearbox
Disassembly {contd}
12. Drill a 3 mm (0.12 in) diameter hole approximately
2.5 - 3.0 mm (0.10 - 0.12 in) in depth in the staked
point on the cylinder. Do not allow metal shavi

Page 883 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Power Steering Gearbox
Disassembly (contd)
Valve Body Unit Dbassembly
23. Before removing the valve housing, apply vinyltape
to solines of the Dinion shaft.
VALVE HOUSING
Separate the valve housing

Page 885 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Power Steering Gearbox
Reassembly
Note these items during reassembly
. Clean the disassembled parts with a solvent, and dry them with compressed air. Do not dip the rubber parts in a sol-
vent.
. Alw

Page 886 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Valve Body Unh Roa$embly
1. Apply vinyl tape to the stepped portion of the pin-
ion shaft, and coat the surface of the vinyl tape with
the power steering fluid.
Vinyl tape(Stopp6d portion)
VALVE OIL

Page 887 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Power Steering Gearbox
13.
Reassembly (contd)
Apply power steering fluid to the surface of the spe-
cial tool. Set the new seal rings over the special tool
from the smaller diameter end of the tool.

Page 888 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
20. Press the new bearing into the valve housing with
the stamped letter facing up using a hydraulic press
and soecialtool.
ATTACHMENT,32x35mm07746 - 0010100
- ROLLER BEARINGLetter stamped face
21. A

Page 889 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Power Steering Gearbox
Reassembly (contdl
Stecring Rack R8assembly
25. Coat the piston seal ring guide with power steering
fluid, then slide it onto the rack, big end first.
26. Position the new O-r