1998 NISSAN PATROL oil

[x] Cancel search: oil

Page 19 of 24

NISSAN PATROL 1998 Y61 / 5.G Steering System Workshop Manual Assembly
Assemble oil pump, noting the following instructions.
+Make sure O-rings and oil seal are properly installed.
+Always install new O-rings and oil seal.
+Be careful of oil seal direction.
+Cam

Page 21 of 24

NISSAN PATROL 1998 Y61 / 5.G Steering System Workshop Manual Disassembly
TIE-ROD
When tie-rod ball joints and tie-rod bar are separated, adjust tie-rod
length correctly.
Adjustment should be done between ball stud centers.
L: Standard
1,302 mm (51.26 in)
CAUTIO

Page 22 of 24

NISSAN PATROL 1998 Y61 / 5.G Steering System Workshop Manual TIE-ROD AND DRAG LINK
Check tie-rod and drag link for breakage, bends and cracks, and
replace with a new one if necessary.
FIXING LOCATION
+Check ®xing location (nuts and cotter pins) for looseness,

Page 24 of 24

NISSAN PATROL 1998 Y61 / 5.G Steering System Workshop Manual POWER STEERING SYSTEM
(Model: PB69K)
Steering wheel turning force
(at 360É from neutral posi-
tion and circumference of
steering wheel) N (kg, lb)39 (4, 9) or less
Oil pump pressure
kPa (bar, kg/cm
2
Page:   < prev 1-8 9-16