1998 MITSUBISHI LANCER EVOLUTION IV sensor

[x] Cancel search: sensor

Page 13 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual ENGINE – Engine Adjustments11-7
4. LASH ADJUSTER REPLACEMENT
Refer to (4) of the preceding paragraph.
5. IGNITION TIMING CHECK
Check that ignition timing is at the standard value.
Standard value: ap

Page 14 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual ENGINE – Engine Adjustments11-8
(5) Set compression gauge to one of the spark plug holes.
(6) Crank the engine with the throttle valve fully open and
measure the compression pressure.
Standard value

Page 16 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual ENGINE – Camshaft and Camshaft Oil Seal11-10
CAMSHAFT AND CAMSHAFT OIL SEAL
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
(1) Engine Coolant Draining and Refilling
(2) Air Hos

Page 21 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual ENGINE – Crankshaft Oil Seal11-15
CRANKSHAFT OIL SEAL
REMOVAL AND INSTALLATION
4
3 2
1
5127 – 137 
{13.0 – 14.0}
3
Unit: Nm {kgfm} Engine  oil
5
Crankshaft front oil seal removal
steps
Timing

Page 23 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual ENGINE – Cylinder Head Gasket11-17
CYLINDER HEAD GASKET
REMOVAL AND INSTALLATION
Pre-removal Operation
(1) Fuel Discharge Prevention
(2) Engine Oil Removal
(3) Strut Tower Bar Removal
(4) Timing Bel

Page 27 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual ENGINE – Timing Belt11-21
TIMING BELT
REMOVAL AND INSTALLATION
1
2
3
4 56
7
8
910
11 1213
14 15
16 171821
22
23
242526
27
28
20
19
11 {1.1}
11 {1.1} 11 {1.1}
88 {9.0}
49 {5.0}
9 {0.9}
48 {4.9}54 {5.

Page 38 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual ENGINE –  Engine  Assembly  11- 32
ENGINE ASSEMBLY
REMOVAL AND INSTALLATION
Pre-removal Operation 
(1) Fuel Discharge Prevention 
(2) Hood Removal 
(3) Strut Tower Bar Removal
(4) Air Hose C Removal

Page 44 of 396

MITSUBISHI LANCER EVOLUTION IV 1998  Workshop Manual 13-1
FUEL
CONTENTS
MULTIPOINT INJECTION (MPI) 2. . . . . . . 
GENERAL INFORMATION 2. . . . . . . . . . . . . . . . 
SERVICE SPECIFICATIONS 3. . . . . . . . . . . . . . 
SEALANT 3. . . . . . . . . . .
Page:   1-8 9-16 17-24 25-32 33-40 ... 88 next >