
when a minimum discharge pressure of 2756 kPa
(400 psi) is reached.
The high pressure relief valve vents only enough
refrigerant to reduce the system pressure, and then
re-seats itself. The majority of the refrigerant is con-
served in the system. If the valve vents refrigerant, it
does not mean that the valve is faulty.
The high pressure relief valve is a factory-cali-
brated unit. The valve cannot be adjusted or
repaired, and must not be removed or otherwise dis-
turbed. The valve is only serviced as a part of the
compressor assembly.
DIAGNOSIS AND TESTING - A/C COMPRESSOR
When investigating an air conditioning related
noise, you must first know the conditions under
which the noise occurs. These conditions include:
weather, vehicle speed, transmission in gear or neu-
tral, engine speed, engine temperature, and any
other special conditions. Noises that develop during
air conditioning operation can often be misleading.
For example: What sounds like a failed front bearing
or connecting rod, may be caused by loose bolts, nuts,
mounting brackets, or a loose compressor clutch
assembly.
Drive belts are speed sensitive. At different engine
speeds and depending upon belt tension, belts can
develop noises that are mistaken for a compressor
noise. Improper belt tension can cause a misleading
noise when the compressor clutch is engaged, which
may not occur when the compressor clutch is disen-
gaged. Check the serpentine drive belt condition and
tension as described in Cooling before beginning this
procedure.
(1) Select a quiet area for testing. Duplicate the
complaint conditions as much as possible. Switch the
compressor on and off several times to clearly iden-
tify the compressor noise. Listen to the compressor
while the clutch is engaged and disengaged. Probe
the compressor with an engine stethoscope or a long
screwdriver with the handle held to your ear to bet-
ter localize the source of the noise.
(2) Loosen all of the compressor mounting hard-
ware and retighten. Tighten the compressor clutch
mounting nut. Be certain that the clutch coil is
mounted securely to the compressor, and that the
clutch plate and rotor are properly aligned and have
the correct air gap (Refer to 24 - HEATING & AIR
CONDITIONING/CONTROLS/A/C COMPRESSOR
CLUTCH - INSTALLATION).
(3) To duplicate a high-ambient temperature condi-
tion (high head pressure), restrict the air flow
through the condenser. Install a manifold gauge set
or a DRBIIItscan tool to be certain that the dis-
charge pressure does not exceed 2760 kPa (400 psi).(4) Check the refrigerant system plumbing for
incorrect routing, rubbing or interference, which can
cause unusual noises. Also check the refrigerant lines
for kinks or sharp bends that will restrict refrigerant
flow, which can cause noises (Refer to 24 - HEATING
& AIR CONDITIONING/PLUMBING - STANDARD
PROCEDURE).
(5) If the noise is from opening and closing of the
high pressure relief valve, recover, evacuate and
recharge the refrigerant system (Refer to 24 - HEAT-
ING & AIR CONDITIONING/PLUMBING - STAN-
DARD PROCEDURE), (Refer to 24 - HEATING &
AIR CONDITIONING/PLUMBING - STANDARD
PROCEDURE - REFRIGERANT SYSTEM EVACU-
ATE) and (Refer to 24 - HEATING & AIR CONDI-
TIONING/PLUMBING - STANDARD PROCEDURE -
REFRIGERANT SYSTEM CHARGE). If the high
pressure relief valve still does not seat properly,
replace the compressor (Refer to 24 - HEATING &
AIR CONDITIONING/PLUMBING/A/C COMPRES-
SOR - REMOVAL).
(6) If the noise is from liquid slugging on the suc-
tion line, replace the accumulator (Refer to 24 -
HEATING & AIR CONDITIONING/PLUMBING/AC-
CUMULATOR - REMOVAL) and check the refriger-
ant oil level and the refrigerant system charge (Refer
to 24 - HEATING & AIR CONDITIONING/PLUMB-
ING/REFRIGERANT OIL - STANDARD PROCE-
DURE) (Refer to 24 - HEATING & AIR
CONDITIONING/PLUMBING/ACCUMULATOR -
REMOVAL). If after replacing the accumulator the
slugging condition still exists then replace the com-
pressor.(Refer to 24 - HEATING & AIR CONDITION-
ING/PLUMBING/A/C COMPRESSOR - REMOVAL).
(7) If the liquid slugging condition continues fol-
lowing accumulator replacement, replace the com-
pressor and repeat Step 1.
REMOVAL
WARNING: REVIEW THE WARNINGS AND CAU-
TIONS IN THE FRONT OF THIS SECTION BEFORE
PERFORMING THE FOLLOWING OPERATION (Refer
to 24 - HEATING & AIR CONDITIONING/PLUMBING -
WARNING) and (Refer to 24 - HEATING & AIR CON-
DITIONING/PLUMBING - CAUTION).
NOTE: The A/C compressor may be removed and
repositioned without disconnecting the refrigerant
lines or discharging the refrigerant system. Dis-
charging is not necessary if servicing the compres-
sor clutch, clutch coil, engine, engine cylinder head
or the generator.
(1) Recover the refrigerant from the refrigerant
system (Refer to 24 - HEATING & AIR CONDITION-
DRPLUMBING 24 - 49
A/C COMPRESSOR (Continued)

BURNT FLUID - DIAGNOSIS AND
TESTING, CAUSES OF..........21-201,21-366
BUSHING - INSTALLATION.............19-19
BUSHING - INSTALLATION, TORSION
BAR CROSS MEMBER..................2-15
BUSHING - REMOVAL.................19-19
BUSHING - REMOVAL, TORSION BAR
CROSSMEMBER......................2-13
BUSHING AND SEAL - INSTALLATION,
EXTENSION HOUSING................21-440
BUSHING AND SEAL - REMOVAL,
EXTENSION HOUSING................21-440
BUSHINGS - 2WD (LD) - INSTALLATION,
LOWER CONTROL ARM................2-15
BUSHINGS - 2WD (LD) - REMOVAL,
LOWER CONTROL ARM................2-13
BUSHINGS - 4WD (LD) - INSTALLATION,
LOWER CONTROL ARM................2-14
BUSHINGS - 4WD (LD) - REMOVAL,
LOWER CONTROL ARM................2-13
BUSHINGS - INSTALLATION.............2-43
BUSHINGS - REMOVAL.................2-43
BUZZ, SQUEAK & RATTLE - STANDARD
PROCEDURE........................23-11
BYPASS - DESCRIPTION, WATER PUMP . . . 7-59
BYPASS - OPERATION, WATER PUMP.....7-60
C205F - ADJUSTMENTS, FRONT AXLE.....3-32
C205F - DIAGNOSIS AND TESTING,
FRONT AXLE.........................3-27
C205F - INSTALLATION, FRONT AXLE.....3-31
C205F - REMOVAL, FRONT AXLE...........3-31
C205F - SPECIAL TOOLS, FRONT AXLE....3-40
C205F - SPECIFICATIONS, FRONT AXLE....3-39
CAB - INSTALLATION, QUAD......8O-36,8O-61
CAB - INSTALLATION, STANDARD . . 8O-35,8O-61
CAB - REMOVAL, QUAD..........8O-33,8O-60
CAB - REMOVAL, STANDARD......8O-32,8O-59
CAB BACK PANEL TRIM -
INSTALLATION, REAR.................23-69
CAB BACK PANEL TRIM - REMOVAL,
REAR..............................23-68
CAB CLEARANCE LAMP - INSTALLATION . . 8L-12
CAB CLEARANCE LAMP - REMOVAL.....8L-11
CABLE - ADJUSTMENTS, THROTTLE
VALVE ............................21-254
CABLE - DESCRIPTION.................8P-4
CABLE - DESCRIPTION, ANTENNA BODY . . . 8A-4
CABLE - DESCRIPTION, SPARK PLUG.....8I-21
CABLE - DESCRIPTION, THROTTLE
VALVE ............................21-253
CABLE - DIAGNOSIS AND TESTING,
ANTENNA BODY......................8A-4
CABLE - DIAGNOSIS AND TESTING,
GEARSHIFT..................21-210,21-368
CABLE - INSTALLATION................8P-5
CABLE - INSTALLATION, ANTENNA BODY . . 8A-6
CABLE - INSTALLATION, CHECK.........23-15
CABLE - INSTALLATION, FRONT
PARKING BRAKE......................5-38
CABLE - INSTALLATION, GEARSHIFT....21-211,
21-370
CABLE - INSTALLATION, INSTRUMENT
PANEL ANTENNA......................8A-7
CABLE - INSTALLATION, LEFT REAR......5-39
CABLE - INSTALLATION, REAR PARK
BRAKE..............................5-38
CABLE - INSTALLATION, RIGHT REAR.....5-38
CABLE - INSTALLATION, SPARK PLUG....8I-22
CABLE - INSTALLATION, THROTTLE
CONTROL.....................14-40,14-84
CABLE - OPERATION...................8P-4
CABLE - OPERATION, ANTENNA BODY
.....8A-4
CABLE - OPERATION, SPARK PLUG
.......8I-21
CABLE - REMOVAL
....................8P-4
CABLE - REMOVAL, ANTENNA BODY
......8A-6
CABLE - REMOVAL, CHECK
.............23-15
CABLE - REMOVAL, FRONT PARKING
BRAKE
..............................5-36
CABLE - REMOVAL, GEARSHIFT
. . 21-210,21-369
CABLE - REMOVAL, INSTRUMENT PANEL
ANTENNA
...........................8A-7
CABLE - REMOVAL, LEFT REAR
..........5-38
CABLE - REMOVAL, REAR PARK BRAKE
. . . 5-37
CABLE - REMOVAL, RIGHT REAR
.........5-37
CABLE - REMOVAL, SPARK PLUG
........8I-22
CABLE - REMOVAL, THROTTLE
CONTROL
.....................14-38,14-83CABLE, ADJUSTMENTS - GEARSHIFT . . . 21-212,
21-370
CABLE RESISTANCE, SPECIFICATIONS -
SPARK PLUG.........................8I-4
CABLE ROUTING, 5.7L V-8 ENGINE -
FIRING ORDER........................8I-4
CABLE/HANDLE ASSEMBLY -
INSTALLATION, LATCH RELEASE........23-47
CABLE/HANDLE ASSEMBLY - REMOVAL,
LATCH RELEASE.....................23-47
CABLES - DESCRIPTION, BATTERY.......8F-14
CABLES - DIAGNOSIS AND TESTING,
BATTERY...........................8F-15
CABLES - INSTALLATION, BATTERY......8F-17
CABLES - OPERATION, BATTERY........8F-15
CABLES - REMOVAL, BATTERY..........8F-16
CALIBRATION - STANDARD PROCEDURE,
COMPASS...........................8M-3
CALIPER ADAPTER MOUNT -
INSTALLATION, DISC BRAKE............5-22
CALIPERS - DESCRIPTION, DISC BRAKE . . . 5-16
CALIPERS - OPERATION, DISC BRAKE.....5-16
CAM BORE REPAIR - STANDARD
PROCEDURE........................9-267
CAMBER AND CASTER ADJUSTMENT -
STANDARD PROCEDURE.................2-4
CAMBER, CASTER AND TOE
ADJUSTMENT - STANDARD
PROCEDURE..........................2-4
CAM/OVERDRIVE PISTON RETAINER -
ASSEMBLY, OVERRUNNING CLUTCH....21-237
CAM/OVERDRIVE PISTON RETAINER -
CLEANING, OVERRUNNING CLUTCH.....21-236
CAM/OVERDRIVE PISTON RETAINER -
DESCRIPTION, OVERRUNNING CLUTCH . . 21-236
CAM/OVERDRIVE PISTON RETAINER -
DISASSEMBLY, OVERRUNNING
CLUTCH...........................21-236
CAM/OVERDRIVE PISTON RETAINER -
INSPECTION, OVERRUNNING CLUTCH . . . 21-237
CAM/OVERDRIVE PISTON RETAINER -
OPERATION, OVERRUNNING CLUTCH....21-236
CAMSHAFT - INSTALLATION.......9-206,9-271
CAMSHAFT - REMOVAL..........9-205,9-268
CAMSHAFT BEARINGS - INSTALLATION . . . 9-271
CAMSHAFT BEARINGS - REMOVAL......9-268
CAMSHAFT CORE HOLE PLUG -
INSTALLATION.......................9-206
CAMSHAFT CORE HOLE PLUG -
REMOVAL..........................9-205
CAMSHAFT POSITION SENSOR -
DESCRIPTION.......................14-71
CAMSHAFT POSITION SENSOR -
DESCRIPTION.........................8I-7
CAMSHAFT POSITION SENSOR -
INSTALLATION.......................14-72
CAMSHAFT POSITION SENSOR -
INSTALLATION.......................8I-10
CAMSHAFT POSITION SENSOR -
OPERATION.........................14-71
CAMSHAFT POSITION SENSOR -
OPERATION..........................8I-7
CAMSHAFT POSITION SENSOR -
REMOVAL..........................14-72
CAMSHAFT POSITION SENSOR -
REMOVAL............................8I-9
CAMSHAFT(S) - DESCRIPTION.......9-25,9-35
CAMSHAFT(S) - INSTALLATION......9-27,9-36
CAMSHAFT(S) - LEFT - DESCRIPTION....9-114
CAMSHAFT(S) - LEFT - INSTALLATION....9-116
CAMSHAFT(S) - LEFT - REMOVAL.......9-115
CAMSHAFT(S) - REMOVAL..........9-25,9-35
CAMSHAFT(S) - RIGHT - DESCRIPTION . . . 9-119
CAMSHAFT(S) - RIGHT - INSTALLATION . . 9-120
CAMSHAFT(S) - RIGHT - REMOVAL......9-119
CANISTER - DESCRIPTION, VAPOR......25-22
CANISTER - INSTALLATION, VAPOR......25-22
CANISTER - OPERATION, VAPOR........25-22
CANISTER - REMOVAL, VAPOR..........25-22
CAP - DESCRIPTION, FUEL FILLER.......25-13
CAP - DESCRIPTION, RADIATOR
PRESSURE
..........................7-57
CAP - DIAGNOSIS AND TESTING,
RADIATOR
...........................7-58
CAP - OPERATION, FUEL FILLER
........25-13
CAP - OPERATION, RADIATOR
PRESSURE
..........................7-58
CAPACITIES, SPECIFICATIONS - FLUID
......0-5CAPACITOR - DESCRIPTION, IGNITION
COIL...............................8I-21
CAPACITOR - INSTALLATION, IGNITION
COIL...............................8I-21
CAPACITOR - OPERATION, IGNITION
COIL...............................8I-21
CAPACITOR - REMOVAL, IGNITION COIL . . . 8I-21
CAP-TO-FILLER NECK SEAL -
DIAGNOSIS AND TESTING, RADIATOR.....7-58
CARDAN UNIVERSAL JOINTS -
ASSEMBLY, DOUBLE...................3-17
CARDAN UNIVERSAL JOINTS -
DISASSEMBLY, DOUBLE................3-16
CARGO BOX - INSTALLATION...........23-37
CARGO BOX - INSTALLATION, WITH.....8L-22,
8L-23,8L-24,8L-7,8L-9
CARGO BOX - INSTALLATION, WITHOUT . . 8L-22,
8L-23,8L-24,8L-8,8L-9
CARGO BOX - REMOVAL...............23-37
CARGO BOX - REMOVAL, WITH....8L-22,8L-24,
8L-7,8L-9
CARGO BOX - REMOVAL, WITHOUT.....8L-22,
8L-23,8L-24,8L-7,8L-9
CARGO BOX - TIE DOWN -
INSTALLATION.......................23-38
CARGO BOX - TIE DOWN - REMOVAL....23-38
CARGO LAMP INDICATOR -
DESCRIPTION.......................8J-20
CARGO LAMP INDICATOR - OPERATION . . 8J-20
CARPETS AND FLOOR MATS -
INSTALLATION.......................23-65
CARPETS AND FLOOR MATS - REMOVAL . . . 23-65
CASCADE OVERFLOW VALVE -
DESCRIPTION.......................14-66
CASCADE OVERFLOW VALVE -
OPERATION.........................14-66
CASE - DESCRIPTION, TRANSFER.........0-4
CASE - NV241 GENII - ASSEMBLY,
TRANSFER.........................21-428
CASE - NV241 GENII - CLEANING,
TRANSFER.........................21-426
CASE - NV241 GENII - DESCRIPTION,
TRANSFER.........................21-415
CASE - NV241 GENII - DIAGNOSIS AND
TESTING, TRANSFER.................21-416
CASE - NV241 GENII - DISASSEMBLY,
TRANSFER.........................21-417
CASE - NV241 GENII - INSPECTION,
TRANSFER.........................21-426
CASE - NV241 GENII - INSTALLATION,
TRANSFER.........................21-438
CASE - NV241 GENII - OPERATION,
TRANSFER.........................21-415
CASE - NV241 GENII - REMOVAL,
TRANSFER.........................21-417
CASE - NV243 - ASSEMBLY, TRANSFER . . 21-496
CASE - NV243 - CLEANING, TRANSFER . . 21-493
CASE - NV243 - DESCRIPTION,
TRANSFER.........................21-482
CASE - NV243 - DIAGNOSIS AND
TESTING, TRANSFER.................21-483
CASE - NV243 - DISASSEMBLY,
TRANSFER.........................21-484
CASE - NV243 - INSPECTION, TRANSFER . 21-493
CASE - NV243 - INSTALLATION,
TRANSFER.........................21-505
CASE - NV243 - OPERATION, TRANSFER . 21-483
CASE - NV243 - REMOVAL, TRANSFER . . 21-484
CASE - NV244 - DIAGNOSIS AND
TESTING, TRANSFER.................21-513
CASE - NV244 GENII - ASSEMBLY,
TRANSFER.........................21-525
CASE - NV244 GENII - CLEANING,
TRANSFER.........................21-523
CASE - NV244 GENII - DESCRIPTION,
TRANSFER.........................21-512
CASE - NV244 GENII - DISASSEMBLY,
TRANSFER.........................21-514
CASE - NV244 GENII - INSPECTION,
TRANSFER.........................21-523
CASE - NV244 GENII - INSTALLATION,
TRANSFER
.........................21-534
CASE - NV244 GENII - OPERATION,
TRANSFER
.........................21-513
CASE - NV244 GENII - REMOVAL,
TRANSFER
.........................21-514
CASE - NV271 - ASSEMBLY, TRANSFER
. . 21-461
CASE - NV271 - CLEANING, TRANSFER
. . 21-459
DRINDEX 5
Description Group-Page Description Group-Page Description Group-Page

CONTROL MODULE - DESCRIPTION,
AIRBAG............................8O-11
CONTROL MODULE - DESCRIPTION,
FRONT...........................8W-97-5
CONTROL MODULE - DESCRIPTION,
FRONT..............................8E-5
CONTROL MODULE - DESCRIPTION,
TRANSFER CASE.....................8E-16
CONTROL MODULE - DESCRIPTION,
TRANSMISSION......................8E-20
CONTROL MODULE - DIAGNOSIS AND
TESTING, FRONT...................8W-97-5
CONTROL MODULE - DIAGNOSIS AND
TESTING, FRONT......................8E-5
CONTROL MODULE - INSTALLATION,
AIRBAG............................8O-13
CONTROL MODULE - INSTALLATION,
ENGINE.............................8E-4
CONTROL MODULE - INSTALLATION,
FRONT...........................8W-97-6
CONTROL MODULE - INSTALLATION,
FRONT..............................8E-5
CONTROL MODULE - OPERATION,
AIRBAG............................8O-11
CONTROL MODULE - OPERATION,
FRONT...........................8W-97-5
CONTROL MODULE - OPERATION,
FRONT..............................8E-5
CONTROL MODULE - OPERATION,
TRANSFER CASE.....................8E-16
CONTROL MODULE - OPERATION,
TRANSMISSION......................8E-20
CONTROL MODULE - REMOVAL, AIRBAG . 8O-12
CONTROL MODULE - REMOVAL, ENGINE . . . 8E-4
CONTROL MODULE - REMOVAL, FRONT . 8W-97-6
CONTROL MODULE - REMOVAL, FRONT . . . 8E-5
CONTROL MOTOR - DESCRIPTION, IDLE
AIR ...............................14-28
CONTROL MOTOR - INSTALLATION, IDLE
AIR ...............................14-29
CONTROL MOTOR - OPERATION, IDLE
AIR ...............................14-28
CONTROL MOTOR - REMOVAL, IDLE AIR . . 14-29
CONTROL RELAY - DESCRIPTION,
TRANSMISSION.....................21-405
CONTROL RELAY - OPERATION,
TRANSMISSION.....................21-405
CONTROL SWITCH - DESCRIPTION,
LUMBAR...........................8N-17
CONTROL SWITCH - OPERATION,
LUMBAR...........................8N-18
CONTROL SWITCH - REMOVAL,
LUMBAR...........................8N-18
CONTROLLED VISCOUS FAN DRIVE -
DIAGNOSIS AND TESTING,
ELECTRONICALLY.....................7-52
CONTROLLER ANTILOCK BRAKE -
DESCRIPTION........................8E-3
CONTROLLER ANTILOCK BRAKE -
INSTALLATION........................8E-3
CONTROLLER ANTILOCK BRAKE -
OPERATION..........................8E-3
CONTROLLER ANTILOCK BRAKE -
REMOVAL...........................8E-3
CONTROLS - DIAGNOSIS AND TESTING,
OVERDRIVE ELECTRICAL.............21-262
CONVERTER - DESCRIPTION, CATALYTIC
. . . 11-6
CONVERTER - DESCRIPTION, TORQUE
. . 21-255,
21-399
CONVERTER - INSTALLATION, TORQUE
. . 21-260,
21-404
CONVERTER - OPERATION, CATALYTIC
....11-6
CONVERTER - OPERATION, TORQUE
....21-259,
21-403
CONVERTER - REMOVAL, TORQUE
.....21-260,
21-404
CONVERTER DRAINBACK VALVE -
DESCRIPTION, TORQUE
..............21-261
CONVERTER DRAINBACK VALVE -
OPERATION, TORQUE
................21-261
CONVERTER DRAINBACK VALVE -
STANDARD PROCEDURE, TORQUE
......21-261
CONVERTER HOUSING FLUID LEAK -
DIAGNOSIS AND TESTING
......21-144,21-318
COOLANT - DESCRIPTION, ENGINE
.......7-31
COOLANT - DESCRIPTION, ENGINE
........0-3
COOLANT - DESCRIPTION, HOAT
.........7-32COOLANT - STANDARD PROCEDURE,
ADDING ADDITIONAL..................7-19
COOLANT FLOW - DIAGNOSIS AND
TESTING, RADIATOR...............7-54,7-56
COOLANT LEVEL CHECK - STANDARD
PROCEDURE.........................7-17
COOLANT RECOVERY CONTAINER- GAS
ENGINES - DESCRIPTION...............7-33
COOLANT RECOVERY CONTAINER- GAS
ENGINES - INSTALLATION...............7-33
COOLANT RECOVERY CONTAINER- GAS
ENGINES - OPERATION.................7-33
COOLANT RECOVERY CONTAINER- GAS
ENGINES - REMOVAL..................7-33
COOLANT TEMPERATURE SENSOR -
DESCRIPTION, ENGINE.................7-38
COOLANT TEMPERATURE SENSOR -
INSTALLATION, ENGINE................7-41
COOLANT TEMPERATURE SENSOR -
OPERATION, ENGINE...................7-38
COOLANT TEMPERATURE SENSOR -
REMOVAL, ENGINE....................7-39
COOLANT THERMOSTAT - 3.7L/4.7L -
DESCRIPTION, ENGINE.................7-44
COOLANT THERMOSTAT - 3.7L/4.7L -
INSTALLATION, ENGINE................7-45
COOLANT THERMOSTAT - 3.7L/4.7L -
OPERATION, ENGINE...................7-44
COOLANT THERMOSTAT - 3.7L/4.7L -
REMOVAL, ENGINE....................7-45
COOLANT THERMOSTAT - 5.9L DIESEL -
DESCRIPTION, ENGINE.................7-46
COOLANT THERMOSTAT - 5.9L DIESEL -
INSTALLATION, ENGINE..................7-47
COOLANT THERMOSTAT - 5.9L DIESEL -
OPERATION, ENGINE...................7-46
COOLANT THERMOSTAT - 5.9L DIESEL -
REMOVAL, ENGINE....................7-47
COOLANT THERMOSTAT - 8.0L -
DESCRIPTION, ENGINE.................7-48
COOLANT THERMOSTAT - 8.0L -
INSTALLATION, ENGINE................7-49
COOLANT THERMOSTAT - 8.0L -
OPERATION, ENGINE...................7-48
COOLANT THERMOSTAT - 8.0L -
REMOVAL, ENGINE....................7-49
COOLANT THERMOSTAT-5.7L -
DESCRIPTION, ENGINE.................7-41
COOLANT THERMOSTAT-5.7L -
INSTALLATION, ENGINE................7-43
COOLANT THERMOSTAT-5.7L -
OPERATION, ENGINE...................7-41
COOLANT THERMOSTAT-5.7L -
REMOVAL, ENGINE....................7-42
COOLER - 5.9L DIESEL - DESCRIPTION,
TRANS..............................7-68
COOLER - 5.9L DIESEL - OPERATION,
TRANS..............................7-69
COOLER - DESCRIPTION, TRANS.........7-67
COOLER - INSTALLATION, AIR TO OIL.....7-70
COOLER - INSTALLATION, FLUID........19-43
COOLER - INSTALLATION, RETURN
HOSE - GEAR TO................19-44,19-45
COOLER - INSTALLATION, RETURN
HOSE - RESERVOIR TO...........19-44,19-45
COOLER - INSTALLATION, TRANS........7-68
COOLER - INSTALLATION, WATER-TO-
AIR
................................7-70
COOLER - OPERATION, TRANS
...........7-67
COOLER - REMOVAL, AIR TO OIL
.........7-69
COOLER - REMOVAL, FLUID
............19-43
COOLER - REMOVAL, RETURN HOSE -
GEAR TO
......................19-44,19-45
COOLER - REMOVAL, RETURN HOSE -
RESERVOIR TO
.................19-44,19-45
COOLER - REMOVAL, TRANS
............7-68
COOLER - REMOVAL, WATER TO OIL
......7-69
COOLER AND PLUMBING - CLEANING,
CHARGE AIR
........................11-17
COOLER AND PLUMBING -
DESCRIPTION, CHARGE AIR
............11-16
COOLER AND PLUMBING - INSPECTION,
CHARGE AIR
........................11-17
COOLER AND PLUMBING -
INSTALLATION, CHARGE AIR
...........11-17
COOLER AND PLUMBING - OPERATION,
CHARGE AIR
........................11-16COOLER AND PLUMBING - REMOVAL,
CHARGE AIR........................11-17
COOLER SYSTEM - LEAKS - DIAGNOSIS
AND TESTING, CHARGE AIR............11-16
COOLING, SPECIAL TOOLS..............7-20
COOLING SYSTEM - ALL GAS ENGINES -
STANDARD PROCEDURE, DRAINING......7-17
COOLING SYSTEM - ALL GAS ENGINES -
STANDARD PROCEDURE, REFILLING......7-18
COOLING SYSTEM - OPERATION..........7-5
COOLING SYSTEM - TESTING FOR
LEAKS - DIAGNOSIS AND TESTING........7-5
COOLING SYSTEM 5.9L DIESEL ENGINE
- STANDARD PROCEDURE, DRAINING.....7-18
COOLING SYSTEM 5.9L DIESEL ENGINE
- STANDARD PROCEDURE, REFILLING.....7-19
COOLING SYSTEM CLEANING/REVERSE
FLUSHING - STANDARD PROCEDURE.....7-17
COOLING SYSTEM DIESEL ENGINE -
DIAGNOSIS AND TESTING...............7-7
COOLING SYSTEM FLOW - 5.9L DIESEL
- DESCRIPTION........................7-3
COOLING SYSTEM FLOW 3.7L/4.7L/5.7L
ENGINE - DESCRIPTION.................7-1
COOLING SYSTEM REQUIREMENTS -
DESCRIPTION, ENGINE.................24-1
COOLING SYSTEM, WARNING - ENGINE . . 24-42
CORE - DESCRIPTION, HEATER.........24-63
CORE - DESCRIPTION, SERVICE PORT
VALVE .............................24-70
CORE - INSTALLATION, HEATER.........24-63
CORE - INSTALLATION, SERVICE PORT
VALVE .............................24-70
CORE - OPERATION, HEATER...........24-63
CORE - REMOVAL, HEATER............24-63
CORE HOLE PLUG - INSTALLATION,
CAMSHAFT.........................9-206
CORE HOLE PLUG - REMOVAL,
CAMSHAFT.........................9-205
CORE PLUGS - INSTALLATION..........9-131
CORE PLUGS - REMOVAL..............9-131
CORES - REMOVAL, SERVICE PORT
VALVE .............................24-70
COUPLER - DESCRIPTION,
REFRIGERANT LINE...................24-67
COUPLER - INSTALLATION,
REFRIGERANT LINE...................24-68
COUPLER - OPERATION, REFRIGERANT
LINE...............................24-67
COUPLER - REMOVAL, REFRIGERANT
LINE...............................24-68
COUPLING - INSTALLATION, UPPER
STEERING..........................19-13
COUPLING - REMOVAL, UPPER
STEERING..........................19-13
COVER - DESCRIPTION, STRUCTURAL . . . 9-145,
9-216,9-57
COVER - FRONT - INSTALLATION, SEAT
BACK CUSHION......................23-82
COVER - FRONT - INSTALLATION, SEAT
CUSHION...........................23-83
COVER - FRONT - REMOVAL, SEAT BACK
CUSHION...........................23-82
COVER - FRONT - REMOVAL, SEAT
CUSHION...........................23-83
COVER - INSTALLATION...............23-16
COVER - INSTALLATION, ACM
..........8O-10
COVER - INSTALLATION, CENTER SEAT
BACK INERTIA HINGE
.................23-77
COVER - INSTALLATION, CENTER SEAT
CUSHION
...........................23-79
COVER - INSTALLATION, CYLINDER
HEAD
..............................9-255
COVER - INSTALLATION, DIFFERENTIAL
....3-97
COVER - INSTALLATION, GEAR HOUSING
. 9-301
COVER - INSTALLATION, INSTRUMENT
PANEL TOP
.........................23-59
COVER - INSTALLATION, REAR DOOR
SILL TRIM
..........................23-71
COVER - INSTALLATION, SHIFT
. . . 21-129,21-87
COVER - INSTALLATION, STEERING
COLUMN OPENING
...................23-60
COVER - INSTALLATION, STRUCTURAL
. . . 9-145,
9-216,9-57
COVER - INSTALLATION, TIMING/CHAIN
. . 9-227
COVER - OPERATION, STRUCTURAL
.....9-145,
9-216,9-57
8 INDEXDR
Description Group-Page Description Group-Page Description Group-Page

COVER - REAR - INSTALLATION, SEAT
BACK CUSHION......................23-84
COVER - REAR - INSTALLATION, SEAT
CUSHION...........................23-84
COVER - REAR - REMOVAL, SEAT BACK
CUSHION...........................23-84
COVER - REAR - REMOVAL, SEAT
CUSHION...........................23-84
COVER - REMOVAL...................23-16
COVER - REMOVAL, ACM..............8O-10
COVER - REMOVAL, CENTER SEAT BACK
INERTIA HINGE......................23-77
COVER - REMOVAL, CENTER SEAT
CUSHION...........................23-79
COVER - REMOVAL, CYLINDER HEAD....9-255
COVER - REMOVAL, DIFFERENTIAL.......3-97
COVER - REMOVAL, GEAR HOUSING.....9-301
COVER - REMOVAL, INSTRUMENT
PANEL TOP.........................23-58
COVER - REMOVAL, REAR DOOR SILL
TRIM..............................23-71
COVER - REMOVAL, SHIFT.......21-129,21-87
COVER - REMOVAL, STEERING COLUMN
OPENING...........................23-60
COVER - REMOVAL, STRUCTURAL . 9-145,9-216,
9-57
COVER - REMOVAL, TIMING/CHAIN......9-227
COVER - REMOVAL, WHEEL............22-14
COVERING - INSTALLATION, UNDER
SEAT STORAGE BIN..................23-80
COVERING - REMOVAL, UNDER SEAT
STORAGE BIN.......................23-80
COVER(S) - DESCRIPTION, CYLINDER
HEAD..........................9-122,9-27
COVER(S) - INSTALLATION, CYLINDER
HEAD......................9-201,9-28,9-37
COVER(S) - INSTALLATION, TIMING
BELT / CHAIN...................9-171,9-81
COVER(S) - REMOVAL, CYLINDER HEAD . 9-201,
9-28,9-37
COVER(S) - REMOVAL, TIMING BELT /
CHAIN.........................9-170,9-81
COWL GRILLE - INSTALLATION.........23-38
COWL GRILLE - REMOVAL.............23-38
COWL TRIM - INSTALLATION...........23-66
COWL TRIM - REMOVAL...............23-66
C-PILLAR LOWER TRIM - INSTALLATION . . 23-67
C-PILLAR LOWER TRIM - REMOVAL.....23-66
C-PILLAR UPPER TRIM - INSTALLATION . . 23-67
C-PILLAR UPPER TRIM - REMOVAL......23-67
CRANKCASE BREATHER - INSTALLATION . . 9-243
CRANKCASE BREATHER - REMOVAL.....9-242
CRANKSHAFT - DESCRIPTION......9-131,9-40
CRANKSHAFT - INSPECTION........9-132,9-41
CRANKSHAFT - INSTALLATION . 9-132,9-207,9-42
CRANKSHAFT - REMOVAL....9-131,9-206,9-40
CRANKSHAFT AND GEAR -
DESCRIPTION.......................9-273
CRANKSHAFT JOURNAL CLEARANCE -
STANDARD PROCEDURE, CONNECTING
ROD BEARING.......................9-272
CRANKSHAFT MAIN BEARING - FITTING
- STANDARD PROCEDURE........9-134,9-207
CRANKSHAFT MAIN BEARINGS -
INSPECTION...................9-135,9-208
CRANKSHAFT OIL SEAL - FRONT -
INSTALLATION........9-136,9-208,9-275,9-46
CRANKSHAFT OIL SEAL - FRONT -
REMOVAL............9-135,9-208,9-275,9-46
CRANKSHAFT OIL SEAL - REAR -
INSTALLATION........9-138,9-209,9-276,9-47
CRANKSHAFT OIL SEAL - REAR -
REMOVAL............9-137,9-209,9-276,9-47
CRANKSHAFT POSITION SENSOR -
DESCRIPTION..................14-23,14-72
CRANKSHAFT POSITION SENSOR -
INSTALLATION..................14-25,14-73
CRANKSHAFT POSITION SENSOR -
OPERATION....................14-23,14-72
CRANKSHAFT POSITION SENSOR -
REMOVAL
.....................14-24,14-73
CRANKSHAFT REAR OIL SEAL RETAINER
- INSTALLATION
................9-210,9-277
CRANKSHAFT REAR OIL SEAL RETAINER
- REMOVAL
....................9-209,9-277
CROSS MEMBER BUSHING -
INSTALLATION, TORSION BAR
...........2-15
CROSSHEADS - CLEANING
.............9-251CROSSHEADS - INSPECTION...........9-252
CROSSMEMBER - INSTALLATION, FRONT . 13-22
CROSSMEMBER - INSTALLATION,
TRANSMISSION......................13-24
CROSSMEMBER - INSTALLATION,
UPPER RADIATOR....................23-42
CROSSMEMBER - REMOVAL, FRONT.....13-22
CROSSMEMBER - REMOVAL,
TRANSMISSION......................13-24
CROSSMEMBER - REMOVAL, UPPER
RADIATOR..........................23-42
CROSSMEMBER BUSHING - REMOVAL,
TORSION BAR........................2-13
CRUISE INDICATOR - DESCRIPTION......8J-22
CRUISE INDICATOR - OPERATION.......8J-22
CUMMINS TURBO DIESEL -
MAINTENANCE SCHEDULES, 24-VALVE....0-12
CUP HOLDER - INSTALLATION..........23-51
CUP HOLDER - REMOVAL..............23-51
CURTAIN AIRBAG - DESCRIPTION, SIDE . . 8O-56
CURTAIN AIRBAG - INSTALLATION, SIDE . . 8O-58
CURTAIN AIRBAG - OPERATION, SIDE....8O-56
CURTAIN AIRBAG - REMOVAL, SIDE.....8O-57
CUSHION / COVER - FRONT -
INSTALLATION, SEAT.................23-83
CUSHION / COVER - FRONT -
INSTALLATION, SEAT BACK............23-82
CUSHION / COVER - FRONT - REMOVAL,
SEAT ..............................23-83
CUSHION / COVER - FRONT - REMOVAL,
SEAT BACK.........................23-82
CUSHION / COVER - REAR -
INSTALLATION, SEAT.................23-84
CUSHION / COVER - REAR -
INSTALLATION, SEAT BACK............23-84
CUSHION / COVER - REAR - REMOVAL,
SEAT ..............................23-84
CUSHION / COVER - REAR - REMOVAL,
SEAT BACK.........................23-84
CUSHION - INSTALLATION, CENTER
SEAT ..............................23-79
CUSHION - REMOVAL, CENTER SEAT.....23-79
CUSHION COVER - INSTALLATION,
CENTER SEAT.......................23-79
CUSHION COVER - REMOVAL, CENTER
SEAT ..............................23-79
CUSHION FRAME - REAR -
INSTALLATION, SEAT.................23-85
CUSHION FRAME - REAR - REMOVAL,
SEAT ..............................23-85
CUSTOMER PREFERENCES - STANDARD
PROCEDURE, RKE TRANSMITTER........8N-8
CV JOINT-INNER - INSTALLATION........3-25
CV JOINT-INNER - REMOVAL............3-25
CV JOINT-OUTER - INSTALLATION........3-23
CV JOINT-OUTER - REMOVAL............3-22
CYLINDER - DESCRIPTION, MASTER......5-24
CYLINDER - DIAGNOSIS AND TESTING,
IGNITION SWITCH AND KEY LOCK.......19-11
CYLINDER - INSTALLATION, KEY........19-12
CYLINDER - INSTALLATION, LOAD
FLOOR SUPPORT....................23-72
CYLINDER - INSTALLATION, LOCK.......23-24
CYLINDER - INSTALLATION, SUPPORT....23-48
CYLINDER - OPERATION, MASTER........5-25
CYLINDER - REMOVAL, KEY............19-12
CYLINDER - REMOVAL, LOAD FLOOR
SUPPORT..........................23-72
CYLINDER - REMOVAL, LOCK...........23-24
CYLINDER - REMOVAL, SUPPORT.......23-48
CYLINDER BLEEDING - STANDARD
PROCEDURE, MASTER.................5-26
CYLINDER BLOCK REFACING -
STANDARD PROCEDURE...............9-264
CYLINDER BORE - DE-GLAZE -
STANDARD PROCEDURE...............9-264
CYLINDER BORE HONING - STANDARD
PROCEDURE....................9-128,9-38
CYLINDER BORE REPAIR - STANDARD
PROCEDURE
........................9-265
CYLINDER COMBUSTION PRESSURE
LEAKAGE - DIAGNOSIS AND TESTING
. 9-186,9-8,
9-93
CYLINDER COMPRESSION PRESSURE -
DIAGNOSIS AND TESTING
......9-186,9-8,9-93
CYLINDER COMPRESSION/LEAKAGE
TESTS - DIAGNOSIS AND TESTING
......9-239
CYLINDER HEAD - CLEANING
......9-200,9-251CYLINDER HEAD - DESCRIPTION . . . 9-107,9-249
CYLINDER HEAD - INSPECTION....9-200,9-252
CYLINDER HEAD - INSTALLATION.......9-200
CYLINDER HEAD - INSTALLATION, LEFT . . 9-112
CYLINDER HEAD - INSTALLATION,
RIGHT.............................9-113
CYLINDER HEAD - LEFT - INSTALLATION . . . 9-24
CYLINDER HEAD - LEFT - REMOVAL......9-22
CYLINDER HEAD - OPERATION..........9-199
CYLINDER HEAD - REMOVAL......9-200,9-249
CYLINDER HEAD - REMOVAL, LEFT......9-108
CYLINDER HEAD - REMOVAL, RIGHT.....9-110
CYLINDER HEAD - RIGHT -
INSTALLATION........................9-34
CYLINDER HEAD - RIGHT - REMOVAL.....9-33
CYLINDER HEAD COVER -
INSTALLATION.......................9-255
CYLINDER HEAD COVER - REMOVAL.....9-255
CYLINDER HEAD COVER(S) -
DESCRIPTION...................9-122,9-27
CYLINDER HEAD COVER(S) -
INSTALLATION...............9-201,9-28,9-37
CYLINDER HEAD COVER(S) - REMOVAL . . 9-201,
9-28,9-37
CYLINDER HEAD GASKET - DIAGNOSIS
AND TESTING........................9-21
CYLINDER HEAD GASKET FAILURE -
DIAGNOSIS AND TESTING.............9-199
CYLINDER/POWER BOOSTER -
DIAGNOSIS AND TESTING, MASTER........5-25
DAM - INSTALLATION, FRONT AIR........13-2
DAM - REMOVAL, FRONT AIR...........13-2
DAMAGED OR WORN THREADS -
STANDARD PROCEDURE, REPAIR . . 9-190,9-240,
9-9,9-94
DAMPER - INSPECTION, VIBRATION.....9-285
DAMPER - INSTALLATION..............19-36
DAMPER - INSTALLATION, VIBRATION . . . 9-144,
9-215,9-286,9-56
DAMPER - REMOVAL.................19-36
DAMPER - REMOVAL, VIBRATION . . 9-144,9-215,
9-285,9-55
DATA LINK CONNECTOR - DESCRIPTION . . . 8E-3
DATA LINK CONNECTOR - OPERATION.....8E-3
DATA PLATE - DESCRIPTION, ENGINE....9-248
DAY / NIGHT MIRROR - DESCRIPTION,
AUTOMATIC........................8N-11
DAY / NIGHT MIRROR - DIAGNOSIS AND
TESTING, AUTOMATIC................8N-11
DAY / NIGHT MIRROR - OPERATION,
AUTOMATIC........................8N-11
DAY / NIGHT MIRROR - REMOVAL,
AUTOMATIC........................8N-12
DEFINITION - DESCRIPTION, TRIP........25-4
DEFOGGER RELAY - DESCRIPTION,
REAR WINDOW.......................8G-2
DEFOGGER RELAY - INSTALLATION,
REAR WINDOW.......................8G-4
DEFOGGER RELAY - OPERATION, REAR
WINDOW............................8G-3
DEFOGGER RELAY - REMOVAL, REAR
WINDOW............................8G-3
DEFOGGER SWITCH - DESCRIPTION,
REAR WINDOW.......................8G-4
DEFOGGER SWITCH - OPERATION, REAR
WINDOW............................8G-4
DEFOGGER SYSTEM - DIAGNOSIS AND
TESTING, REAR WINDOW
..............8G-2
DEFROST DOOR - INSTALLATION
........24-31
DEFROST DOOR - REMOVAL
...........24-31
DEFROST DOOR ACTUATOR -
DESCRIPTION
.......................24-20
DEFROST DOOR ACTUATOR -
INSTALLATION
.......................24-21
DEFROST DOOR ACTUATOR -
OPERATION
.........................24-21
DEFROST DOOR ACTUATOR - REMOVAL
. . 24-21
DEFROSTER DUCT - INSTALLATION
......24-32
DEFROSTER DUCT - REMOVAL
..........24-32
DE-GLAZE - STANDARD PROCEDURE,
CYLINDER BORE
.....................9-264
DEMAGNETIZING - STANDARD
PROCEDURE, COMPASS
...............8M-4
DEMISTER DUCTS - INSTALLATION,
INSTRUMENT PANEL
..................24-37
DEMISTER DUCTS - REMOVAL,
INSTRUMENT PANEL
..................24-36
DRINDEX 9
Description Group-Page Description Group-Page Description Group-Page

FRONT SERVO - DESCRIPTION.........21-208
FRONT SERVO - DISASSEMBLY........21-209
FRONT SERVO - INSPECTION..........21-209
FRONT SERVO - OPERATION..........21-208
FRONT SKID PLATE - INSTALLATION.....13-23
FRONT SKID PLATE - REMOVAL.........13-23
FRONT SUSPENSION - DESCRIPTION,
GEAR - INDEPENDENT................19-17
FRONT SUSPENSION - INSTALLATION,
GEAR - INDEPENDENT................19-18
FRONT SUSPENSION - REMOVAL, GEAR
- INDEPENDENT.....................19-17
FRONT SUSPENSION, SPECIAL TOOLS....2-12
FRONT TOW HOOK ASSEMBLY -
INSTALLATION.......................13-23
FRONT TOW HOOK ASSEMBLY -
REMOVAL..........................13-23
FRONT WHEEL SPEED SENSOR -
DESCRIPTION........................5-47
FRONT WHEEL SPEED SENSOR -
INSTALLATION........................5-48
FRONT WHEEL SPEED SENSOR -
OPERATION..........................5-47
FRONT WHEEL SPEED SENSOR -
REMOVAL...........................5-48
FRONT WHEELHOUSE SPLASH SHIELD -
INSTALLATION.......................23-41
FRONT WHEELHOUSE SPLASH SHIELD -
REMOVAL..........................23-41
FUEL CONTROL ACTUATOR -
DESCRIPTION.......................14-74
FUEL CONTROL ACTUATOR -
OPERATION.........................14-74
FUEL CONTROL ACTUATOR - REMOVAL . . . 14-74
FUEL DELIVERY - GAS - DESCRIPTION....14-1
FUEL DELIVERY - GAS - OPERATION......14-2
FUEL DRAIN CIRCUIT - OPERATION......14-67
FUEL FILL DOOR - INSTALLATION.......23-39
FUEL FILL DOOR - REMOVAL...........23-39
FUEL FILLER CAP - DESCRIPTION.......25-13
FUEL FILLER CAP - OPERATION.........25-13
FUEL FILTER - STANDARD
PROCEDURES, WATER DRAINING AT.....14-47
FUEL FILTER / WATER SEPARATOR -
DESCRIPTION.......................14-50
FUEL FILTER / WATER SEPARATOR -
INSTALLATION.......................14-50
FUEL FILTER / WATER SEPARATOR -
OPERATION.........................14-50
FUEL FILTER / WATER SEPARATOR -
REMOVAL..........................14-50
FUEL FILTER/PRESSURE REGULATOR -
DESCRIPTION........................14-5
FUEL FILTER/PRESSURE REGULATOR -
OPERATION..........................14-6
FUEL GAUGE - DESCRIPTION...........8J-26
FUEL GAUGE - OPERATION.............8J-26
FUEL HEATER - DESCRIPTION..........14-51
FUEL HEATER - DIAGNOSIS AND
TESTING...........................14-52
FUEL HEATER - OPERATION............14-51
FUEL HEATER RELAY - DESCRIPTION....14-52
FUEL HEATER RELAY - INSTALLATION....14-53
FUEL HEATER RELAY - OPERATION......14-52
FUEL HEATER RELAY - REMOVAL........14-52
FUEL INDICATOR - DESCRIPTION, LOW . . . 8J-30
FUEL INDICATOR - OPERATION, LOW.....8J-30
FUEL INJECTION PUMP - DESCRIPTION . . 14-53
FUEL INJECTION PUMP - INSTALLATION . . 14-55
FUEL INJECTION PUMP - OPERATION....14-53
FUEL INJECTION PUMP - REMOVAL......14-54
FUEL INJECTION PUMP TIMING -
DIAGNOSIS AND TESTING.............14-53
FUEL INJECTOR - DESCRIPTION....14-26,14-74
FUEL INJECTOR - INSTALLATION........14-77
FUEL INJECTOR - OPERATION.....14-26,14-74
FUEL INJECTOR - REMOVAL............14-75
FUEL INJECTOR FIRING ORDER, DIESEL . . 14-48
FUEL INJECTOR RAIL - DESCRIPTION....14-78
FUEL INJECTOR RAIL - INSTALLATION....14-78
FUEL INJECTOR RAIL - OPERATION
......14-78
FUEL INJECTOR RAIL - REMOVAL
.......14-78
FUEL LEVEL SENDING UNIT / SENSOR -
DESCRIPTION
...................14-57,14-6
FUEL LEVEL SENDING UNIT / SENSOR -
INSTALLATION
........................14-7
FUEL LEVEL SENDING UNIT / SENSOR -
OPERATION
.....................14-57,14-6FUEL LEVEL SENDING UNIT / SENSOR -
REMOVAL...........................14-7
FUEL LINE LEAKS - DIAGNOSIS AND
TESTING, HIGH-PRESSURE.............14-58
FUEL LINES - DESCRIPTION........14-57,14-7
FUEL LINES - INSTALLATION...........14-60
FUEL LINES - OPERATION..............14-57
FUEL LINES - REMOVAL...............14-58
FUEL PRESSURE LIMITING VALVE -
DESCRIPTION.......................14-61
FUEL PRESSURE LIMITING VALVE -
INSTALLATION.......................14-61
FUEL PRESSURE LIMITING VALVE -
OPERATION.........................14-61
FUEL PRESSURE LIMITING VALVE -
REMOVAL..........................14-61
FUEL PRESSURE SENSOR -
DESCRIPTION.......................14-60
FUEL PRESSURE SENSOR -
INSTALLATION.......................14-61
FUEL PRESSURE SENSOR - OPERATION . . 14-60
FUEL PRESSURE SENSOR - REMOVAL....14-60
FUEL PUMP - DESCRIPTION............14-11
FUEL PUMP - OPERATION.............14-11
FUEL PUMP MODULE - DESCRIPTION....14-11
FUEL PUMP MODULE - INSTALLATION . . . 14-12
FUEL PUMP MODULE - OPERATION......14-11
FUEL PUMP MODULE - REMOVAL.......14-12
FUEL PUMP RELAY - DESCRIPTION......14-27
FUEL PUMP RELAY - INSTALLATION.....14-28
FUEL PUMP RELAY - OPERATION........14-27
FUEL PUMP RELAY - REMOVAL.........14-28
FUEL PUMP RELAYS - DIAGNOSIS AND
TESTING, ASD........................8I-5
FUEL RAIL - DESCRIPTION.............14-12
FUEL RAIL - INSTALLATION............14-15
FUEL RAIL - OPERATION...............14-12
FUEL RAIL - REMOVAL................14-13
FUEL REQUIREMENTS - DIESEL ENGINE
- DESCRIPTION........................0-1
FUEL SENSOR - DESCRIPTION, WATER
IN ................................14-66
FUEL SENSOR - OPERATION, WATER IN . . 14-66
FUEL SENSOR - REMOVAL, WATER IN....14-66
FUEL SYSTEM - DESCRIPTION, DIESEL . . . 14-45
FUEL SYSTEM - DIESEL ENGINE -
TORQUE............................14-48
FUEL SYSTEM - EXCEPT DIESEL -
TORQUE............................14-3
FUEL SYSTEM PARTS - STANDARD
PROCEDURES, CLEANING..............14-47
FUEL SYSTEM PRESSURE RELEASE -
STANDARD PROCEDURE................14-2
FUEL SYSTEM PRESSURE,
SPECIFICATIONS......................14-3
FUEL SYSTEM PRIMING - STANDARD
PROCEDURE........................14-47
FUEL SYSTEM, SPECIAL TOOLS..........14-5
FUEL SYSTEM, SPECIAL TOOLS -
DIESEL............................14-49
FUEL TANK - DESCRIPTION............14-17
FUEL TANK - OPERATION..............14-17
FUEL TANK MODULE - DESCRIPTION.....14-63
FUEL TANK MODULE - INSTALLATION....14-64
FUEL TANK MODULE - OPERATION......14-63
FUEL TANK MODULE - REMOVAL........14-63
FUEL TRANSFER PUMP - DESCRIPTION . . 14-64
FUEL TRANSFER PUMP - INSTALLATION . . 14-65
FUEL TRANSFER PUMP - OPERATION....14-64
FUEL TRANSFER PUMP - REMOVAL......14-64
FULL SIZE, SPARE WHEEL WITH
MATCHING TIRE - DESCRIPTION........22-15
FUNCTIONS - DESCRIPTION, CIRCUIT . . 8W-01-6
FUSE - DESCRIPTION, IOD...........8W-97-6
FUSE - INSTALLATION, IOD..........8W-97-7
FUSE - OPERATION, IOD.............8W-97-6
FUSE - REMOVAL, IOD..............8W-97-7
FUSES POWERING SEVERAL LOADS -
STANDARD PROCEDURE, TESTING
FOR A SHORT TO GROUND ON......8W-01-10
GAP AND FLUSH - SPECIFICATIONS......23-95
GAS ENGINE - DIAGNOSIS AND TESTING
. . 11-4
GAS ENGINE - INSTALLATION
...........19-26
GAS ENGINE - REMOVAL
..............19-25
GAS ENGINES - CLEANING, RADIATOR
FAN
................................7-34
GAS ENGINES - DESCRIPTION, COOLANT
RECOVERY CONTAINER
................7-33GAS ENGINES - INSPECTION, RADIATOR
FAN ................................7-34
GAS ENGINES - INSTALLATION,
COOLANT RECOVERY CONTAINER........7-33
GAS ENGINES - INSTALLATION,
RADIATOR FAN.......................7-34
GAS ENGINES - OPERATION, COOLANT
RECOVERY CONTAINER................7-33
GAS ENGINES - REMOVAL, COOLANT
RECOVERY CONTAINER................7-33
GAS ENGINES - REMOVAL, RADIATOR
FAN ................................7-33
GAS ENGINES - STANDARD
PROCEDURE, DRAINING COOLING
SYSTEM - ALL........................7-17
GAS ENGINES - STANDARD
PROCEDURE, REFILLING COOLING
SYSTEM - ALL........................7-18
GASKET - DIAGNOSIS AND TESTING,
CYLINDER HEAD......................9-21
GASKET FAILURE - DIAGNOSIS AND
TESTING, CYLINDER HEAD.............9-199
GASKET SELECTION - STANDARD
PROCEDURE, HEAD...................9-281
GASKET SURFACE PREPARATION -
STANDARD PROCEDURE, ENGINE........9-10
GASKETS AND SEALERS - STANDARD
PROCEDURE, FORM-IN-PLACE . . . 9-239,9-9,9-94
GAUGE - DESCRIPTION, ENGINE
TEMPERATURE......................8J-24
GAUGE - DESCRIPTION, FUEL...........8J-26
GAUGE - DESCRIPTION, OIL PRESSURE . . 8J-33
GAUGE - DESCRIPTION, VOLTAGE.......8J-42
GAUGE - OPERATION, ENGINE
TEMPERATURE......................8J-24
GAUGE - OPERATION, FUEL............8J-26
GAUGE - OPERATION, OIL PRESSURE....8J-33
GAUGE - OPERATION, VOLTAGE.........8J-43
GAUGES - DIAGNOSIS AND TESTING,
PRESSURE..........................22-7
GAUGES INDICATOR - DESCRIPTION,
CHECK.............................8J-21
GAUGES INDICATOR - OPERATION,
CHECK.............................8J-21
GEAR - DESCRIPTION, CRANKSHAFT.....9-273
GEAR - INDEPENDENT FRONT
SUSPENSION - DESCRIPTION...........19-17
GEAR - INDEPENDENT FRONT
SUSPENSION - INSTALLATION..........19-18
GEAR - INDEPENDENT FRONT
SUSPENSION - REMOVAL..............19-17
GEAR - INSTALLATION................9-273
GEAR - INSTALLATION, PINION
GEAR/RING......................3-51,3-77
GEAR - LINK/COIL - DESCRIPTION.......19-20
GEAR - LINK/COIL - INSTALLATION......19-21
GEAR - LINK/COIL - OPERATION........19-20
GEAR - LINK/COIL - REMOVAL..........19-20
GEAR - REMOVAL....................9-273
GEAR - REMOVAL, PINION GEAR/RING....3-49,
3-75
GEAR HOUSING - INSTALLATION........9-300
GEAR HOUSING - REMOVAL............9-299
GEAR HOUSING COVER - INSTALLATION . . 9-301
GEAR HOUSING COVER - REMOVAL
.....9-301
GEAR INPUT SHAFT SEAL -
INSTALLATION, STEERING
.............19-29
GEAR INPUT SHAFT SEAL - REMOVAL,
STEERING
..........................19-27
GEAR SELECTOR INDICATOR -
DESCRIPTION
.......................8J-27
GEAR SELECTOR INDICATOR -
OPERATION
.........................8J-27
GEAR SHIFT LEVER - INSTALLATION
.....19-12
GEAR SHIFT LEVER - REMOVAL
.........19-12
GEAR, SPECIAL TOOLS - POWER
STEERING
..........................19-23
GEAR, SPECIFICATIONS - POWER
STEERING
..........................19-22
GEAR TO COOLER - INSTALLATION,
RETURN HOSE
.................19-44,19-45
GEAR TO COOLER - REMOVAL, RETURN
HOSE
.........................19-44,19-45
GEAR/RING GEAR - INSTALLATION,
PINION
.........................3-51,3-77
GEAR/RING GEAR - REMOVAL, PINION
....3-49,
3-75
14 INDEXDR
Description Group-Page Description Group-Page Description Group-Page

GEAR/RING GEAR/TONE RING -
INSTALLATION, PINION......3-108,3-137,3-164
GEAR/RING GEAR/TONE RING -
REMOVAL, PINION.........3-106,3-134,3-162
GEARSHIFT CABLE - DIAGNOSIS AND
TESTING....................21-210,21-368
GEARSHIFT CABLE - INSTALLATION....21-211,
21-370
GEARSHIFT CABLE - REMOVAL . . 21-210,21-369
GEARSHIFT CABLE, ADJUSTMENTS.....21-212,
21-370
GEAR/TONE RING - INSTALLATION,
PINION GEAR/RING.........3-108,3-137,3-164
GEAR/TONE RING - REMOVAL, PINION
GEAR/RING...............3-106,3-134,3-162
GEARTRAIN - ASSEMBLY, PLANETARY . . . 21-397
GEARTRAIN - CLEANING, PLANETARY . . . 21-396
GEARTRAIN - DESCRIPTION,
PLANETARY........................21-395
GEARTRAIN - DISASSEMBLY,
PLANETARY........................21-396
GEARTRAIN - INSPECTION, PLANETARY . 21-397
GEARTRAIN - OPERATION, PLANETARY . . 21-396
GEARTRAIN/OUTPUT SHAFT -
ASSEMBLY, PLANETARY..............21-244
GEARTRAIN/OUTPUT SHAFT -
DESCRIPTION, PLANETARY............21-241
GEARTRAIN/OUTPUT SHAFT -
DISASSEMBLY, PLANETARY...........21-242
GEARTRAIN/OUTPUT SHAFT -
INSPECTION, PLANETARY.............21-243
GEARTRAIN/OUTPUT SHAFT -
OPERATION, PLANETARY.............21-241
GENERAL - WARNINGS.............8W-01-7
GENERATOR / CHARGING SYSTEM -
SPECIFICATIONS, TORQUE.............8F-20
GENERATOR - DESCRIPTION...........8F-21
GENERATOR - INSTALLATION...........8F-24
GENERATOR - OPERATION.............8F-21
GENERATOR - REMOVAL...............8F-22
GENERATOR RATINGS, SPECIFICATIONS . . 8F-20
GENII - ASSEMBLY, TRANSFER CASE -
NV241............................21-428
GENII - ASSEMBLY, TRANSFER CASE -
NV244............................21-525
GENII - CLEANING, TRANSFER CASE -
NV241............................21-426
GENII - CLEANING, TRANSFER CASE -
NV244............................21-523
GENII - DESCRIPTION, TRANSFER CASE
- NV241...........................21-415
GENII - DESCRIPTION, TRANSFER CASE
- NV244...........................21-512
GENII - DIAGNOSIS AND TESTING,
TRANSFER CASE - NV241.............21-416
GENII - DISASSEMBLY, TRANSFER CASE
- NV241...........................21-417
GENII - DISASSEMBLY, TRANSFER CASE
- NV244...........................21-514
GENII - INSPECTION, TRANSFER CASE -
NV241............................21-426
GENII - INSPECTION, TRANSFER CASE -
NV244............................21-523
GENII - INSTALLATION, TRANSFER CASE
- NV241...........................21-438
GENII - INSTALLATION, TRANSFER CASE
- NV244...........................21-534
GENII - OPERATION, TRANSFER CASE -
NV241............................21-415
GENII - OPERATION, TRANSFER CASE -
NV244............................21-513
GENII - REMOVAL, TRANSFER CASE -
NV241............................21-417
GENII - REMOVAL, TRANSFER CASE -
NV244............................21-514
GENII - TRANSFER CASE, NV241.......21-438
GENII - TRANSFER CASE, NV244.......21-535
GLASS - DESCRIPTION, HEATED.........8G-1
GLASS - INSTALLATION, BACKLITE VENT . 23-87
GLASS - INSTALLATION, DOOR....23-20,23-30
GLASS - INSTALLATION, SIDE VIEW
MIRROR...........................23-43
GLASS - OPERATION, HEATED
...........8G-1
GLASS - REMOVAL, BACKLITE VENT
.....23-87
GLASS - REMOVAL, DOOR
........23-20,23-30
GLASS - REMOVAL, SIDE VIEW MIRROR
. . 23-42
GLASS RUN CHANNEL - INSTALLATION
. . 23-22,
23-31GLASS RUN CHANNEL - REMOVAL . 23-21,23-30
GLASS RUN WEATHERSTRIP -
INSTALLATION, FRONT DOOR...........23-92
GLASS RUN WEATHERSTRIP -
INSTALLATION, REAR DOOR............23-93
GLASS RUN WEATHERSTRIP -
REMOVAL, FRONT DOOR..............23-92
GLASS RUN WEATHERSTRIP -
REMOVAL, REAR DOOR...............23-93
GLOVE BOX - INSTALLATION...........23-52
GLOVE BOX - REMOVAL...............23-52
GLOVE BOX LAMP/SWITCH -
INSTALLATION.......................8L-28
GLOVE BOX LAMP/SWITCH - REMOVAL . . . 8L-27
GLOVE BOX LATCH - INSTALLATION.....23-52
GLOVE BOX LATCH - REMOVAL.........23-52
GOVERNOR - DESCRIPTION,
ELECTRONIC.......................21-197
GOVERNOR - INSTALLATION,
ELECTRONIC.......................21-200
GOVERNOR - OPERATION, ELECTRONIC . 21-198
GOVERNOR - REMOVAL, ELECTRONIC . . . 21-199
GRAB HANDLE - INSTALLATION,
B-PILLAR...........................23-68
GRAB HANDLE - REMOVAL, B-PILLAR....23-68
GRID LINE AND TERMINAL REPAIR -
STANDARD PROCEDURE...............8G-4
GRILLE - INSTALLATION...............23-40
GRILLE - INSTALLATION, COWL.........23-38
GRILLE - REMOVAL....................23-40
GRILLE - REMOVAL, COWL............23-38
GRILLE FRAME - INSTALLATION.........23-40
GRILLE FRAME - REMOVAL............23-40
GROUND - STANDARD PROCEDURE,
TESTING FOR A SHORT TO..........8W-01-9
GROUND AND SPLICE INFORMATION -
DESCRIPTION, CONNECTOR..........8W-01-7
GROUND ON FUSES POWERING
SEVERAL LOADS - STANDARD
PROCEDURE, TESTING FOR A SHORT
TO.............................8W-01-10
GROUND STRAP - DESCRIPTION, RADIO
NOISE SUPPRESSION..................8A-9
GROUND STRAP - INSTALLATION,
RADIO NOISE SUPPRESSION...........8A-10
GROUND STRAP - OPERATION, RADIO
NOISE SUPPRESSION..................8A-9
GROUND STRAP - REMOVAL, RADIO
NOISE SUPPRESSION..................8A-9
GROUNDS - DESCRIPTION, POWER......8E-10
GUIDE SEALS - DESCRIPTION, VALVE . 9-32,9-38
GUIDES - DESCRIPTION, VALVE....9-107,9-202
GUIDES AND SPRINGS - STANDARD
PROCEDURE, VALVES.................9-256
HALF SHAFT - CAUTION................3-20
HALF SHAFT - DIAGNOSIS AND TESTING . . 3-20
HALF SHAFT - INSTALLATION............3-21
HALF SHAFT - REMOVAL...............3-20
HALF SHAFT - SPECIAL TOOLS..........3-21
HALF SHAFT - SPECIFICATIONS..........3-21
HANDLE - INSTALLATION, A-PILLAR
TRIM/GRAB.........................23-63
HANDLE - INSTALLATION, B-PILLAR
GRAB..............................23-68
HANDLE - INSTALLATION, EXTERIOR
....23-21,
23-30
HANDLE - INSTALLATION, RELEASE
.......5-44
HANDLE - REMOVAL, A-PILLAR
TRIM/GRAB
.........................23-63
HANDLE - REMOVAL, B-PILLAR GRAB
....23-68
HANDLE - REMOVAL, EXTERIOR
. . . 23-20,23-30
HANDLE - REMOVAL, RELEASE
..........5-44
HANDLE ACTUATOR - INSTALLATION,
INSIDE
........................23-22,23-32
HANDLE ACTUATOR - REMOVAL, INSIDE
. 23-22,
23-31
HANDLE/BEZEL - INSTALLATION,
LUMBAR SUPPORT
...................23-82
HANDLE/BEZEL - REMOVAL, LUMBAR
SUPPORT
..........................23-82
HANDLE/LATCH REMOTE -
INSTALLATION, RELEASE
..............23-17
HANDLE/LATCH REMOTE - REMOVAL,
RELEASE
...........................23-17
HANDLING NON-DEPLOYED
SUPPLEMENTAL RESTRAINTS -
STANDARD PROCEDURE
...............8O-6HANDLING TUBING AND FITTINGS -
STANDARD PROCEDURE...............24-45
HANDS FREE MODULE - INSTALLATION....8T-2
HANDS FREE MODULE - REMOVAL.......8T-2
HARNESS - DIAGNOSIS AND TESTING,
WIRING..........................8W-01-7
HAZARD SWITCH - DESCRIPTION.......8L-14
HAZARD SWITCH - OPERATION.........8L-14
HCU (HYDRAULIC CONTROL UNIT) -
DESCRIPTION........................5-49
HCU (HYDRAULIC CONTROL UNIT) -
INSTALLATION........................5-50
HCU (HYDRAULIC CONTROL UNIT) -
OPERATION..........................5-49
HCU (HYDRAULIC CONTROL UNIT) -
REMOVAL...........................5-50
HEAD - CLEANING, CYLINDER.....9-200,9-251
HEAD - DESCRIPTION, CYLINDER . . 9-107,9-249
HEAD - INSPECTION, CYLINDER....9-200,9-252
HEAD - INSTALLATION, CYLINDER.......9-200
HEAD - INSTALLATION, LEFT CYLINDER . . 9-112
HEAD - INSTALLATION, RIGHT
CYLINDER..........................9-113
HEAD - LEFT - INSTALLATION,
CYLINDER...........................9-24
HEAD - LEFT - REMOVAL, CYLINDER......9-22
HEAD - OPERATION, CYLINDER.........9-199
HEAD - REMOVAL, CYLINDER.....9-200,9-249
HEAD - REMOVAL, LEFT CYLINDER......9-108
HEAD - REMOVAL, RIGHT CYLINDER.....9-110
HEAD - RIGHT - INSTALLATION,
CYLINDER...........................9-34
HEAD - RIGHT - REMOVAL, CYLINDER....9-33
HEAD COVER - INSTALLATION,
CYLINDER..........................9-255
HEAD COVER - REMOVAL, CYLINDER....9-255
HEAD COVER(S) - DESCRIPTION,
CYLINDER......................9-122,9-27
HEAD COVER(S) - INSTALLATION,
CYLINDER..................9-201,9-28,9-37
HEAD COVER(S) - REMOVAL, CYLINDER . 9-201,
9-28,9-37
HEAD GASKET - DIAGNOSIS AND
TESTING, CYLINDER...................9-21
HEAD GASKET FAILURE - DIAGNOSIS
AND TESTING, CYLINDER..............9-199
HEAD GASKET SELECTION - STANDARD
PROCEDURE........................9-281
HEADLAMP - INSTALLATION............8L-14
HEADLAMP - REMOVAL...............8L-14
HEADLAMP SWITCH - DESCRIPTION.....8L-14
HEADLAMP SWITCH - INSTALLATION....8L-15
HEADLAMP SWITCH - OPERATION.......8L-14
HEADLAMP SWITCH - REMOVAL........8L-14
HEADLAMP SWITCH BEZEL -
INSTALLATION, INSTRUMENT PANEL.....23-56
HEADLAMP SWITCH BEZEL - REMOVAL,
INSTRUMENT PANEL..................23-56
HEADLAMP UNIT - ADJUSTMENTS......8L-16
HEADLAMP UNIT - INSTALLATION.......8L-15
HEADLAMP UNIT - REMOVAL...........8L-15
HEADLINER - INSTALLATION...........23-68
HEADLINER - REMOVAL...............23-68
HEADREST - INSTALLATION............23-80
HEADREST - REMOVAL................23-80
HEADREST SLEEVE - INSTALLATION.....23-81
HEADREST SLEEVE - REMOVAL.........23-81
HEAT SHIELDS - DESCRIPTION..........11-8
HEAT SHIELDS - INSTALLATION..........11-8
HEAT SHIELDS - REMOVAL.............11-8
HEAT STAKING - STANDARD
PROCEDURE.........................23-3
HEATED GLASS - DESCRIPTION..........8G-1
HEATED GLASS - OPERATION...........8G-1
HEATED MIRRORS - DESCRIPTION.......8G-6
HEATED MIRRORS - OPERATION.........8G-6
HEATED SEAT ELEMENT - DESCRIPTION . . . 8G-9
HEATED SEAT ELEMENT - DIAGNOSIS
AND TESTING.......................8G-10
HEATED SEAT ELEMENT - INSTALLATION . 8G-10
HEATED SEAT ELEMENT - OPERATION....8G-10
HEATED SEAT ELEMENT - REMOVAL
.....8G-10
HEATED SEAT MODULE - DESCRIPTION
....8E-6
HEATED SEAT MODULE - DESCRIPTION
. . 8G-13
HEATED SEAT MODULE - DIAGNOSIS
AND TESTING
........................8E-6
HEATED SEAT MODULE - DIAGNOSIS
AND TESTING
.......................8G-14
DRINDEX 15
Description Group-Page Description Group-Page Description Group-Page

HEATED SEAT MODULE - INSTALLATION . . . 8E-7
HEATED SEAT MODULE - INSTALLATION . . 8G-15
HEATED SEAT MODULE - OPERATION.....8E-6
HEATED SEAT MODULE - OPERATION....8G-14
HEATED SEAT MODULE - REMOVAL.......8E-7
HEATED SEAT MODULE - REMOVAL.....8G-15
HEATED SEAT SENSOR - DESCRIPTION . . . 8G-11
HEATED SEAT SENSOR - DIAGNOSIS
AND TESTING.......................8G-11
HEATED SEAT SENSOR - OPERATION....8G-11
HEATED SEAT SENSOR - REMOVAL......8G-11
HEATED SEAT SWITCH - DESCRIPTION . . . 8G-11
HEATED SEAT SWITCH - DIAGNOSIS
AND TESTING.......................8G-12
HEATED SEAT SWITCH - INSTALLATION . . 8G-13
HEATED SEAT SWITCH - OPERATION.....8G-12
HEATED SEAT SWITCH - REMOVAL......8G-13
HEATED SEAT SYSTEM - DESCRIPTION....8G-7
HEATED SEAT SYSTEM - DIAGNOSIS
AND TESTING........................8G-8
HEATED SEAT SYSTEM - OPERATION.....8G-8
HEATER - 5.9L DIESEL - DESCRIPTION,
ENGINE BLOCK.......................7-37
HEATER - 5.9L DIESEL - INSTALLATION,
ENGINE BLOCK.......................7-38
HEATER - 5.9L DIESEL - OPERATION,
ENGINE BLOCK.......................7-38
HEATER - 5.9L DIESEL - REMOVAL,
ENGINE BLOCK.........................7-38
HEATER - DESCRIPTION, ENGINE BLOCK . . . 7-36
HEATER - DESCRIPTION, FUEL..........14-51
HEATER - DESCRIPTION, INTAKE AIR.....14-80
HEATER - DIAGNOSIS AND TESTING,
ENGINE BLOCK.......................7-36
HEATER - DIAGNOSIS AND TESTING,
FUEL..............................14-52
HEATER - INSTALLATION, ENGINE
BLOCK..............................7-37
HEATER - INSTALLATION, INTAKE AIR....14-80
HEATER - OPERATION, ENGINE BLOCK....7-36
HEATER - OPERATION, FUEL............14-51
HEATER - OPERATION, INTAKE AIR......14-80
HEATER - REMOVAL, ENGINE BLOCK......7-37
HEATER - REMOVAL, INTAKE AIR........14-80
HEATER AND AIR CONDITIONER -
DESCRIPTION........................24-1
HEATER AND AIR CONDITIONER -
OPERATION..........................24-1
HEATER CONTROL - DESCRIPTION, A/C . . . 24-14
HEATER CONTROL - INSTALLATION, A/C . . 24-15
HEATER CONTROL - REMOVAL, A/C......24-15
HEATER CORE - DESCRIPTION..........24-63
HEATER CORE - INSTALLATION.........24-63
HEATER CORE - OPERATION............24-63
HEATER CORE - REMOVAL.............24-63
HEATER INLET HOSE - INSTALLATION....24-64
HEATER INLET HOSE - REMOVAL........24-64
HEATER PERFORMANCE TEST -
DIAGNOSIS AND TESTING..............24-6
HEATER RELAY - DESCRIPTION, FUEL....14-52
HEATER RELAY - DESCRIPTION, INTAKE
AIR ...............................14-82
HEATER RELAY - INSTALLATION, FUEL . . . 14-53
HEATER RELAY - INSTALLATION, INTAKE
AIR ...............................14-82
HEATER RELAY - OPERATION, FUEL......14-52
HEATER RELAY - OPERATION, INTAKE
AIR ...............................14-82
HEATER RELAY - REMOVAL, FUEL.......14-52
HEATER RELAY - REMOVAL, INTAKE AIR . . 14-82
HEATER RETURN HOSE - INSTALLATION . . 24-65
HEATER RETURN HOSE - REMOVAL......24-64
HEIGHT ADJUSTMENT - 4WD (LD) -
STANDARD PROCEDURE.................2-3
HEIGHT MEASUREMENT - 4WD (LD) -
STANDARD PROCEDURE.................2-3
HEMI ENGINE - INSTALLATION, 3.7L/4.7L
AND 5.7L......................24-59,24-73
HEMI ENGINE - REMOVAL, 3.7L/4.7L
AND 5.7L......................24-57,24-71
HIGH BEAM INDICATOR - DESCRIPTION
. . 8J-28
HIGH BEAM INDICATOR - OPERATION
....8J-28
HIGH MOUNTED STOP LAMP -
INSTALLATION, CENTER
...............8L-11
HIGH MOUNTED STOP LAMP -
REMOVAL, CENTER
...................8L-11
HIGH MOUNTED STOP LAMP UNIT -
INSTALLATION, CENTER
...............8L-11HIGH MOUNTED STOP LAMP UNIT -
REMOVAL, CENTER...................8L-11
HIGH PRESSURE RELIEF VALVE -
DESCRIPTION.......................24-48
HIGH PRESSURE RELIEF VALVE -
OPERATION.........................24-48
HIGH SPEEDS - DESCRIPTION, TIRE
PRESSURE..........................22-7
HIGH/LOW RELAY - DESCRIPTION,
WIPER.............................8R-20
HIGH/LOW RELAY - DIAGNOSIS AND
TESTING, WIPER.....................8R-21
HIGH/LOW RELAY - INSTALLATION,
WIPER.............................8R-22
HIGH/LOW RELAY - OPERATION, WIPER . . 8R-20
HIGH/LOW RELAY - REMOVAL, WIPER . . . 8R-21
HIGH-PRESSURE FUEL LINE LEAKS -
DIAGNOSIS AND TESTING.............14-58
HINGE - INSTALLATION.....23-16,23-22,23-31,
23-46
HINGE - INSTALLATION, CENTER SEAT
BACK..............................23-79
HINGE - REMOVAL....23-16,23-22,23-31,23-46
HINGE - REMOVAL, CENTER SEAT BACK . . 23-78
HINGE COVER - INSTALLATION, CENTER
SEAT BACK INERTIA..................23-77
HINGE COVER - REMOVAL, CENTER
SEAT BACK INERTIA..................23-77
HITCH - INSTALLATION, TRAILER........13-25
HITCH - REMOVAL, TRAILER...........13-25
HOAT COOLANT - DESCRIPTION..........7-32
HOISTING - STANDARD PROCEDURE......0-20
HOLDDOWN - DESCRIPTION, BATTERY . . . 8F-14
HOLDDOWN - INSTALLATION, BATTERY . . . 8F-14
HOLDDOWN - OPERATION, BATTERY.....8F-14
HOLDDOWN - REMOVAL, BATTERY......8F-14
HOLDER - INSTALLATION, CUP.........23-51
HOLDER - REMOVAL, CUP.............23-51
HOLDING CLUTCHES - DESCRIPTION....21-371
HOLDING CLUTCHES - OPERATION.....21-372
HOLE PLUG - INSTALLATION, CAMSHAFT
CORE..............................9-206
HOLE PLUG - REMOVAL, CAMSHAFT
CORE..............................9-205
HOLE REPAIR - DESCRIPTION,
THREADED........................Intro.-8
HONING - STANDARD PROCEDURE,
CYLINDER BORE.................9-128,9-38
HOOD - INSTALLATION................23-47
HOOD - REMOVAL....................23-46
HOOK - INSTALLATION, COAT...........23-66
HOOK - REMOVAL, COAT..............23-66
HOOK ASSEMBLY - INSTALLATION,
FRONT TOW........................13-23
HOOK ASSEMBLY - REMOVAL, FRONT
TOW ..............................13-23
HORN - DIAGNOSIS AND TESTING.......8H-1
HORN - INSTALLATION.................8H-2
HORN - REMOVAL....................8H-2
HORN SWITCH - DESCRIPTION..........8H-2
HORN SWITCH - DIAGNOSIS AND
TESTING............................8H-2
HORN SYSTEM - DESCRIPTION..........8H-1
HORN SYSTEM - DIAGNOSIS AND
TESTING............................8H-1
HORN SYSTEM - OPERATION............8H-1
HOSE - GEAR TO COOLER -
INSTALLATION, RETURN..........19-44,19-45
HOSE - GEAR TO COOLER - REMOVAL,
RETURN......................19-44,19-45
HOSE - INSTALLATION, FRONT BRAKE.....5-13
HOSE - INSTALLATION, HEATER INLET....24-64
HOSE - INSTALLATION, HEATER RETURN . 24-65
HOSE - INSTALLATION, PRESSURE . 19-44,19-45
HOSE - INSTALLATION, REAR BRAKE......5-12
HOSE - REMOVAL, FRONT..............5-12
HOSE - REMOVAL, HEATER INLET.......24-64
HOSE - REMOVAL, HEATER RETURN.....24-64
HOSE - REMOVAL, PRESSURE.....19-44,19-45
HOSE - REMOVAL, REAR BRAKE
.........5-11
HOSE - RESERVOIR TO COOLER -
INSTALLATION, RETURN
..........19-44,19-45
HOSE - RESERVOIR TO COOLER -
REMOVAL, RETURN
.............19-44,19-45
HOSE ASSEMBLY - INSTALLATION, REAR
TUBE
...............................5-13
HOSE ASSEMBLY - REMOVAL, REAR
TUBE
...............................5-12HOSE CLAMPS - DESCRIPTION...........7-3
HOSE CLAMPS - OPERATION.............7-5
HOSES/TUBES - DESCRIPTION, WASHER . 8R-11
HOSES/TUBES - OPERATION, WASHER . . . 8R-11
HOUSING - ASSEMBLY, HVAC...........24-35
HOUSING - DIAGNOSIS AND TESTING,
CLUTCH..............................6-7
HOUSING - DISASSEMBLY, HVAC........24-35
HOUSING - INSTALLATION, CLUTCH.......6-9
HOUSING - INSTALLATION, GEAR........9-300
HOUSING - INSTALLATION, HVAC........24-36
HOUSING - INSTALLATION, ROCKER.....9-255
HOUSING - REMOVAL, CLUTCH...........6-9
HOUSING - REMOVAL, GEAR...........9-299
HOUSING - REMOVAL, HVAC...........24-34
HOUSING - REMOVAL, ROCKER.........9-255
HOUSING BUSHING AND SEAL -
INSTALLATION, EXTENSION...........21-440
HOUSING BUSHING AND SEAL -
REMOVAL, EXTENSION...............21-440
HOUSING COVER - INSTALLATION, GEAR . 9-301
HOUSING COVER - REMOVAL, GEAR.....9-301
HOUSING FLUID LEAK - DIAGNOSIS AND
TESTING, CONVERTER.........21-144,21-318
HOUSING SEAL - INSTALLATION,
ADAPTER...............21-128,21-364,21-85
HOUSING SEAL - INSTALLATION,
EXTENSION . 21-128,21-201,21-507,21-536,21-85
HOUSING SEAL - REMOVAL, ADAPTER . . 21-128,
21-364,21-85
HOUSING SEAL - REMOVAL,
EXTENSION . 21-128,21-201,21-507,21-536,21-85
HOUSING SEAL AND DUST BOOT -
INSTALLATION, EXTENSION.....21-476,21-571
HOUSING SEAL AND DUST BOOT -
REMOVAL, EXTENSION.........21-476,21-571
HOW TO USE WIRING DIAGRAMS -
DESCRIPTION.....................8W-01-1
H-SECTION REPLACEMENT - STANDARD
PROCEDURE, REAR FRAME............13-13
HUB / BEARING - INSTALLATION.........2-32
HUB / BEARING - REMOVAL.............2-31
HVAC HOUSING - ASSEMBLY...........24-35
HVAC HOUSING - DISASSEMBLY........24-35
HVAC HOUSING - INSTALLATION........24-36
HVAC HOUSING - REMOVAL............24-34
HYDRAULIC BOOSTER - DIAGNOSIS
AND TESTING........................5-30
HYDRAULIC LASH ADJUSTER -
DIAGNOSIS AND TESTING.........9-125,9-32
HYDRAULIC PRESSURE TEST -
DIAGNOSIS AND TESTING......21-141,21-316
HYDRAULIC SCHEMATICS, SCHEMATICS
AND DIAGRAMS..............21-176,21-337
HYDRAULIC TAPPETS - DIAGNOSIS AND
TESTING...........................9-210
HYDRAULIC TAPPETS - INSTALLATION . . . 9-211
HYDRAULIC TAPPETS - REMOVAL.......9-211
HYDROBOOST - INSTALLATION..........5-27
HYDROBOOST - INSTALLATION, ALL
EXCEPT.............................5-27
HYDROBOOST - REMOVAL..............5-26
HYDROBOOST - REMOVAL, ALL EXCEPT . . . 5-26
HYDRO-BOOST BRAKE BOOSTER -
INSTALLATION........................5-32
HYDRO-BOOST BRAKE BOOSTER -
REMOVAL
...........................5-31
HYDROFORM FENDER RAIL REPAIR -
STANDARD PROCEDURE
...............13-11
HYDROSTATIC LOCK - STANDARD
PROCEDURE
...................9-190,9-240
IDENTIFICATION - DESCRIPTION,
FASTENER
.........................Intro.-5
IDENTIFICATION AND INFORMATION -
DESCRIPTION, SECTION
.............8W-01-6
IDENTIFICATION NUMBER -
DESCRIPTION, VEHICLE
..............Intro.-1
IDLE AIR CONTROL MOTOR -
DESCRIPTION
.......................14-28
IDLE AIR CONTROL MOTOR -
INSTALLATION
.......................14-29
IDLE AIR CONTROL MOTOR -
OPERATION
.........................14-28
IDLE AIR CONTROL MOTOR - REMOVAL
. . 14-29
IDLER SHAFT - INSTALLATION
......9-179,9-81
IDLER SHAFT - REMOVAL
..........9-179,9-81
IGNITION - SPECIFICATIONS, TORQUE
.....8I-3
16 INDEXDR
Description Group-Page Description Group-Page Description Group-Page

IGNITION CIRCUIT SENSE -
DESCRIPTION.......................8E-10
IGNITION CIRCUIT SENSE - OPERATION . . 8E-11
IGNITION COIL - DESCRIPTION..........8I-11
IGNITION COIL - INSTALLATION.........8I-14
IGNITION COIL - OPERATION............8I-12
IGNITION COIL - REMOVAL.............8I-13
IGNITION COIL CAPACITOR -
DESCRIPTION........................8I-21
IGNITION COIL CAPACITOR -
INSTALLATION.......................8I-21
IGNITION COIL CAPACITOR - OPERATION . . 8I-21
IGNITION COIL CAPACITOR - REMOVAL . . . 8I-21
IGNITION COIL RESISTANCE, 3.7L V-6.....8I-5
IGNITION COIL RESISTANCE, 4.7L V-8.....8I-5
IGNITION COIL RESISTANCE, 5.7L V-8.....8I-5
IGNITION CONTROL - DESCRIPTION.......8I-1
IGNITION SWITCH - DESCRIPTION........19-9
IGNITION SWITCH - DESCRIPTION,
KEY-IN.............................19-11
IGNITION SWITCH - DIAGNOSIS AND
TESTING............................19-9
IGNITION SWITCH - INSTALLATION......19-11
IGNITION SWITCH - OPERATION.........19-9
IGNITION SWITCH - REMOVAL..........19-10
IGNITION SWITCH AND KEY LOCK
CYLINDER - DIAGNOSIS AND TESTING . . . 19-11
IGNITION TIMING, SPECIFICATIONS.......8I-5
IGNITION-OFF DRAW TEST - STANDARD
PROCEDURE........................8F-11
IMMOBILIZER MODULE - DESCRIPTION,
SENTRY KEY........................8E-13
IMMOBILIZER MODULE - INSTALLATION,
SENTRY KEY........................8E-15
IMMOBILIZER MODULE - OPERATION,
SENTRY KEY........................8E-13
IMMOBILIZER MODULE - REMOVAL,
SENTRY KEY........................8E-15
IMMOBILIZER MODULE (SKIM) -
DESCRIPTION, SENTRY KEY.............8Q-1
IMMOBILIZER MODULE (SKIM) -
OPERATION, SENTRY KEY..............8Q-2
IMMOBILIZER SYSTEM INDICATOR
LAMP - DESCRIPTION, SENTRY KEY......8Q-5
IMMOBILIZER SYSTEM INDICATOR
LAMP - OPERATION, SENTRY KEY........8Q-5
IMMOBILIZER SYSTEM INITIALIZATION,
STANDARD PROCEDURE - SENTRY
KEY................................8Q-3
IMMOBILIZER SYSTEM (SKIS) -
DESCRIPTION, SENTRY KEY.............8Q-1
IMMOBILIZER SYSTEM (SKIS) -
OPERATION, SENTRY KEY..............8Q-2
IMMOBILIZER SYSTEM TRANSPONDER
PROGRAMMING, STANDARD
PROCEDURE - SENTRY KEY.............8Q-4
IMPACT SENSOR - DESCRIPTION, SIDE . . 8O-59
IMPACT SENSOR - OPERATION, SIDE....8O-59
INCORRECT FLUID LEVEL - DIAGNOSIS
AND TESTING, EFFECTS OF......21-201,21-366
INDEPENDENT FRONT SUSPENSION -
DESCRIPTION, GEAR..................19-17
INDEPENDENT FRONT SUSPENSION -
INSTALLATION, GEAR.................19-18
INDEPENDENT FRONT SUSPENSION -
REMOVAL, GEAR.....................19-17
INDICATOR - DESCRIPTION, ABS........8J-17
INDICATOR - DESCRIPTION, AIRBAG.....8J-18
INDICATOR - DESCRIPTION, BRAKE/
PARK BRAKE........................8J-19
INDICATOR - DESCRIPTION, CARGO
LAMP
..............................8J-20
INDICATOR - DESCRIPTION, CHECK
GAUGES
............................8J-21
INDICATOR - DESCRIPTION, CRUISE
.....8J-22
INDICATOR - DESCRIPTION, DOOR AJAR
. . 8J-23
INDICATOR - DESCRIPTION, ETC
........8J-25
INDICATOR - DESCRIPTION, GEAR
SELECTOR
..........................8J-27
INDICATOR - DESCRIPTION, HIGH BEAM
. . 8J-28
INDICATOR - DESCRIPTION, LAMP OUT
. . . 8J-29
INDICATOR - DESCRIPTION, LOW FUEL
. . . 8J-30
INDICATOR - DESCRIPTION, SEATBELT
. . . 8J-34
INDICATOR - DESCRIPTION, SECURITY
. . . 8J-35
INDICATOR - DESCRIPTION, SERVICE
4WD
...............................8J-36
INDICATOR - DESCRIPTION, TOW/HAUL
. . . 8J-39INDICATOR - DESCRIPTION, TRANS
TEMP..............................8J-40
INDICATOR - DESCRIPTION, TURN
SIGNAL............................8J-40
INDICATOR - DESCRIPTION, UPSHIFT....8J-41
INDICATOR - DESCRIPTION, WAIT-TO-
START .............................8J-44
INDICATOR - DESCRIPTION, WASHER
FLUID..............................8J-44
INDICATOR - DESCRIPTION, WATER-IN-
FUEL..............................8J-45
INDICATOR - DIAGNOSIS AND TESTING,
BRAKE.............................8J-20
INDICATOR - OPERATION, ABS..........8J-17
INDICATOR - OPERATION, AIRBAG.......8J-18
INDICATOR - OPERATION, BRAKE/PARK
BRAKE.............................8J-19
INDICATOR - OPERATION, CARGO LAMP . . 8J-20
INDICATOR - OPERATION, CHECK
GAUGES............................8J-21
INDICATOR - OPERATION, CRUISE.......8J-22
INDICATOR - OPERATION, DOOR AJAR . . . 8J-23
INDICATOR - OPERATION, ETC..........8J-25
INDICATOR - OPERATION, GEAR
SELECTOR..........................8J-27
INDICATOR - OPERATION, HIGH BEAM....8J-28
INDICATOR - OPERATION, LAMP OUT....8J-29
INDICATOR - OPERATION, LOW FUEL.....8J-30
INDICATOR - OPERATION, SEATBELT.....8J-34
INDICATOR - OPERATION, SECURITY......8J-36
INDICATOR - OPERATION, SERVICE 4WD . . 8J-37
INDICATOR - OPERATION, TOW/HAUL....8J-39
INDICATOR - OPERATION, TRANS TEMP . . 8J-40
INDICATOR - OPERATION, TURN SIGNAL . . 8J-41
INDICATOR - OPERATION, UPSHIFT......8J-42
INDICATOR - OPERATION, WAIT-TO-
START .............................8J-44
INDICATOR - OPERATION, WASHER
FLUID..............................8J-44
INDICATOR - OPERATION, WATER-IN-
FUEL..............................8J-45
INDICATOR LAMP - DESCRIPTION,
SENTRY KEY IMMOBILIZER SYSTEM......8Q-5
INDICATOR LAMP - OPERATION,
SENTRY KEY IMMOBILIZER SYSTEM......8Q-5
INDICATOR LAMP (MIL) - DESCRIPTION,
MALFUNCTION.......................8J-31
INDICATOR LAMP (MIL) - OPERATION,
MALFUNCTION.......................8J-31
INDICATOR TEST - STANDARD
PROCEDURE, BUILT-IN................8F-10
INDICATORS - DIAGNOSIS AND
TESTING, TREAD WEAR................22-8
INERTIA HINGE COVER - INSTALLATION,
CENTER SEAT BACK..................23-77
INERTIA HINGE COVER - REMOVAL,
CENTER SEAT BACK..................23-77
INFLATION PRESSURES - DESCRIPTION,
TIRE................................22-7
INFO CENTER - DESCRIPTION,
ELECTRONIC VEHICLE.................8M-7
INFO CENTER - INSTALLATION,
ELECTRONIC VEHICLE.................8M-9
INFO CENTER - OPERATION,
ELECTRONIC VEHICLE.................8M-7
INFO CENTER - REMOVAL, ELECTRONIC
VEHICLE............................8M-9
INITIAL OPERATION - STANDARD
PROCEDURE, POWER STEERING
PUMP.............................19-40
INITIALIZATION, STANDARD PROCEDURE
- SENTRY KEY IMMOBILIZER SYSTEM....8Q-3
INJECTED RINGS - ASSEMBLY, WITH......3-13
INJECTED RINGS - DISASSEMBLY, WITH . . . 3-11
INJECTION PUMP - DESCRIPTION, FUEL . . 14-53
INJECTION PUMP - INSTALLATION, FUEL . 14-55
INJECTION PUMP - OPERATION, FUEL....14-53
INJECTION PUMP - REMOVAL, FUEL.....14-54
INJECTION PUMP TIMING - DIAGNOSIS
AND TESTING, FUEL..................14-53
INJECTOR - DESCRIPTION, FUEL . . . 14-26,14-74
INJECTOR - INSTALLATION, FUEL........14-77
INJECTOR - OPERATION, FUEL
.....14-26,14-74
INJECTOR - REMOVAL, FUEL
...........14-75
INJECTOR FIRING ORDER, DIESEL -
FUEL
..............................14-48
INJECTOR RAIL - DESCRIPTION, FUEL
....14-78
INJECTOR RAIL - INSTALLATION, FUEL
. . . 14-78INJECTOR RAIL - OPERATION, FUEL.....14-78
INJECTOR RAIL - REMOVAL, FUEL.......14-78
INLET AIR TEMPERATURE SENSOR/
PRESSURE SENSOR - DESCRIPTION.....14-79
INLET AIR TEMPERATURE SENSOR/
PRESSURE SENSOR - INSTALLATION.....14-79
INLET AIR TEMPERATURE SENSOR/
PRESSURE SENSOR - OPERATION.......14-79
INLET AIR TEMPERATURE SENSOR/
PRESSURE SENSOR - REMOVAL........14-79
INLET FILTER - INSTALLATION..........14-20
INLET FILTER - REMOVAL..............14-20
INLET HOSE - INSTALLATION, HEATER....24-64
INLET HOSE - REMOVAL, HEATER.......24-64
INNER BELT MOLDING - INSTALLATION,
FRONT DOOR.......................23-93
INNER BELT MOLDING - INSTALLATION,
REAR DOOR........................23-94
INNER BELT MOLDING - REMOVAL,
FRONT DOOR.......................23-93
INNER BELT MOLDING - REMOVAL,
REAR DOOR........................23-94
INPUT - OPERATION, ASD SENSE - PCM . . . 8I-5
INPUT CLUTCH ASSEMBLY - ASSEMBLY . 21-378
INPUT CLUTCH ASSEMBLY -
DESCRIPTION......................21-373
INPUT CLUTCH ASSEMBLY -
DISASSEMBLY......................21-374
INPUT CLUTCH ASSEMBLY - OPERATION . 21-373
INPUT SHAFT SEAL - INSTALLATION,
STEERING GEAR.......................19-29
INPUT SHAFT SEAL - REMOVAL,
STEERING GEAR.....................19-27
INPUT SPEED SENSOR - DESCRIPTION . . 21-382
INPUT SPEED SENSOR - INSTALLATION . 21-382
INPUT SPEED SENSOR - OPERATION....21-382
INPUT SPEED SENSOR - REMOVAL.....21-382
INSERTS - INSTALLATION, SPRING TIP....2-45
INSERTS - REMOVAL, SPRING TIP........2-44
INSIDE HANDLE ACTUATOR -
INSTALLATION..................23-22,23-32
INSIDE HANDLE ACTUATOR - REMOVAL . . 23-22,
23-31
INSTRUMENT CLUSTER - ASSEMBLY.....8J-15
INSTRUMENT CLUSTER - DESCRIPTION . . . 8J-2
INSTRUMENT CLUSTER - DIAGNOSIS
AND TESTING.......................8J-10
INSTRUMENT CLUSTER - DISASSEMBLY . . 8J-14
INSTRUMENT CLUSTER - INSTALLATION . . 8J-16
INSTRUMENT CLUSTER - OPERATION.....8J-6
INSTRUMENT CLUSTER - REMOVAL.....8J-14
INSTRUMENT PANEL ANTENNA CABLE -
INSTALLATION.......................8A-7
INSTRUMENT PANEL ANTENNA CABLE -
REMOVAL...........................8A-7
INSTRUMENT PANEL ASSEMBLY -
INSTALLATION.......................23-55
INSTRUMENT PANEL ASSEMBLY -
REMOVAL..........................23-52
INSTRUMENT PANEL CENTER BEZEL -
INSTALLATION.......................23-57
INSTRUMENT PANEL CENTER BEZEL -
REMOVAL..........................23-57
INSTRUMENT PANEL DEMISTER DUCTS
- INSTALLATION.....................24-37
INSTRUMENT PANEL DEMISTER DUCTS
- REMOVAL.........................24-36
INSTRUMENT PANEL DRIVER SIDE
BEZEL - INSTALLATION................23-58
INSTRUMENT PANEL DRIVER SIDE
BEZEL - REMOVAL...................23-58
INSTRUMENT PANEL DUCTS -
INSTALLATION.......................24-37
INSTRUMENT PANEL DUCTS - REMOVAL . 24-37
INSTRUMENT PANEL HEADLAMP
SWITCH BEZEL - INSTALLATION.........23-56
INSTRUMENT PANEL HEADLAMP
SWITCH BEZEL - REMOVAL............23-56
INSTRUMENT PANEL LOWER
SURROUND - INSTALLATION...........23-59
INSTRUMENT PANEL LOWER
SURROUND - REMOVAL
...............23-59
INSTRUMENT PANEL TOP COVER -
INSTALLATION
.......................23-59
INSTRUMENT PANEL TOP COVER -
REMOVAL
..........................23-58
INTAKE AIR HEATER - DESCRIPTION
.....14-80
INTAKE AIR HEATER - INSTALLATION
.....14-80
DRINDEX 17
Description Group-Page Description Group-Page Description Group-Page