1998 DODGE RAM 1500 one

[x] Cancel search: one

Page 1478 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (37) Rotate generator into position. Install upper
bolt and torque upper and lower bolts.
(38)
Install wire harness push-on clip below bracket.
(39) Install wire harness P-clip to top of bracket.
(40)

Page 1480 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (5) Rotate the compressor nut counter-clockwise to
relieve tension on the springs. Remove the spring
compressor.
(6) Remove the retainers, springs, valve seals (if
necessary), and valves (Fig. 24). Ar

Page 1482 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
(1) Install new valve seals. The yellow seals are for
the intake valves and the green seals are for the
exhaust valves.
(2) Install the valves in their original postion. The
exhaust valve

Page 1483 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (7) With the engine in this position, valve lash can
be measured at the remaining rocker arms:INTAKE
3±5±6 / EXHAUST 2±4±6. Use the same method as
above for determining whether adjustment is neces

Page 1485 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual NOTE: The #5 cyl. intake and exhaust and #6 cyl.
intake and exhaust push rods must be raised
through the provided cowl panel access holes.
(5) Lift the crosshead(s) off of the valve stems.
Mark them s

Page 1487 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual ENGINE BLOCK
STANDARD PROCEDURE
STANDARD PROCEDURE - CYLINDER BLOCK
REFACING
(1) The combustion deck can be refaced twice. The
first reface should be 0.25 mm (0.0098 inch). If addi-
tional refacing is

Page 1488 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (6) Use a drill, a fine grit Flex-hone and a mixture
of equal parts of mineral spirits and SAE 30W engine
oil to de-glaze the bores.
(7) The crosshatch angle is a function of drill
speed and how fast

Page 1489 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual After finish honing is complete, immediately clean
the cylinder bores with a strong solution of laundry
detergent and hot water.
After rinsing, blow the block dry.
Check the bore cleanliness by wiping