1998 DODGE RAM 1500 service

[x] Cancel search: service

Page 1547 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
(1) Align the holes in the bumpers to the trailer
hitch pins and install the bumper.
(2) Install the support bracket to the hitch bolts,
loosely.
(3) Install the front upper edge to the t

Page 1548 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (7) Remove the front cab mount bolt to the Front
End Sheet Metal (FESM) bracket. (Fig. 5)
(8) Make a vertical mark on the inside and outside
face of the frame rail 112 mm (4.5 in.) from the for-
ward

Page 1549 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (14) Dress the cut edge of the existing frame in
preparation for the new rail tip.
(a) Drill four 13 mm (0.5 in.) diameter holes in
the new tip and four more in the existing frame to
accommodate ring-

Page 1550 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (17) On 4X4 models use the service sleeve as a
template to drill a hole in the frame tip to accommo-
date the sway bar mounting bolt. (Fig. 11)
(18) Slide the service sleeve into the replacement
frame

Page 1551 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (20) Apply ring-fillet welds into the ring-fillet weld
holes on the replacement frame tip (Fig. 13). (Refer
to 13 - FRAME & BUMPERS/FRAME - SPECIFICA-
TIONS - WELDING)
(21) Install the upper FESM insu

Page 1553 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual SERVICE SLEEVE ASSEMBLY
NOTE: Two sleeve halves are included with each
kit. Modifications as follow, are necessary to create
the correct sleeve assembly for each application.
(1) On 4X2 models, the9lo

Page 1554 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual STANDARD PROCEDURE - HYDROFORM
FENDER RAIL REPAIR
CAUTION: This repair procedure assumes damage
to the right or left hydroform fender rail (Fig. 18).
Prior to any repairs, the vehicle must be mounted

Page 1555 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (14) Remove the bolts attaching the lower radiator
crossmember to the hydroform fender rail. (Fig. 18)
CAUTION: Do not use any flame or plasma cutting
equipment to cut the frame in this procedure. The