1998 DODGE RAM 1500 Transfer case

[x] Cancel search: Transfer case

Page 2166 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (12) Install new bearing with Tool Handle C-4171
and Installer 8128 (Fig. 50). The bearing bore is
chamfered at the top. Install the bearing so it is
flush with the lower edge of this chamfer (Fig. 51

Page 2167 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (16) Remove the rear output shaft bearing from
the rear case using Installer 7888 (Fig. 54).
(17) Install the rear output shaft bearing (Fig. 55)
into the rear case using Installer 8152 and Handle
C-4

Page 2168 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (4) Install remaining thrust washer (Fig. 58) in
low range gear and on top of input gear.
(5) Install retainer (Fig. 59) on input gear and
install snap-ring (Fig. 60).
(6) Align and install low range/

Page 2169 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (7) Install snap-ring to hold input/low range gear
into front bearing (Fig. 62).
(8) Install a new input gear seal using Installer
8841 and Handle C-4171.
(9) Install a new input gear oil seal with In

Page 2170 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (5) Install the clutch gear (Fig. 66) onto the output
shaft. Verify that the pointed ends of the clutch gear
teeth are pointing to the front of the mainshaft.
(6) Lubricate sector shaft with transmiss

Page 2171 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (12) Install mainshaft into the transfer case (Fig.
70). Guide mainshaft through the mode and range
sleeves and into the input gear.
(13) Install the transfer case position sensor (Fig.
71). Tighten t

Page 2172 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (17) Install detent plunger, spring, and plug (Fig.
74). Tighten the plug to 16-25 N´m (12-18 ft. lbs.).
FRONT OUTPUT SHAFT AND DRIVE CHAIN
(1) Install the front output shaft (Fig. 75) into the
front

Page 2173 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (8) Install front sprocket retaining ring (Fig. 78).
(9) Install rear sprocket retaining ring (Fig. 79).
(10) Install spring onto shift rail (Fig. 80).
(11) Insert magnet in front case pocket (Fig. 81