Page 1537 of 2062

Downloaded from www.Manualslib.com manuals search engine R11761
FIPG
Seal Width Approx.
1 − 2 mm (0.04 − 0.08 in.)
R11762
FIPG
− SUSPENSION AND AXLEFRONT DIFFERENTIAL CARRIER (4WD)
SA−67
1996 TOYOTA T100 (RM449U)
31. INSTALL DIFFERENTIAL CARRIER COVER
(a) Remove any old FIPG material and be careful not to drop
oil on the contact surfaces of the differential carrier and
carrier cover.
(b) Clean surfaces with FIPG material attached to using gas-
oline or alcohol.
(c) Apply FIPG to the carrier cover, as shown.
FIPG:
Part No. 08826−00090, THREE BOND 1281 or equiva-
lent
HINT:
Install the carrier cover within 10 minutes after applying FIPG.
(d) Install the differential carrier cover with the 8 bolts.
Torque: 47 N·m (475 kgf·cm, 34 ft·lbf)
32. INSTALL A.D.D. ACTUATOR
(a) Remove any old FIPG material and be careful not to drop
oil on the contact surfaces of the actuator and clutch case.
(b) Clean surfaces with FIPG material attached to using gas-
oline or alcohol.
(c) Apply FIPG to the clutch case, as shown.
FIPG:
Part No. 08826−00090, THREE BOND 1281 or equiva-
lent
HINT:
Install the actuator within 10 minutes after applying FIPG.
(d) Torque the 4 bolts.
Torque: 21 N·m (210 kgf·cm, 15 ft·lbf)
Page 1817 of 2062

Downloaded from www.Manualslib.com manuals search engine AB0158
Battery
SST
R05752
SST
H00401Weighty
y
x
RS−16
− SUPPLEMENTAL RESTRAINT SYSTEMSTEERING WHEEL PAD AND SPIRAL CABLE
1996 TOYOTA T100 (RM449U)
(d) Check functioning of SST.
SST 09082−00700
(e) Install the SST
CAUTION:
Place the disc wheel on the level ground.
(1) Connect the SST connector to the steering wheel
pad connector.
SST 09082−00700
NOTICE:
To avoid damaging the SST connector and wire harness,
do not lock the secondary lock of the twin lock. Also, se-
cure some slack for the SST wire harness inside the disc
wheel.
(2) Move the SST to at least 10 m (33 ft) away from
steering wheel pad tied down on the disc wheel.
(f) Cover steering wheel pad with cardboard box or tires.
Covering method using cardboard box:
Cover the steering wheel pad with the cardboard
box and weight the cardboard box down in 4 places
with at least 190 N (20 kg, 44 lb).
Size of cardboard box:
Must exceed the following dimensions:
x=460 mm (18.11 in.)
When dimension of the cardboard box exceeds the di-
ameter of the disc wheel with the tire which the steer-
ing wheel pad is tied to−
x=460 mm (18.11 in.) + width of tire
y= 650 mm (25.59 in.)
NOTICE:
If a cardboard box smaller than the specified size is used,
the cardboard box will be broken by the shock from the air-
bag deployment.
Page 1818 of 2062

Downloaded from www.Manualslib.com manuals search engine R04211
Inner Diam.
Tires
(3 or More)Width
H00400
10 m (33 ft) or more
AB0166
− SUPPLEMENTAL RESTRAINT SYSTEMSTEERING WHEEL PAD AND SPIRAL CABLE
RS−17
1996 TOYOTA T100 (RM449U)
Covering method using tires:
Place at least 3 tires without disc wheel on top of the
disc wheel with the tire to which the steering wheel
pad is tied.
Tire size: Must exceed the following dimensions−
Width: 185 mm (7.87 in.)
Inner diameter: 360 mm (14.17 in.)
CAUTION:
Do not use tires with disc wheels.
NOTICE:
The tires may be marked by the airbag deployment, so use
the redundant tires.
(g) Deploy the airbag.
(1) Connect the SST red clip to the battery positive (+)
terminal and the black clip to the battery negative
(−) terminal.
(2) Check that no one is within 10 m (33 ft) area around
the disc wheel which the steering wheel pad is tied
to.
(3) Press the SST activation switch and deploy the air-
bag.
HINT:
The airbag deploys simultaneously as the LED of the SST ac-
tivation switch lights up.
(h) Dispose of the steering wheel pad (with airbag)
CAUTION:
The steering wheel pad is very hot when the airbag is
deployed, so leave it alone for at least 30 minutes af-
ter deployment.
Use gloves and safety glasses when handling a steer-
ing wheel pad with deployed airbag.
Always wash your hands with water after completing
the operation.
Page:
< prev 1-8 9-16 17-24