JEEP CHEROKEE 1995  Service Repair Manual LEAK-DOWN TEST
After cleaning and inspection, test each tappet for
specified leak-down rate tolerance to ensure zero-lash
operation (Fig. 14).
Swing the weighted arm of the hydraulic valve tap-
pet te

Page 1118 of 2198

JEEP CHEROKEE 1995  Service Repair Manual CAUTION: Engine cylinder head bolts should be re-
used only once. Replace the head bolts if they were
used before or if they have a paint dab on the top
of the bolt.
(6) Coat the threads of bolt No.7,

Page 1121 of 2198

JEEP CHEROKEE 1995  Service Repair Manual at the engine cylinder head. Also tap the top of the
retainer to seat the valve locks.
(8) Install the engine cylinder head.
VALVE TIMING
Disconnect the spark plug wires and remove the
spark plugs.
Re

Page 1122 of 2198

JEEP CHEROKEE 1995  Service Repair Manual oil on the vibration damper hub contact surface of
the seal.
(9) Apply Mopar Silicone Rubber Adhesive Sealant
to the keyway in the crankshaft and insert the key.
With the key inserted in the keyway in

Page 1124 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Drain the cooling system. DO NOT waste reus-
able coolant. If the solution is clean, drain it into a
clean container for reuse.
(3) Remove the radiator or radiator and condenser,
if equipped with

Page 1125 of 2198

JEEP CHEROKEE 1995  Service Repair Manual tor in the Component Removal/Installation section of
Group 8D, Ignition Systems.
(14) Install the distributor and ignition wires. Re-
fer to Distributor in the Component Removal/Instal-
lation section

Page 1126 of 2198

JEEP CHEROKEE 1995  Service Repair Manual bearing (smallest). This permits easier removal and
installation of the camshaft. The camshaft bearings
are pressure lubricated.
It is not advisable to attempt to replace cam-
shaft bearings unless sp

Page 1142 of 2198

JEEP CHEROKEE 1995  Service Repair Manual ASSEMBLY
Refer to the applicable sections for detailed instruc-
tions.
(1) Install the crankshaft.
(2) Install the connecting rods and the pistons
through the top of the cylinder bores.
(3) Install th