Page 45 of 1164
ON-VEHICLE MAINTENANCE Bl
Steps After Installation
1. Connect the negative battery cable.
2. Start the engine and check as follows:
l Ignition timing. (Refer to page 91-8.)
03UOBl-026
. .
81-15
Page 46 of 1164
Bl ON-VEHICLE MAINTENANCE
CYLINDER HEAD GASKET
Replacement
Warning
l Release the fuel pressure. (Refer to Section F.)
l Keep sparks and open flame away from the fuel area.
Caution
l Position the hose clamp in the original location on the hose, and squeeze the clamp lightly
with large pliers to ensure a good fit.
1. Disconnect the negative battery cable.
2. Drain the engine coolant.
3. Remove in the order shown in the figure, referring to Removal Note.
4. Install in the reverse order of removal, referring to Installation Note.
7.8-11 N.m
16-23 (1 4.9-8.8 N.m (50-90 cm-kg, 43-78 in-lb)
(80-l 10 cm-kg, 69-95 in-lb)
L
.8-11 N.m
(80-110 cm-kg,
69-95 in-lb)
-25 (1.9-2.6, 14-19)
BP SOHC: 37-52 (3.8-5.3, 27-38)
37-52 (3.8-5.3, 27-38)
7.8-11 N.m
(80-l 10 cm-kg, 89-95 in-lb)
N-m (m-kg, ft-lb)
23UOBl-01
81-16
Page 47 of 1164

ON-VEHICLE MAINTENANCE Bl
I. Air hose assembly 1 I. Timing belt cover, upper
2. Resonance chamber 12. Timing belt
3. Accelerator cable Removal / Installation.. . . . . . . . . . . . . . . page Bl-12
Installation Note . . . . . . . . . . . . . . . . . . . . . . . . page BI-I9 13. Front exhaust pipe
4. Throttle cable (ATX)
14. Intake manifold bracket
Removal / Installation . . . . . . . . . . . . . . . . . . . . . Section K 15. Cylinder head bolt
5. Hoses Removal Note . . . . . . . . . . . . . . . . . . . . . . . . . . . page BI-18
Removal I Installation Note ..,............... below Installation Note . . . . . . . . . . . . . . . . . . . . . . . . page Bl-I9
6. Harnesses 16. Cylinder head
Removal I Installation Note....... page BI-I8 Disassembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 61-43
7. Water bypass pipe nut
Inspection . . , . . . . . . . . . . . . . . . . . . . . . . . . . ., . . page BI -54
8. Drive belt Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page BI-79
9. Water pump pulley 17. Cylinder head gasket
10. Cylinder head cover
23UOBl-019
Removal / Installation note
Hoses
I. Disconnect the hoses shown in the figure.
\ / DlSCOtjNECT
, w I.,,, -----. WARNING ’ ’ ’ l KEEP SPARKS AND OPEN FLAME AWAY FROM THE FUEL
AREA.
CAUTION
l COVER THE HOSE WITH A RAG BECAUSE FUEL WILL
SPRAY OUT WHEN DISCONNECTING.
. PLUG THE DISCONNECTED HOSES TO AVOID FUEL
LEAKAGE.
I. Brake vacuum hose
2. Fuel hose
3. Vacuum hose (Purge control) 4. Vacuum hose (Cruise control)
5. Heater hose
Page 48 of 1164
Bl ON-VEHICLE MAINTENANCE
Harnesses
1. Disconnect the harness connectors shown in the figure.
DISTRIBUTOR
OXYGEN SENSOR
7.8-l 1 N.m (80-I 10 cm-kg, 69-95 in-lb)
I
INJECTOR
GROUND
/
7.8-11 N-m
(80-110 cm-kg,
HEAT GAijijE
Cylinder head bolt
1, Loosen the cylinder head bolts in two or three steps in the
order shown in the figure.
2. Remove the cylinder head bolts.
Page 49 of 1164
.
ON-VEHICLE MAINTENANCE
Installation note
Cylinder head bolt Bl
1. Apply clean engine oil to the bolt threads and seat faces.
2. Install the cylinder head bolts.
3. Tighten the cylinder head bolts in two or three steps in the
order shown in the figure.
Tightening torque:
76-61 N#m (7.7-6.3 m-kg, 56-60 f&lb)
Accelerator cable
1. Install the accelerator cable.
2. Check the accelerator cable deflection.
If the deflection is not correct, adjust by turning nut A.
Deflection: I-3mm (0.04-0.12 in)
Steps After Installation
1. Fill the radiator with the specified amount and type of engine coolant. (Refer to Section E.)
2. Connect the negative battery cable.
3. Start the engine and check as follows:
(1) Engine oil and engine coolant leakage.
(2) Ignition timing, idle speed. (Refer to page 81-8.)
(3) Operation of emission control system.
4. Recheck the engine coolant levels.
2311081-020
Bl-19
Page 50 of 1164
Bl ON-VEHICLE MAINTENANCE
HLA
Removal / Installation
1. Disconnect the negative battery cable.
2. Remove in the order shown in the figure, referring to
Removal Note.
3. Install in the reverse order of removal, referring to Installation Note.
-
4.9-0.8 N.I
@ BP SOHC
22-28
12.2-2.9. 16-2 m (SO-SO cm-kg, 43-78 in-lb)
N.m (m-kg, ft-lb)
03UOBl-03
1. Cylinder head cover
Installation
Note . . . . . . . . . . . . . . . . . . . . . . . . page 4. Rocker arm spring
81-22
5. Rocker shaft
2. Rocker arm and rocker shaft assembly
6. HLA
Removal Note . . . . . . . . . . . . . . . . . . . . . . . . . . .
page 81-21
Installation Note . . . . . . . . . . . . . . . . . . . . . . . . page Installation Note ,.........,............. page 81-21
---
81-21
3. Rocker arm 7. O-ring
8140
Page 51 of 1164

ON-VEHICLE MAINTENANCE Bl
Removal note
Rocker arm and rocker shaft assembly
1. Loosen the rocker arm bolts in two or three steps in the or-
der shown in the figure.
2. Remove the rocker arms and rocker shaft assembly.
3. Code all rocker arms and springs so that they can be rein-
stalled in the same places from which they were removed.
I
23UOBi-02 1
Installation note
HLA
1. Pour engine oil into the oil reservoir in the rocker arm.
2. Apply engine oil to the new HLA.
3. Install the HLA in the rocker arm.
Caution
l Be careful not to damage the O-ring when installing.
Oli RESERVOIR
o3uoB1-o?
Rocker arm and rocker shaft assembly
B6 SOHC
1. Assemble the rocker arm and rocker shaft assembly as
shown in the figure. No.1 CYLINDER No.4 CYLINDEF
[ ’ ” 0 D 0
0311081-034
Caution
l Be sure both rocker arm shaft oil holes face
downward.
l The installation bolt holes are different for the ex-
haust and intake sides as shown in the figure. No.1 CYLINDER
No.4 CYLINDER
INTAKE
l---A--l
0 = ‘, I I
Y Y
0 \L
.a Y
r Y)
/
6
EXHAUST
A>B
Note
l There are two types of rocker arms with different
offsets. One type for No.1 and No.2 cylinders ex-
haust and intake. And the other for cylinders No.3
and No.4.
No. 1.2 CYLINDERS No.3,4 CYLINDERS
(IN & EX) (IN & EX)
81-21
Page 52 of 1164

Bl ON-VEHICLE MAINTENANCE
8 e
93UOlA.08
EX
03UOBl-035
HEAD COVER
)
23UOBl-023
Steps After Installation
1, Connect the negative battery cable.
2. Start the engine and fully warm up.
3. Verify that there is no tappet noise. 2. Install the rocker arm and rocker shaft assembly.
Caution
l The bolts must be tightened gradually and in the or-
der shown in the figure.
Tightening torque:
22-28 N-m (2.2-2.9 m-kg, 18-21 ft-lb)
BP SOHC
1. Assemble the rocker arm and rocker shaft assembly as
shown in the figure.
Caution
l Face the rocker shaft identification mark upward.
l The installation bolt holes are different for the ex-
haust and intake sides.
Identification mark
IN . . . . . . . . . . White
EX . . . . . . . . . . . Blue
2. Install the rocker arm and rocker shaft assembly.
3. Tighten the rocker arm bolts in two or three steps in the or-
der shown in the figure.
Tightening torque:
22-28 Nsrn (2.2-2.9 m-kg, 16-21 ft-lb)
Cylinder head cover
1. Install the cylinder head cover.
Tightening torque
Bolt @:
4.9-8.8 N-m (50-90 cmikg, 43-78 in-lb)
Bolt @:
7.8-l 1 Nnrn (80-l 10 cm-kg, 69-95 in-lb)
Caution
l If the head cover gasket is reused, apply sealant in
the groove as shown.
03UOBl-038
.-
Bl-22