1967 CHEVROLET CAMARO key

[x] Cancel search: key

Page 462 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
STEERING 9-22

Fig.
 45—Removing Lock Shoe Retaining Pin Using Tool J-22635

with screws, if plate was removed during dis-

assembly.

On automatic columns, press a new shift lever spring

into bow

Page 463 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
STEERING 9-23

Fig.
 47—I retaliating Spherical Joint Spring

upper shaft should be on the same side as the

flat on the lower shaft.

d. Install the upper shaft with spheres into the lower

shaft.

Page 466 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
STEERING
 9-26

Fig.
 54—Corvette Telescoping Column—Exploded View

1.
 Wiring Protector

2.
 Screw

3. Screw

4. Turn Signal Switch

5. Upper Bearing

Housing

6. Signal Switch Cover

7. Escutch

Page 467 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
STEERING 9-27

Fig.
 55— Removing Lower Bearing Retaining Ring

bearing assembly from lower end of shaft.

9. Push upper steering shaft section into lower section

until spring pin is visible at pi

Page 471 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
STEERING 9-31

Fig.
 63—Freeing Ball Stud

rod threads with EP Chassis lube and install ends on

tie rod making sure both ends are threaded ah equal

distance from the tie rod.

2.
 Make sure that

Page 472 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
STEERING
 9-32

arm on frame and install mounting bolts, washers

and nuts. No washer is used on Corvette.

Install relay rod to idler arm, ^making certain seal

is on stud. Install and tighten nut.

Page 555 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
ELECTRICAL-BODY AND CHASSIS 12-43

23.
 Install
 MCtT
 ring over steering shaft using snap ring

installer J-22659 (refer to Section 9).

NOTE: Be sure retaining ring is completely

seated into groov
Page:   < prev 1-8 9-16 17-24