2022 NISSAN PATHFINDER warning

[x] Cancel search: warning

Page 133 of 647

NISSAN PATHFINDER 2022  Owner´s Manual 5. Eco Pedal Guide
When the ECO mode is selected, you can
view ECO Pedal Guide function for improv-
ing fuel economy.
The ECO Pedal Guide mode has three
modes of operation. You can switch be-
tween Ma

Page 135 of 647

NISSAN PATHFINDER 2022  Owner´s Manual SETTINGS
The setting mode allows you to change the
information displayed in the vehicle infor-
mation display:
• VDC Setting• Driver Assistance
• ECO Mode Setting
• TPMS Setting
• Clock
•

Page 136 of 647

NISSAN PATHFINDER 2022  Owner´s Manual Menu itemExplanation
Intervention Allows user to turn the Intelligent Blind Spot Intervention (I-BSI) system on or off. For additional information, see
“Intelligent Blind Spot Intervention (I-BSI)

Page 140 of 647

NISSAN PATHFINDER 2022  Owner´s Manual Maintenance
The maintenance menu allows the user to set reminders for various vehicle maintenance items.
Some menu items shown below may not be equipped on your vehicle.
WARNING
The tire replacement i

Page 144 of 647

NISSAN PATHFINDER 2022  Owner´s Manual VEHICLE INFORMATION DISPLAY
WARNINGS AND INDICATORS
The following messages may appear in
your vehicle information display.
Engine start operation for
Intelligent Key system (if
I-Key battery level is

Page 145 of 647

NISSAN PATHFINDER 2022  Owner´s Manual Check Back Seat For All Articles
When the system is enabled, this message
appears when the vehicle comes to a com-
plete stop, the vehicle is transitioned from
the D (Drive) position to P (Park) posit

Page 146 of 647

NISSAN PATHFINDER 2022  Owner´s Manual Low Fuel
This warning appears when the fuel level in
the fuel tank is getting low. Refuel as soon
as it is convenient, preferably before the
fuel gauge reaches 0 (Empty).There will be
a small reserve

Page 147 of 647

NISSAN PATHFINDER 2022  Owner´s Manual Push brake and start
switch to drive
This indicator appears when the shif t posi-
tion is in the P (Park) position.
This indicator also appears when the ve-
hicle has been started using the Remote
Eng