2019 MERCEDES-BENZ SPRINTER roof rack

[x] Cancel search: roof rack

Page 43 of 422

MERCEDES-BENZ SPRINTER 2019  MY19 with 7” or 10” screen with Nav and SXM Operator’s Manual Environmental pr
otection
+ ENVIRONMENTAL
NOTEEnvironmental
damag eduetooperating conditions and
personal driving style The pollutant emission of
your vehicle is
directl yrelated tothev ehicle's o

Page 97 of 422

MERCEDES-BENZ SPRINTER 2019  MY19 with 7” or 10” screen with Nav and SXM Operator’s Manual #
Movethes teering wheel tothed esired posi‐
tion. #
Pull le ver1up as farasitw illg o.
The steering wheel is loc ked. St
ow agea reas Note
sonl oading guidelines &
DANG ER Risk of poisonin gfrome x

Page 281 of 422

MERCEDES-BENZ SPRINTER 2019  MY19 with 7” or 10” screen with Nav and SXM Operator’s Manual Note
sonl oading guidelines &
DANG ER Risk of poisonin gfrome xhau st
ga ses
Combustion engines emit poisonous exhaust
ga ses, suc hascarbon monoxide. Exhaust
ga ses can enter thev ehicle interior if

Page 284 of 422

MERCEDES-BENZ SPRINTER 2019  MY19 with 7” or 10” screen with Nav and SXM Operator’s Manual light
weight loads. La yanti-slip mats underneath
th el oad tosecur ethe load additionally. Installing and
removing tie-down eyes #
Toinstall: slidethet ie-down eyet hrough a
re cess in thel oading ra

Page 285 of 422

MERCEDES-BENZ SPRINTER 2019  MY19 with 7” or 10” screen with Nav and SXM Operator’s Manual Using the interior
roof car rier sy stem &
WARNING Risk of inju rydue tounse‐
cured loads
When yous ecur eorl oosen aload, thel oad
ma yfall down and injur evehicle occupants. #
When securing or loo

Page 286 of 422

MERCEDES-BENZ SPRINTER 2019  MY19 with 7” or 10” screen with Nav and SXM Operator’s Manual #
Tomo vether ackr ails: unscr ewstar knobs
7 coun ter-clockwise until they ares lightly
loose. #
Sliderackr ail 2 along roof rail1 tothe
desired position. #
Screw star knobs 7tight clo ckwise. #
Chec

Page 362 of 422

MERCEDES-BENZ SPRINTER 2019  MY19 with 7” or 10” screen with Nav and SXM Operator’s Manual Loading
rails
Max. tensile load of cargo tie-down points in
cargo compartment Cargo tie-down
point
Pe
rm issible nomi‐
nal tensile stre ngth
Loading rails on cargo
compartment floor 500 daN
Lo we rl