2018 INFINITI Q50 HYBRID service indicator

[x] Cancel search: service indicator

Page 22 of 44

INFINITI Q50 HYBRID 2018  First responder´s Guide Powering Down the High-voltage System
The
high-voltage system can be shut down with any 1 of the following procedures:• Turn OFF the power switch and disconnect the 12-volt battery. Refer to Primary

Page 28 of 44

INFINITI Q50 HYBRID 2018  First responder´s Guide Alternate Procedure 2 (Remove Service Plug)
DANGER
• Do not remove the service plug without always wearing appropriate Personal
Protective Equipment (PPE) to help protect the responder from serious