3-4.4 Primary Procedure
1. Check the READY indicator status. If it is ON, the high-voltage system is active.
2.
Place the selector lever in the Park (P) position.
3. Press the power switch once to turn OFF the high- voltage system. Then verify whether the READY indicator is OFF and continue to the next steps to
open
the hood for 12-volt battery negative cable access.
If the READY indicator does not turn off,
refer to 3-4.5 Alternate Procedure 1 (Remove Fuses)
(DG–22)
4. If possible, keep the Nissan Intelligent Key® at least 5
meters (16 feet) away from the vehicle.
5. Open the hood.
6. Disconnect the negative (-) 12-volt battery cable (1) . Insulate the negative (-) battery cable terminal with
insulated tape.
NOTE: : Arrow in illustration depicts vehicle front
direction.
7. Wait
at least ten (10) minutes for complete discharge of the high-voltage capacitor after
the power switch has been turned OFF.
8. Perform the dismantling operation. AAYIA0091ZZ
HOLD
AAYIA0144ZZ
AAYIA0145ZZ
1
AAYIA0149ZZ
DG–21