2016 INFINITI Q50 HYBRID service

[x] Cancel search: service

Page 30 of 54

INFINITI Q50 HYBRID 2016  Dismantling Guide 11.
Waitapproximately ten (10) minutes for complete discharge of the high-voltage capacitor
after the service plug has been removed.
12. Perform the dismantling operation. Refer to 6. Dismantling Info

Page 33 of 54

INFINITI Q50 HYBRID 2016  Dismantling Guide 3-4.3 Water Submersion
DANGER
Damage level of submerged vehicle may not be apparent. Handling a submerged
vehicle without appropriate Personal Protective Equipment (PPE) will result in serious
injury

Page 38 of 54

INFINITI Q50 HYBRID 2016  Dismantling Guide 5. Storing the Vehicle
The service plug must be removed to shut down the high-voltage system for storage.
Do
not store a vehicle inside a structure. Keep the vehicle away from other vehicles if the
hi

Page 40 of 54

INFINITI Q50 HYBRID 2016  Dismantling Guide 6. Dismantling Information
Removal
or repair of the high-voltage battery requires special tools and specific training. Infiniti strongly
recommends that only certified INFINITI retailer technicians pe

Page 41 of 54

INFINITI Q50 HYBRID 2016  Dismantling Guide • The colors of the high-voltage harnesses and connectors are all orange. Orange
�high-
voltage� labels
are applied to the high-voltage battery and other high-voltage devices. Do
not touch the high-

Page 45 of 54

INFINITI Q50 HYBRID 2016  Dismantling Guide 6-2.2 Removal Procedure
1. Discharge high-voltage battery. Refer to 3-3 Discharge Procedures (DG–18)
2. Remove the service plug. Refer to Alternate Procedure 2 (Remove Service Plug) (DG–26).
3.

L
Page:   < prev 1-8 9-16