2015 MERCEDES-BENZ SPRINTER ECU

[x] Cancel search: ECU

Page 310 of 334

MERCEDES-BENZ SPRINTER 2015  MY15 Operator’s Manual Hydraulic jack
Preparing the hydraulic jack
X Insert the third rod of jack pump lever 0043
into the lug wrench extension.
Jack pump lever 0043is assembled.
X Close pressure release screw 0044.
X To do

Page 312 of 334

MERCEDES-BENZ SPRINTER 2015  MY15 Operator’s Manual been approved for Sprinter vehicles and the
respective wheel.
! For a steel wheel, only use the short wheel
bolts to mount the steel spare wheel. Using other wheel bolts to mount the steel spare wheel

Page 313 of 334

MERCEDES-BENZ SPRINTER 2015  MY15 Operator’s Manual Tightening torque pattern
0043—0084
Wheel bolts or wheel nuts
X Using the pump lever, slowly turn the low-
ering screw on the jack through approx-
imately one revolution and carefully lower
the vehi

Page 314 of 334

MERCEDES-BENZ SPRINTER 2015  MY15 Operator’s Manual used tires if you have no information about
their previous usage.
The recommended tire pressures can be
found:
R on the Tire and Loading Information plac-
ard 10
on the B-pillar on the driver's si

Page 329 of 334

MERCEDES-BENZ SPRINTER 2015  MY15 Operator’s Manual When handling washer fluid, observe the
important safety notes on service products
(Y page 318).
Mixing ratio Add windshield washer concentrate to the
washer fluid all year round. Adapt the mixing
rat

Page 330 of 334

MERCEDES-BENZ SPRINTER 2015  MY15 Operator’s Manual Load rails
The maximum tensile loads of the cargo tie
down points in the cargo compartment are: Cargo tie down
point Permissible nomi-
nal tensile load Load rails on cargo
compartment floor 1124.0 lbf
Page:   < prev 1-10 ... 33-40 41-48 49-56 57-64 65-72