Page 141 of 3787
AT-124
< SERVICE INFORMATION >
P0740 TORQUE CONVERTER
Wiring Diagram - AT - TCV
INFOID:0000000005928169
TCM TERMINALS AND REFERENCE VALUES
Refer to AT-75, "TCM Terminal and Reference Value".
BCWA0653E
Revision: May 2010 2011 Versa
Page 147 of 3787

AT-130
< SERVICE INFORMATION >
P0744 TORQUE CONVERTER
During AT-58, "Cruise Test - Part 1".
Does A/T shift from D
3 to D4 at the specified speed?
YES >> GO TO 5.
NO >> Check control valve again. Repair or replace control valve assembly.
5.CHECK DTC
Perform AT-128, "
DTC Confirmation Procedure".
OK or NG
OK >> INSPECTION END
NG >> GO TO 11. Check for proper lock-up.
6.CHECK VALVE RESISTANCE
1. Remove control valve assembly. Refer to AT-222, "
Control Valve Assembly and Accumulators".
- Line pressure solenoid valve
2. Check resistance between terminal cord assembly harness con- nector terminal and ground. Refer to AT-134, "
Wiring Diagram -
AT - L P S V".
OK or NG
OK >> GO TO 7.
NG >> Replace solenoid valve assembly.
7.CHECK VALVE OPERATION
1. Remove control valve assembly. Refer to AT-222, "
Control Valve Assembly and Accumulators".
- Line pressure solenoid valve
2. Check solenoid valve by listening for its operating sound while applying battery voltage to the terminal and ground. Refer to AT-
134, "Wiring Diagram - AT - LPSV".
OK or NG
OK >> GO TO 8.
NG >> Replace solenoid valve assembly.
8.CHECK CONTROL VALVE
1. Disassemble control valve assembly. Refer to AT-281, "
Control Valve Assembly".
2. Check line pressure circuit valves for sticking.
- Pressure regulator valve
- Pilot valve
- Pressure modifier valve
OK or NG
OK >> GO TO 9.
NG >> Repair control valve.
9.CHECK SHIFT-UP (D3 TO D4)
SCIA7190E
Solenoid valve Connectror Terminal Resistance (Approx.)
Line pressure solenoid
valve F30 4 - Ground 2.5 - 5
Ω
SCIA3457E
SCIA3275E
Revision: May 2010 2011 Versa
Page 148 of 3787

P0744 TORQUE CONVERTERAT-131
< SERVICE INFORMATION >
DE
F
G H
I
J
K L
M A
B
AT
N
O P
During AT-58, "Cruise Test - Part 1".
Does A/T shift from D
3 to D4 at the specified speed?
YES >> GO TO 10.
NO >> Check control valve again. Repair or replace control valve assembly.
10.CHECK DTC
Perform AT-128, "
DTC Confirmation Procedure".
OK or NG
OK >> INSPECTION END
NG >> GO TO 11. Check for proper lock-up.
11 .CHECK LOCK-UP
During AT-58, "
Cruise Test - Part 1".
A/T perform lock-up at the specified speed?
YES >> Perform “Cruise test — Part 1” again and return to the start point of this test group.
NO >> GO TO 12.
12.CHECK VALVE RESISTANCE
1. Remove control valve assembly. Refer to AT-222, "
Control Valve Assembly and Accumulators".
- Torque converter clutch solenoid valve
2. Check resistance between terminal cord assembly harness con- nector terminal and ground. Refer to AT-124, "
Wiring Diagram -
AT - T C V".
OK or NG
OK >> GO TO 13.
NG >> Replace solenoid valve assembly.
13.CHECK VALVE OPERATION
1. Remove control valve assembly. Refer to AT-222, "
Control Valve Assembly and Accumulators".
- Torque converter clutch solenoid valve
SCIA7190E
SCIA7191E
Solenoid valve Connectror Terminal Resistance (Approx.)
Torque converter clutch
solenoid valve F30 5 - Ground
5 - 20 Ω
SCIA2063E
Revision: May 2010 2011 Versa
Page 149 of 3787
AT-132
< SERVICE INFORMATION >
P0744 TORQUE CONVERTER
2. Check solenoid valve by listening for its operating sound whileapplying battery voltage to the terminal and ground. Refer to AT-
124, "Wiring Diagram - AT - TCV".
OK or NG
OK >> GO TO 14.
NG >> Replace solenoid valve assembly.
14.CHECK CONTROL VALVE
1. Disassemble control valve assembly. Refer to AT-281, "
Control Valve Assembly".
2. Check control valves for sticking.
- Torque converter clutch control valve
- Torque converter clutch relief valve
OK or NG
OK >> GO TO 15.
NG >> Repair control valve.
15.CHECK LOCK-UP
During AT-58, "
Cruise Test - Part 1".
A/T perform lock-up at the specified speed?
YES >> GO TO 16.
NO >> Check control valve again. Repair or replace control valve assembly.
16.CHECK DTC
Perform AT-128, "
DTC Confirmation Procedure".
OK or NG
OK >> INSPECTION END
NG >> Perform “Cruise test — Part 1” again and return to the start point of this test group.
SCIA2066E
SCIA7191E
Revision: May 2010 2011 Versa
Page 151 of 3787
AT-134
< SERVICE INFORMATION >
P0745 PRESSURE CONTROL SOLENOID A
Wiring Diagram - AT - LPSV
INFOID:0000000005928183
TCM TERMINALS AND REFERENCE VALUES
Refer to AT-75, "TCM Terminal and Reference Value".
BCWA0654E
Revision: May 2010 2011 Versa
Page 156 of 3787
P0750 SHIFT SOLENOID AAT-139
< SERVICE INFORMATION >
DE
F
G H
I
J
K L
M A
B
AT
N
O P
Wiring Diagram - AT - SSV/AINFOID:0000000005928191
TCM TERMINALS AND REFERENCE VALUES
Refer to AT-75, "TCM Terminal and Reference Value".
BCWA0655E
Revision: May 2010 2011 Versa
Page 161 of 3787
AT-144
< SERVICE INFORMATION >
P0755 SHIFT SOLENOID B
Wiring Diagram - AT - SSV/B
INFOID:0000000005928199
TCM TERMINALS AND REFERENCE VALUES
Refer to AT-75, "TCM Terminal and Reference Value".
BCWA0656E
Revision: May 2010 2011 Versa
Page 166 of 3787
P1760 OVERRUN CLUTCH SOLENOIDAT-149
< SERVICE INFORMATION >
DE
F
G H
I
J
K L
M A
B
AT
N
O P
Wiring Diagram - AT - OVRCSVINFOID:0000000005928207
TCM TERMINALS AND REFERENCE VALUES
Refer to AT-75, "TCM Terminal and Reference Value".
BCWA0657E
Revision: May 2010 2011 Versa