2010 Mercury Milan service

[x] Cancel search: service

Page 202 of 330

Mercury Milan 2010  Owners Manuals onset of wheel lockup during brake application and compensates for this
tendency. Noise from the ABS pump motor and brake pedal pulsation
may be observed during ABS braking; any pulsation or mechanica

Page 204 of 330

Mercury Milan 2010  Owners Manuals WARNING:Remember that even advanced technology cannot
defy the laws of physics. It’s always possible to lose control of a
vehicle due to inappropriate driver input for the conditions. Aggressive
dri

Page 207 of 330

Mercury Milan 2010  Owners Manuals AdvanceTracFeatures
Control
switch
functions“Sliding
car”
icon
“Sliding car
off”
icon
ESCTraction
control
Default at
start-upIlluminated
during bulb
checkIlluminated
during bulb
checkEnabled

Page 208 of 330

Mercury Milan 2010  Owners Manuals WARNING:The EPS system has diagnostics checks that
continuously monitor the EPS system to ensure proper operation
of the electronic system. When an electronic error is detected, the
message POWER STEE

Page 225 of 330

Mercury Milan 2010  Owners Manuals BLIS-CTA on/off and disable operation
The BLISand/or the CTA can be turned off via the message center.
Turning the BLISoff does not turn off the CTA and vice-versa. If either
the BLISor CTA is tur

Page 227 of 330

Mercury Milan 2010  Owners Manuals ALL WHEEL DRIVE (AWD) SYSTEM (IF EQUIPPED)
Your vehicle may be equipped with a full-time All Wheel Drive (AWD)
system. The AWD system is an active system, meaning it not only
responds to wheel slip be

Page 230 of 330

Mercury Milan 2010  Owners Manuals Mud and water
If you must drive through high water, drive slowly. Traction or brake
capability may be limited.
When driving through water, determine the depth; avoid water higher
than the bottom of th

Page 234 of 330

Mercury Milan 2010  Owners Manuals ROADSIDE ASSISTANCE
Getting roadside assistance
To fully assist you should you have a vehicle concern, Ford Motor
Company offers a complimentary roadside assistance program. This
program is separate f