Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-59
11. Release clip securing pipe to cylinder and disconnect pipe (see Figure 9).
12. Loosen (x6) screws on pump retaining plate (see Figure
10).
13. Slide retaining plate, disco nnect pipe from pump (pipes
and locations are numbered). 14. Remove harness/pipe retaining clips (x3) LH/RH (see
Figure 11).
15. Remove harness/pipe retaining clips (x3) RH/LH (see Figure 12).
16. Remove pipe from vehicle.
Installation
1. Check oil level and top-up if necessary by removing reservoir end plug with pump in upright position, add
Figure 9
Figure 10
Figure 11
Figure 12
Convertible Roof (01.17)
Body System (01.00)1-12-60 Workshop Manual May 2007
small quantity of oil replace plug and re-check level (see
Figure 1).
2. Install pipe to approx imate route on vehicle.
3. Clean pipe and install pipe to pump then slide retaining plate into place and tighten screws (pipes and locations
are numbered).
4. Clean pipe, connect to cylinder and secure clip.
5. Install cable ties securing pipes and wires to cylinder.
6. Install harness/pipe retaining clips.
7. Position tonneau liner to body and install clips.
8. Install pump casing and secure velcro.
9. Install pump and casing under tonneau onto location posts.
10. Install cylinder pivot bracket and connect cylinder to bracket.
11. Move tonneau well liner arou nd lower cylinder fixing
and pump casing and secure velcro.
12. Install trim clip and positi on tonneau lining stiffening
rod.
13. Connect battery.
14. Restore roof and tonneau to original position
LH/RH Front Hydraulic Tonneau Cylinder
Pipe - Renew
Removal
1. Operate roof to halfway position with tonneau open then support roof when hydraulic pressure drops with suitable straps and support
tonneau cover with suitable
prop (see Figure 1).
2. Disconnect battery.
3. Remove trim clip and releas e tonneau lining stiffening
rod (see Figure 2).
4. Release velcro and move to nneau well liner aside to
e x p o s e l o w e r c y l i n d e r f i x i n g a n d m o t o r c a s i n g .
Figure 1
Repair Operation Time (ROT)
WAR NI NG
APPROXIMATELY 20 SECONDS AFTER THE OPEN/
CLOSE OPERATION HAS BEEN INTERRUPTED THE
ROOF MAY SUDDENLY DROP DUE TO LOSS OF
HYDRAULIC PRESSURE. IF THIS HAPPENS ENSURE NO
BODY PARTS ARE CLOSE TO THE ROOF MECHANISM.
IF THE ROOF REQUIRES MAINTENANCE, SUPPORT
PROPERLY USING SUITABLE PROPS AND STRAPS.
Figure 1
Figure 2
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-63
15. Remove harness/pipe retaining clips (x3) RH/LH (see Figure 11).
16. Remove pipe from vehicle.
Installation
1. Check oil level and top-up if necessary by removing
reservoir end plug with pump in upright position, add
small quantity of oil replace plug and re-check level (see
Figure 1).
2. Install pipe to approximate route on vehicle.
3. Clean pipe and install pipe to pump then slide retaining plate into place and tighten screws (pipes and locations
are numbered).
4. Clean pipe, connect to cylinder and secure clip.
5. Install cable ties securing pipes and wires to cylinder.
6. Install harness/pipe retaining clips.
7. Position tonneau liner to body and install clips.
8. Install pump casing and secure velcro. 9. Install pump and casing under tonneau onto location
posts.
10. Install cylinder pivot brack et and connect cylinder to
bracket.
11. Move tonneau well liner arou nd lower cylinder fixing
and pump casing and secure velcro.
12. Install trim clip and positi on tonneau lining stiffening
rod.
13. Connect battery.
14. Restore roof and tonneau to original position
Hydraulic Cylinder Valve to Pump Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open then support roof when hydr aulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Disconnect battery.
Figure 11
Figure 1
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)1-12-66 Workshop Manual May 2007
14. Loosen (x6) screws on pump retaining plate (see Figure
10).
15. Slide retaining plate, discon nect pipe from pump (pipes
and locations are numbered).
16. Remove cable ties and remove pipe from vehicle (see Figure 11).
Installation
1. Check oil level and top-up if necessary by removing reservoir end plug with pump in upright position, add small quantity of oil replace plug and re-check level (see
Figure 1).
2. Install pipe to approximate route on vehicle and install
cable ties.
3. Clean pipe and install pipe to pump then slide retaining plate into place and tighten screws. (pipes and locations
are numbered).
4. Install motor casing and secure velcro.
5. Install motor and casing under tonneau onto location posts.
6. Install cylinder pivot bracket and connect cylinder to bracket.
7. Move tonneau well liner around lower cylinder fixing and motor casing and secure velcro
8. Position tonneau liner to body and install clips.
9. Install trim clip and position tonneau lining stiffening rod.
10. Clean pipe, connect pipe to valve, slide retaining plate
and tighten screw.
11. Install valve to support bracket, reposition bracket.
12. Install cable tie securing valve to bracket. Ensure no
pipes or wiring will foul roof mechanism.
13. Connect battery.
14. Restore roof and tonneau to original positionWind Deflector - Renew
Removal
1. Operate roof to halfway position with tonneau open then support roof when hydraulic pressure drops with
Figure 10
Figure 11
Figure 1
Repair Operation Time (ROT)
ItemCode
Wind Deflector-Renew 01.17.DA
Restraining Devices (01.20)
Body System (01.00)
May 2007 Workshop Manual 1-14-7
Removal
1. Remove door trimboard assembly (see Workshop Manual procedure 01.05.CB Trimboard Assembly -
Door - Remove for Access and Refit).
2. Remove door module securing bolts (x4), swing downwards.
3. Remove door impact sensor plate securing bolts (x3) and disconnect sensor multiplug (x1).
4. Remove sensor securing nuts (x2) from plate.
Installation
1. Install sensor on plate and secure nuts (x2).
2. Connect sensor multiplug (x1) and fit plate securing bolts (x3).
3. Install door module wi th securing bolts (x4).
4. Install door trimboard asse mbly (see Workshop Manual
procedure 01.05.CB Trimboard Assembly - Door -
Remove for Access and Refit).
Front Impact Sensor Assembly - Renew
Removal
1. Remove grille (see Workshop Manual procedure 01.08.AA Grille - Radiator - Renew).
2. Remove slam panel (bolts x12).
3. Remove bolts (x4) securing PAS oil cooler.
4. Remove bolts securing crossmember to inner wing (x4).
5. Remove bolts and spacers securing crossmember to wing (x2).
6. Move crossmember to one side and lift up clear of location (protect paintwork).
7. Disconnect multiplug from front impact assessor (see
Figure 1).
8. Remove screws (x2) securi ng front impact sensor to
cross member, remove sensor.
Installation
1. Install front impact sensor to cross member. install and tighten screws.
2. Connect multiplug to impact sensor.
3. Install crossmember (as removed).
4. Install bolts and spacers securing crossmember to wing (x2).
5. Install bolts securing cros smember to inner wing (x4).
6. Install bolts (x4) securing PAS oil cooler.
7. Install slam panel (bolts x12).
8. Install grille (see Workshop Manual procedure 01.08.AA
Grille - Radiator - Renew).
Occupant Restraint Control Module
Assembly - Renew
Removal
1. Remove rear centre console (see Workshop Manual procedure 01.12.CA Panel Assembly - Console - Rear -
Renew).
2. Release harness clip and disconnect front multiplug (x1) (see Figure 1).
Repair Operation Time (ROT)
A0120181
Repair Operation Time (ROT)
A0120180
Subframes (02.03)
Frame and Mounting (02.00)
May 2007 Workshop Manual 2-1-7
15. Use tool (206-103) and release each handbrake cable from mounting brackets, re lease inner cable eyelets
from calliper levers.
16. Remove bolts (x2) and nuts (x2), handbrake cables to subframe.
17. Use tool (206-103) and release handbrake cables from subframe brackets.
18. Release handbrake cable from clip, tie handbrake cable aside.
19. Loosen and disconnect each brake pipe from body bracket. Plug brake pipes
.
20. Remove bolt, fuel filler pipe to damper mounting.
21. Remove nut securing fuel fi ller pipe to body, tie filler
pipe aside.
22. Remove bolts (x4 each side), securing spring/damper assemblies.
23. Position drain tray to collect oil spillage.
24. Loosen and disconnect unions (x2), transaxle oil cooler.
Plug pipe connections.
25. Remove drain tray.
26. Disconnect multiplug, release harness clips (x2), transaxle harness, RH rear wheel arch.
27. Mark subframe position to body.
28. Position subframe trolley (303-F715), under subframe.
29. Lower vehicle until subfra me rests on support trolley.
30. Remove bolts (x6), securing subframe to body.
31. Raise vehicle to gain access to gear selector cables.
32. Using (308-642), release se lector cables (x2) from ball
joints, release selector cables from bracket.
33. Remove torque tube to transaxle bolts (x8).
34. Move subframe support trolley rearwards to give a clearance between torque tube and transaxle.
35. Carefully raise vehicle from subframe.
Installation
1. Clean transaxle and mating face on torque tube.
2. Position subframe assembly underneath vehicle.
3. Lower vehicle to align transaxle to propshaft splines.
4. Move subframe assembly forward, engage propshaft splines, locating dowels, transaxle to torque tube.
5. Install bolts (x8), torque tube to transaxle, torque tighten bolts.
6. Install gear selector cables on levers and in bracket.
7. Lower vehicle onto subframe mountings, align to marks, install and torque tighten bolts (x6).
8. Position spring/damper assemblies, install bolts (x8).
9. Position fuel filler pipe, install and torque tighten bolt.
10. Position fuel filler pipe to body, install and tighten nut to correct torque.
11. Position handbrake cables to subframe, install bolts (x4), torque bolts. 12. Install handbrake cables to callipers.
13. Remove plugs, install brake pipes.
14. Remove plugs, install transaxle oil cooler pipes, tighten
unions to correct torque.
15. Position earth lead to transaxle, install and torque tighten bolt.
16. Install transaxle harness multiplug, secure harness clips (x2).
17. Install shear plate, install and torque tighten bolts (x8).
18. Install heat shield, install and torque tighten bolts (x4).
19. Clean exhaust pipe connections, apply exhaust sealant to connections.
20. Install centre pipe to mountings and catalysts, torque tighten clamp nuts.
21. Install rear exhaust pipes to centre pipe, torque tighten clamp nuts.
22. Position subframe cross brace, install and torque bolts.
23. Install rear muffler (see Workshop Manual procedure 09.00.KA Silencer and Bypass Valve Assembly - Remove
for Access and Refit).
24. Install LH rear wheel arch liner (see Workshop Manual procedure 01.02.JB Wheel Arch Liner - Rear - LH -
Renew).
25. Install RH rear wheel arch liner (see Workshop Manual procedure 01.02.HB Wheel Arch Liner - Rear - RH -
Renew).
26. Bleed brake system (see Workshop Manual procedure 06.07.DD Brake Hydraulic System - Flush/Refill/Bleed
27. Adjust handbrake (see Wo rkshop Manual procedure
06.05.DC Handbrake Cable Assembly - Adjust).
28. Install road Wheel(s).
29. Lower vehicle on ramp and remove safety equipment.
Rear Subframe-Remove/Refit
Removal
1. Disconnect vehicle battery.
2. Remove rear subframe asse mbly (see Workshop Manual
procedure 02.01.CA Subframe Assembly - Rear -
Remove for Access and Refit).
3. Mark driveshafts to transaxle flanges for assembly purposes.
4. Remove and discard Allen bolts (x12), collect plates (x6), driveshaft flanges to transaxle.
5. Attach slings to transaxle, connect suitable hoist and
take weight of transaxle.
6. Remove nuts (x2). hydramounts to subframe.
7. With assistance, raise and remove transaxle from subframe.
Caution
Always plug pipe connections to prevent ingress of dirt.
Repair Operation Time (ROT)
Issue 5, January 2010 Workshop Manual 3-0-1
Engine System (03.00)
Contents
Engine Assembly (03.00) ....................................... 3-0-3Description ............................................................. 0-3
Maintenance ........................................................... 0-4Engine Assembly-Renew ........................................ 0-4
Engine Assembly-Remove for Access and Refit ....... 0-4
Engine Structure (03.01) ........................................ 3-1-1 Description ............................................................. 1-1Engine Block .......................................................... 1-1
Cylinder Block Drain Plug ...................................... 1-2
Knock Sensors........................................................ 1-3
Bedplate ................................................................ 1-3
Engine Mountings .................................................. 1-3
Cylinder Heads ...................................................... 1-4
Inlet/Exhaust Manifolds .......................................... 1-4
Specifications.......................................................... 1-4
Maintenance ........................................................... 1-5 Upper Intake Manifold Assembly (LHD) - Renew ... 1-5
Upper Intake Manifold Asse mbly (RHD) - Renew ... 1-6
Upper Intake Manifold Assembly Gasket (LHD)
- Renew ................................................................. 1-8
Upper Intake Manifold Assembly Gasket (RHD)
- Renew ................................................................. 1-9
Intake Manifold Assembly - Remove for Access
and Refit (With Engine Removed)......................... 1-11
RH/LH Cylinder Head Gasket - Renew................. 1-12
RH/LH Cylinder Head - Overhaul ........................ 1-13
Cylinder Head (Engine Set) - Overhaul ................. 1-14
Valve Set (Engine Set) - Renew
(including de-coke) .............................................. 1-15
Inlet Valve (Set) - Renew ...................................... 1-16
Exhaust Valve (Set) - Renew ................................. 1-16
Spring (Valve Set) - Renew ................................... 1-17
Spring (Inlet Valve Set) - Renew ........................... 1-18
Inlet and Exhaust Valve Seal (Engine Set) - Renew 1-19
Spring (Valve Exhaust Set) - Renew....................... 1-19
RH/LH Cylinder Head Gasket - Renew (with
Engine Removed) ................................................. 1-20
Cylinder Head Gasket (E ngine Set) - Renew (with
Engine Removed) ................................................. 1-21
Lubrication System (03.02) .. .................................. 3-2-1
Dry Sump System .................................................. 2-1
Specifications.......................................................... 2-2 Engine Oil Specification ......................................... 2-2
Maintenance ........................................................... 2-2 Oil Pressure Pump to Sump Gasket - Renew .......... 2-2
Oil Pump Chain - Renew ....................................... 2-2
Oil Sump Pan - Renew........................................... 2-3
Oil Sump Pan - Remove and Reseal ....................... 2-5
Oil Cooler - Renew ................................................ 2-8
Oil Cooler Tank Assembly - Renew ........................ 2-9
Thermostat - Renew ............................................... 2-9
Oil Cooler Tank Pipe Assembly - Renew .............. 2-10
Oil Thermostat to Tank Tube Assembly - Renew .. 2-10
Oil Pump Inlet Tube Assemb ly - Renew ............... 2-11 Oil Pump Inlet Tube Assembly - Renew ............... 2-12
Oil Pump Outlet Tube Asse
mbly - Renew ............ 2-12
Oil Thermostat Cooler Pipe Assembly - Renew .... 2-13
Oil Temperature Controller - Renew .................... 2-14
Oil Sump Pan - Renew (with Engine Removed) .... 2-14
Oil Sump Pan - Remove and Reseal
(with Engine Removed) ........................................ 2-17
Cooling System (03.03) ......................................... 3-3-1 Description ............................................................. 3-1Water Pump .......................................................... 3-1
Thermostat ............................................................ 3-1
Radiator................................................................. 3-1
Cooling Fans .......................................................... 3-1
Coolant Reservoir .................................................. 3-1
Engine Oil Cooler .................................................. 3-2
Specifications......................................................... 3-2
Torque Figures ....................................................... 3-2
Maintenance ........................................................... 3-2 Coolant-Drain/Fill .................................................. 3-2
Thermostat - Renew............................................... 3-3
Water Pump - Renew ............................................ 3-3
Water Pump Pulley - Renew .................................. 3-3
Oil Temperature Controller - Renew ...................... 3-4
Radiator Fan and Motor Assembly - Remove and
Install ..................................................................... 3-4
Radiator and Condenser Assembly - Renew ........... 3-5
Radiator Assembly - Renew.................................... 3-5
Air Conditioning Condenser - Renew ..................... 3-6
Radiator Fan Modulator - Remove and Install......... 3-6
Expansion Tank Assembly - Renew ........................ 3-6
Coolant Recovery Tank Assembly - Remove and
Install ..................................................................... 3-7
Engine Coolant Reservoir Hose - Renew ................ 3-8
Water Inlet/Outlet Manifold - Renew ..................... 3-8
Engine Electric Coolant Temperature Sensor
- Renew ............................................................... 3-10
Thermostat Cover - Renew .................................. 3-11
Fuel Charging System (03.04)................................ 3-4-1 Safety Precautions .................................................. 4-1
Maintenance ........................................................... 4-2Fuel Rails - Renew ................................................. 4-2
Fuel Injection Pressure Sensor - Renew .................. 4-3
Fuel Temperature Sensor - Renew ......................... 4-3
Fuel Injector Engine Set - Renew............................ 4-4
Fuel Injector - Each - LH Bank - Renew.................. 4-5
Fuel Injector - Each - RH Bank - Renew ................. 4-5
Engine Set - Fuel Injector - LH Bank - Renew ......... 4-6
Engine Set - Fuel Injector - RH Bank - Renew......... 4-6
Accessory Drive System (03.05) ............................ 3-5-1 Description ............................................................. 5-1Auxiliary Drives...................................................... 5-1
Automatic Belt Tensioner ....................................... 5-1
Specifications ......................................................... 5-1
Maintenance ........................................................... 5-1
3-0-2 Workshop Manual Issue 5, January 2010
Drive Belt-Renew ...................................................5-1
Engine Drive Belt and Bracket Assembly Oil Pump
Tensioner-Renew ...................................................5-1
Idler Pulley-Renew .................................................5-2
Engine Drive Belt Idler Assembly-Renew ................5-2
Engine Cranking System (03.06) ........................... 3-6-1 Maintenance ...........................................................6-1 Starter Motor-Renew ..............................................6-1
Ignition System (03.07) ......................................... 3-7-1 Maintenance ...........................................................7-1 Coil Assembly-Engine Set - LH-Renew ....................7-1
Emission Control (03.08) ...................................... 3-8-1 Maintenance ...........................................................8-1 Vacuum Outlet Hose Assemb ly-Renew ..................8-1
Secondary Air Injection Pump Tube-Renew............8-1
Vacuum System Reservoir and Bracket Assembly
- Renew .................................................................8-1
Oil Tank Breather Hose-Renew ..............................8-1
Air Cleaner to Rocker Cover Hose-Renew ..............8-1
Oil Separator Tube Assembly-Renew ......................8-1
Oil Separator Assembly-Renew...............................8-2
Emissions Separator Hose-Renew ...........................8-2
Secondary Air Injection Pump and Bracket
Assembly-Renew ....................................................8-2
PCV Valve Assembly-Renew ...................................8-2
Crank Vent Hose-Renew ........................................8-3
Exhaust Valve to Exhaust Manifold Tube Assembly
- Renew .................................................................8-3
Oil Separator to Inlet Manifold Hose- Renew .........8-3
EGR Module-Renew...............................................8-3
Valve Train (03.09)................................................ 3-9-1 Specifications ..........................................................9-1
Maintenance ...........................................................9-1 Left Side Timing Chain Arm Assembly - Remove
and Install ..............................................................9-1
Right Side Timing Chain Arm Assembly - Remove
and Install ..............................................................9-8
RH/LH Secondary Tensioner Assembly - Remove
and Install ............................................................9-14
Right and Left Intake Camshaft - Remove
and Install ............................................................9-15
Right and Left Exhaust Camshaft - Remove
and Install ............................................................9-17
RH/LH Secondary Timing Chain-Renew ...............9-18
RH/LH Secondary Tensioner Assembly-Renew
(with Engine Removed).........................................9-19
RH/LH Intake Camshaft Renew With Engine
Removed .............................................................9-20
RH/LH Exhaust Camshaft-Renew (with Engine
Removed) ............................................................9-22
RH/LH Secondary Timing Chain-Renew (with
Engine Removed) .................................................9-24
RH/LH Intake Camshaft Sprocket and Housing Assembly-
Renew......................................................................9-25 Left Side Primary Chain - Re move and Install).......9-26
RH/LH Intake Camshaft Sprocket and Housing
Assembly-Renew (with Engine Removed) .............9-29
Engine Sealing (03.10) ........................................ 3-10-1 Specifications ........................................................10-1 Maintenance ......................................................... 10-1
Engine Timing Cover - Renew .............................. 10-1
Left Side Cam Cover - Remove and Install ............ 10-4
Left Side Cam Cover Gasket - Renew ................... 10-5
Right Side Cam Cover Gasket - Renew ................. 10-6
Cylinder Head Gasket - Renew (Engine Set) ......... 10-6
Right Side Cam Cover - Remove and Install .......... 10-9
Cam Cover - Vehicle Set - Remove and Install .... 10-10
Engine Timing Cover- Renew (with Engine
Removed) .......................................................... 10-11
John Guest Cartridge in the Engine Timing Cover
- Repair .............................................................. 10-14
Power Conversion (03.11) ...................................3-11-1 Maintenance ......................................................... 11-1 Connecting Rod Bearing-Renew (Engine Set) ........ 11-1
Crankshaft Main Bearing-Renew (Engine Set)........ 11-1
Crankshaft Assembly-Renew................................. 11-4
Piston-Renew (Engine Set) .................................... 11-7
Piston-Renew ..................................................... 11-12
Additional Piston-Renew (E ach) .......................... 11-17
Piston Ring-Renew (Engine Set) .......................... 11-18
Piston Ring-One Piston Se t-Renew ..................... 11-23
Piston Ring Set-Additional -Renew (Each) ............ 11-28
Connecting Rod-Renew (Engin e Set) .................. 11-29
Crankshaft Damper Pulley Assembly-Renew ....... 11-34
Crankshaft Front Oil Seal-R enew ........................ 11-35
Rear Oil Crankshaft Seal-Renew ......................... 11-36
Cylinder Block-Renew........................................ 11-36
Crankshaft Damper Pulley Assembly-Renew
(with Engine Removed) ...................................... 11-37
Crankshaft Front Oil Seal-Renew (with
Engine Removed) ............................................... 11-37
Crankshaft Rear Oil Seal-Renew (with
Engine Removed) ............................................... 11-38
Air Charging (03.12) .......... ..................................3-12-1
Maintenance ......................................................... 12-1 Clean Air Duct - Remove and Install ..................... 12-1
Engine Air Filter - Remove and Install ................... 12-1
Engine Air Cleaner Assembly - Remove
and Install ............................................................ 12-2
Evaporative Emissions (03.13 ) .............................3-13-1
Description ........................................................... 13-1 System Operation ................................................ 13-1
Engine Management System (03.14) ...................3-14-1 Maintenance ......................................................... 14-1 Right Engine Control Module - Renew.................. 14-1
LH Front Lower Heated Exhaust Gas Oxygen
(HEGO) Sensor - Renew....................................... 14-1
LH Front Upper Heated Exhaust Gas Oxygen
(HEGO) Sensor - Renew....................................... 14-1
RH Front Upper Heated Exhaust Gas Oxygen
(HEGO) Sensor - Renew....................................... 14-2
RH Rear Lower Heated Exhaust Gas Oxygen
(HEGO) Sensor - Renew....................................... 14-2
Left Side Powertrain Control Module (PCM)
(Coupe Only) - Remove and Install....................... 14-3
Left Side Powertrain Control Module (PCM)
(Roadster Only) - Remove and Install.................... 14-4