2009 RENAULT TWINGO RS wiring

[x] Cancel search: wiring

Page 91 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-31
SEQUENTIAL GEARBOX
Gear selection sensor: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aEngage first gear
aRemove:
-the battery (see Battery: Removal - Refitti

Page 93 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-33
SEQUENTIAL GEARBOX
Gear selection sensor: Removal - Refitting
D4F, and JH1
21B
-the engine wiring harness on the petrol injection
computer mounting.
aRefit:
-the petrol injection computer mount

Page 96 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-36
SEQUENTIAL GEARBOX
Solenoid valve assembly pressure sensor: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aRemove:
-the battery (see Battery: Removal - Refittin

Page 97 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-37
SEQUENTIAL GEARBOX
Solenoid valve assembly pressure sensor: Removal - Refitting
D4F, and JH1
21B
II -  OPERATION FOR REMOVAL OF PART 
CONCERNED
aDisconnect the connector (4) from the solenoid
v

Page 103 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-43
SEQUENTIAL GEARBOX
Sequential gearbox: Removal - Refitting
D4F, and JH1
21B
aSeparate the « engine - sequential gearbox » as-
sembly from the front axle sub-frame using a work-
shop hoist and

Page 105 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-45
SEQUENTIAL GEARBOX
Sequential gearbox: Removal - Refitting
D4F, and JH1
21B
If replacing the sequential gearbox
aRefit:
-the sequential gearbox engine speed sensor (see
21B, Sequential gearbox,

Page 106 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-46
SEQUENTIAL GEARBOX
Sequential gearbox: Removal - Refitting
D4F, and JH1
21B
aRefit the « cooling radiator - cooling radiator hose -
air conditioning condenser » assembly to the front
axle sub

Page 108 of 135

RENAULT TWINGO RS 2009 2.G Transmission Workshop Manual 21B-48
SEQUENTIAL GEARBOX
Sequential gearbox gear lever: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aUnclip the sequential gearbox gear lever cover (1) .II -  OPERA
Page:   < prev 1-8 9-16 17-24 25-32 next >