21B-21
SEQUENTIAL GEARBOX
Solenoid valves: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection).
aDetach from the petrol injection computer mounting:
-the cooling hose,
-the sequential gearbox computer wiring harness,
-the petrol injection computer wiring harness,
-the battery wiring harness.
aRemove:
-the petrol injection computer mounting nut (1) , Special tooling required
Mot. 1390Suppor t for removal - refitting
of engine - gearbox assembly
Equipment required
Diagnostic tool
Tightening torquesm
left-hand suspended
engine mounting bolts21 N.m
left-hand suspended
engine mounting rubber
pad bolts62 N.m
left-hand suspended
engine mounting rubber
pad nut105 N.m
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
Note:
To discharge the accumulator and deactivate the
pump assembly pump, (see Fault finding -
Replacement of components) (MR 413, 21B,
Sequential gearbox).
122323
122322
21B-27
SEQUENTIAL GEARBOX
Engagement sensor: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove the front left-hand wheel (see Wheel: Re-
moval - Refitting) (MR 411, 35A, Wheels and ty-
res).II - OPERATION FOR REMOVAL OF PART
CONCERNED
aDisconnect the engagement sensor connector (1) .
aRemove:
-the engagement sensor bolts (2) ,
-the engagement sensor.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
aRefit:
-the engagement sensor,
-the engagement sensor bolts.
aConnect the engagement sensor connector.
II - FINAL OPERATION.
aRefit the front left-hand wheel (see Wheel: Removal
- Refitting) (MR 411, 35A, Wheels and tyres).
aCarry out the necessary operations using the Diag-
nostic tool (see Fault finding - Replacement of
components) (MR 413, 21B, Sequential gearbox). Equipment required
Diagnostic tool
IMPORTANT
Before carrying out any operation on the sequential
system, discharge the accumulator using the diag-
nostic tool.
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
122327
21B-28
SEQUENTIAL GEARBOX
Actuator module: Removal - Refitting
D4F, and JH1
21B
The electro-hydraulic unit comprises the pump assem-
bly and the actuator module.
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (MR 411,
19D, Engine mounting),
-the front wheels (see Wheel: Removal - Refitting)
(MR 411, 35A, Wheels and tyres),
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (MR 412, 55A, Exterior
protection),
-the electro-hydraulic unit (see 21B, Sequential
gearbox, Electro-hydraulic unit: Removal - Re-
fitting, page 21B-11) ,
-the front axle subframe (see Front axle subframe:
Removal - Refitting) (MR 411, 31A, Front axle
components).
II - OPERATION FOR REMOVAL OF PART
CONCERNED
aDisconnect the supply connector from the pump as-
sembly pump.
aDetach the pump assembly pump supply connector
from the electro-hydraulic unit connector mounting. Special tooling required
Ms. 583Pipe clamps .
Equipment required
Diagnostic tool
Tightening torquesm
high pressure pipe
unions14 N.m
IMPORTANT
Before carrying out any operation on the sequential
system, discharge the accumulator using the diag-
nostic tool.
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
Note:
To discharge the accumulator and deactivate the
pump assembly pump, (see Fault finding -
Replacement of components) (MR 413, 21B,
Sequential gearbox).
21B-34
SEQUENTIAL GEARBOX
Clutch position sensor: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
II - OPERATION FOR REMOVAL OF PART
CONCERNED
aDisconnect the clutch position sensor connector (1) .
aRemove:
-the clutch position sensor bolts (2) ,-the clutch position sensor.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
a
aPosition the clutch position sensor on the cylinder
control shaft.
aPivot the clutch position sensor clockwise until the
holes of the sensor are opposite the mounting holes.
aTighten the clutch position sensor bolts.
aConnect the clutch position sensor connector.
II - FINAL OPERATION.
aCarry out the necessary operations using the Diag-
nostic tool (see Fault finding - Replacement of
components) (21B, Sequential gearbox). Equipment required
Diagnostic tool
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
IMPORTANT
Before carrying out any operation on the sequential
system, discharge the accumulator using the diag-
nostic tool.
122326
127569
Note:
The clutch cab le (3) must be in place on the fork,
i.e. out of the cylinder casing.
21B-38
SEQUENTIAL GEARBOX
Sequential gearbox engine speed sensor: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),
-the rear suspended engine mounting (see Lower
engine tie-bar: Removal - Refitting) (MR 411,
19D, Engine mounting),
-the left-hand front wheel (see Wheel: Removal -
Refitting) (MR 411, 35A, Wheels and tyres),
-the front left-hand wheel arch liner (see Front
wheel arch liner: Removal - Refitting) (MR 412,
55A, Exterior protection),
-the electro-hydraulic unit (see 21B, Sequential
gearbox, Electro-hydraulic unit: Removal - Re-
fitting, page 21B-11) .aRemove:
-the left-hand suspended engine mounting shaft
bolts (1) ,
-the left-hand suspended engine mounting shaft.
II - OPERATION FOR REMOVAL OF PART
CONCERNED
aRemove:
-the sequential gearbox engine speed sensor bolt
(2) ,
-the sequential gearbox engine speed sensor. Tightening torquesm
left-hand suspended
engine mounting shaft
bolts62 Nm
122161
122160
21B-40
SEQUENTIAL GEARBOX
Sequential gearbox: Removal - Refitting
D4F, and JH1
21B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR 411, 02A, Lifting equip-
ment).
aRemove:
-the battery (see Battery: Removal - Refitting)
(MR 411, 80A, Battery),
-the sequential gearbox computer (see 21B, Se-
quential gearbox, Sequential gearbox convert-
er: Removal - Refitting, page 21B-47) ,
-the battery tray (see Battery tray: Removal - Re-
fitting) (MR 411, 80A, Battery),
-the petrol injection computer (see Petrol injection
computer: Removal - Refitting) (MR 411, 17B,
Petrol injection),-the air filter unit (see Air filter unit: Removal - Re-
fitting) (MR 411, 12A, Fuel mixture),
-the front wheels (see Wheel: Removal - Refitting)
(MR 411, 35A, Wheels and tyres),
-the catalytic converter (see Catalytic converter:
Removal - Refitting) ,
-the front wheel arch liners (see Front wheel arch
liner: Removal - Refitting) (MR 412, 55A, Exterior
protection),
-the front bumper (see Front bumper: Removal -
Refitting) (MR 412, 55A, Exterior protection).
aDrain:
-the cooling system (see Cooling system: Drain-
ing - Refilling) (MR 411, 19A, Cooling),
-the sequential gearbox (see 21A, Manual gear-
box, Manual gearbox oils: Draining - Filling,
page 21A-2) .
aDrain the refrigerant circuit (see Refrigerant circuit:
Draining - Filling) (MR 411, 62A, Air conditioning).
aRemove:
-the engine - gearbox assembly (see Engine -
gearbox assembly: Removal - Refitting) (MR
411, 10A, Engine and peripherals),
-the hub-carrier - driveshaft assembly (see ) (MR
411, 31A, Front axle components),
-the starter (see Starter: Removal - Refitting) (MR
411, 16A, Starting - Charging),
-the crankshaft position sensor (see Crankshaft
position sensor: Removal - Refitting) (MR 411,
17B, Petrol injection). Special tooling required
Mot. 1448Remote operation pliers for
hose clips .
Equipment required
workshop hoist
load balancer
roller-type stud removal tool
Tightening torquesm
sequential gearbox
studs7 Nm
sequential gearbox bolts44 Nm
sequential gearbox nuts44 Nm
flywheel protection plate
bolts (18)44 Nm
IMPORTANT
Consult the safety and cleanliness advice and oper-
ation recommendations before carrying out any
repair (see 21B, Sequential gearbox, Sequential
gearbox: Precautions for the repair, page 21B-1)
.
AIR CONDITIONING or CLIMATE CONTROL
29A-2
DRIVESHAFTS
Front left-hand driveshaft: Removal - Refitting
JB1 or JH1
29A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
aRemove:
-the engine undertray bolts,
-the engine undertray.
aDrain the manual gearbox (see 21A, Manual gear-
box, Manual gearbox oils: Draining - Filling, page
21A-2) .
aRemove the front left-hand wheel (see Wheel: Re-
moval - Refitting) (35A, Wheels and tyres).II - OPERATION FOR REMOVAL OF PART
CONCERNED
aDetach the wiring from the wheel speed sensor (1) .
aRemove:
-the hub nut (2) by immobilising the hub using the
tool (Rou. 604-01),
-the track rod end nut (3) ,
-the track rod end from the stub axle carrier using
the (Tav. 476),
-the shock absorber base bolts (4) . Special tooling required
Rou. 604-01Hub locking tool.
Tav. 476Ball joint extractor.
Tightening torquesm
the flange mounting
bolts21 Nm
shock absorber base
bolts105 N.m
track rod end nut37 Nm
hub nut280 N.m
WARNING
In order to prevent irreversible damage to the front
hub bear ing:
-Do not loosen or tighten the driveshaft nut when
the wheels are on the ground.
-Do not place the vehicle with its wheels on the
ground when the driveshaft has been loosened or
removed.
130488
29A-5
DRIVESHAFTS
Front left-hand driveshaft: Removal - Refitting
JH3 or JR5
29A
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
aRemove:
-the engine undertray.
-the front left-hand wheel (see Wheel: Removal -
Refitting) (35A, Wheels and tyres).
aDrain the gearbox (see 21A, Manual gearbox,
Manual gearbox oils: Draining - Filling, page
21A-2) .II - OPERATION FOR REMOVAL OF PART
CONCERNED
aUnclip:
-the wheel speed sensor wiring (1) ,
-the brake hose (2) .
aRemove:
-the hub nut (3) by immobilising the hub using the
tool (Rou. 604-01),
-the track rod end nut (4) ,
-the shock absorber base bolts (5) . Special tooling required
Rou. 604-01Hub locking tool.
Emb. 880Pin extractor tool.
Tav. 1813Extraction claw for clip
secured type driveshafts
Tightening torquesm
shock absorber base
bolts105 N.m
track rod end nut37 N.m
hub nut280 N.m
WARNING
In order to prevent irreversible damage to the front
hub bear ing:
-Do not loosen or tighten the driveshaft nut when
the wheels are on the ground.
-Do not place the vehicle with its wheels on the
ground when the driveshaft has been loosened or
removed.
132032