2009 RENAULT TWINGO RS engine

[x] Cancel search: engine

Page 596 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-14
EXHAUST
Catalytic converter: Removal - Refitting
K9K
19B
aIf they are replaced, torque tighten the catalytic
converter studs on the turbocharger (9 Nm ).
II -  REFITTING OPERATION FOR PART 
CON

Page 598 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-16
EXHAUST
Catalytic converter: Removal - Refitting
D4F, and 780 or 782
19B
REMOVAL
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (MR

Page 599 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-17
EXHAUST
Catalytic converter: Removal - Refitting
D4F, and 780 or 782
19B
aRemove the turbocharger air outlet rigid pipe bolt (1)
from the throttle valve.
aDetach the turbocharger air outlet pip

Page 600 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-18
EXHAUST
Catalytic converter: Removal - Refitting
D4F, and 780 or 782
19B
aRemove the exhaust bracket bolts (6) at the catalytic
converter outlet.
aUndo the intermediate pipe clip.
aRemove the i

Page 601 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-19
EXHAUST
Catalytic converter: Removal - Refitting
D4F, and 780 or 782
19B
II -  OPERATION FOR REMOVAL OF PART 
CONCERNED
aDisconnect the catalytic converter downstream oxy-
gen sensor connector

Page 602 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-20
EXHAUST
Catalytic converter: Removal - Refitting
D4F, and 780 or 782
19B
-the new nuts with the catalytic converter spacers
on the turbocharger.
aAttach the downstream oxygen sensor wiring har-

Page 607 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-25
EXHAUST
Expansion chamber: Removal - Refitting
K4M
19B
REMOVING THE EXHAUST PIPE FRONT 
EXPANSION CHAMBER
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle

Page 608 of 652

RENAULT TWINGO RS 2009 2.G Engine And Peripherals Workshop Manual 19B-26
EXHAUST
Expansion chamber: Removal - Refitting
K4M
19B
REMOVING THE EXHAUST PIPE REAR 
EXPANSION CHAMBER
I - REMOVAL PREPARATION OPERATION
aPosition the vehicle on a two-post lift (see Vehicle: