HEADLINING
TSB Revision
INTERIOR52A-15
HEADLINING
REMOVAL AND INSTALLATIONM1521001400973
Pre-removal and Post-installation Operation
•Removal and Installation of Front Pillar Trim, Upper Cen-
ter Pillar Trim, Rear Pillar Trim (Refer to P.52A-10).
•Removal and Installation of Instrument Under Cover
(Refer to
P.52A-6).
AC609656
2
6
1
1
1
1
3 4
45
5
7
7
8
8
9 8
9 10
10
8
AB
A
A
Section A – AClip
Claw
8
3
Note
(1) : Clip positions
(2) : Claw positions