2008 Hyundai Accent check engine

[x] Cancel search: check engine

Page 165 of 273

Hyundai Accent 2008  Owners Manual 2
DRIVING YOUR HYUNDAI
18
C160K01A-AATCarry Emergency EquipmentDepending on the severity of the weather
where you drive your car, you should
carry appropriate emergency equipment.
Some of the items yo

Page 166 of 273

Hyundai Accent 2008  Owners Manual DRIVING YOUR HYUNDAI
192
!
!
USE OF LIGHTSC180A01A-AATCheck your lights regularly for correct
operation and always keep them clean.
When driving during the day in conditions
of poor visibility, it is

Page 174 of 273

Hyundai Accent 2008  Owners Manual 32WHAT TO DO IN AN EMERGENCY
IF THE ENGINE WILL NOT
START!
D010B02A-AATIf Engine Doesnt Turn Over or Turns
Over Slowly
D010A01A-AATD010C01A-AAT
If Engine Turns Over Normally but
Does Not Start1. Chec

Page 176 of 273

Hyundai Accent 2008  Owners Manual 34WHAT TO DO IN AN EMERGENCY
IF THE ENGINE OVERHEATSD030A02A-AATIf your temperature gauge indicates over-
heating, you experience a loss of power,
or hear loud pinging or knocking, the
engine is proba

Page 177 of 273

Hyundai Accent 2008  Owners Manual 3
WHAT TO DO IN AN EMERGENCY
5
!
!
4. Check to see if the water pump drive
belt is missing. If it is not missing,
check to see that it is tight. If the drive
belt seems to be  satisfactory, check for

Page 188 of 273

Hyundai Accent 2008  Owners Manual 316
WHAT TO DO IN AN EMERGENCYD060J01E-AATAfter Changing Wheels
If you have a tire gauge, remove the
valve cap and check the air pressure.
D060J02MC
After changing wheels, have a techni-
cian tighten

Page 190 of 273

Hyundai Accent 2008  Owners Manual 318
WHAT TO DO IN AN EMERGENCY
D080D01MC-AATEMERGENCY TOWING
For emergency towing when no commer-
cial tow vehicle is available, attach a tow
cable, chain or strap to one of the towing
hooks under the

Page 201 of 273

Hyundai Accent 2008  Owners Manual 5
VEHICLE MAINTENANCE REQUIREMENTS2
MAINTENANCE INTERVALSF010B01A-AATMaintenance RequirementsThe maintenance required for your
Hyundai can be divided into three main
areas:
o Specified scheduled proce