6 - 5
–+ELECIGNITION SYSTEM
3. Inspect:
•Secondary coil resistance
Out of specification → Replace.
4. Inspect:
•Sealed portion of ignition coil a
•Spark plug terminal pin b
•Threaded portion of spark plug c
Wear → Replace.
AC MAGNETO INSPECTION
1. Inspect:
•Pick-up coil resistance
Out of specification → Replace.
NEUTRAL SWITCH INSPECTION
1. Inspect:
•Neutral switch conduct
No continuity while in neutral → Replace.
Continuity while in gear → Replace.
EC628000
CDI UNIT INSPECTION
Check all electrical components. If no fault is
found, replace the CDI unit. Then check the
electrical components again.Tester (+) lead
→ Orange lead
1
Tester (–) lead
→ Spark plug terminal
2
Secondary coil
resistanceTester selector
position
4.6 ~ 6.8 k
Ω at
20 °C (68 °F)k
Ω
× 1
Tester (+) lead
→ Red lead
1
Tester (–) lead
→ White lead
2
Pick-up coil
resistanceTester selector
position
248 ~ 372
Ω at
20 °C (68 °F)Ω
× 100
Tester (+) lead
→ Sky blue lead
1
Tester (–) lead
→ Ground
2
Sb
1 Ground 2
Tester selec-
tor position
NEUTRAL
Ω
×
×× × 1
IN GEAR
–+ELEC
6 - 18
TPS (THROTTLE POSITION SENSOR) SYSTEM
EC690000
TPS (THROTTLE POSITION SENSOR) SYSTEM
INSPECTION STEPS
If the TPS will not operate, use the following inspection steps.
NOTE:
Use the following special tools in this inspection.
Pocket tester:
YU-3112-C/90890-03112
Check entire ignition
system for connection.Repair or replace.
Check TPS. TPS coil Replace.
Check CDI unit.TPS input
voltageReplace.
OK
OK
No good
No good
No good