Page 580 of 616
6 - 5
–+ELECIGNITION SYSTEM
ENGINE STOP SWITCH INSPECTION
TT-R125/TT-R125LW
1. Inspect:
Engine stop switch conduct
Not continuous while being pushed →
Replace.
Continuous while being freed → Replace.
TT-R125E/TT-R125LWE
1. Inspect:
Engine stop switch conduct
No continuous while being pushed → Replace.
Continuous while being freed → Replace. Tester (+) lead → Black/White lead 1
Tester (–) lead → Black lead 2
B/W
1B
2Tester selec-
tor position
PUSH IN
Ω × 1
FREE
Tester (+) lead → Black lead 1
Tester (–) lead → Black lead 2
B
1B
2Tester selec-
tor position
PUSH IN
Ω × 1
FREE
BB
1
2
EC626002
IGNITION COIL INSPECTION
1. Inspect:
Primary coil resistance
Out of specification → Replace.
Tester (+) lead → Orange lead 1
Tester (–) lead → Black lead 2
Primary coil
resistanceTester selector
position
0.18 ~ 0.28 Ω at
20 ˚C (68 ˚F)Ω × 1
Page 598 of 616
6 - 13
–+ELEC
STARTER MOTOR
7
4
3
52
1
5 8
0
90
95
6
1
New
New
New
Extent of removal:1 Starter motor disassembly
Extent of removal Order Part name Q’ty Remarks
STARTER MOTOR REMOVAL
Preparation for removal Drain the engine oil. Refer to “ENGINE OIL REPLACEMENT”
section in the CHAPTER 3.
1 Starter motor 1
STARTER MOTOR DISASSEM-
BLY
1Starter motor front cover 1
2Washer (starter motor front
cover)1
3Plain washer 1
4Circlip 1
5O-ring
3
1
ELECTRIC STARTING SYSTEM (TT-R125E/TT-R125LWE)
Page 608 of 616
–+ELEC
6 - 18
CHARGING SYSTEM (TT-R125E/TT-R125LWE)
EC680000
CHARGING SYSTEM (TT-R125E/TT-R125LWE)
EC681001
INSPECTION STEPS
If the battery is not charged, use the following inspection steps.
*1 marked: Refer to “FUSE INSPECTION” section in the CHAPTER 3.
*2 marked: Refer to “BATTERY INSPECTION AND CHARGING” section in the CHAPTER 3.
NOTE:
Remove the following parts before inspection.
1) Seat
2) Rear fender
3) Fuel tank
Use the following special tool in this inspection.
Pocket tester:
YU-3112-C/90890-03112Inductive tachometer:
YU-8036-B
Engine tachometer:
90890-03113
*1 Check fuse.Replace fuse and
check wire harness.
*2 Check battery. Recharge or replace.
Check each coupler and
wire connection.Repair or replace.
Check charging voltage.Charging system is
good.
Check CDI magneto. Charging coil Replace.
Replace rectifier/regulator.
OK
OK
OK
No good
OK
No good
No good
No good
No good
OK
Page 612 of 616
6 - 19
–+ELECCHARGING SYSTEM (TT-R125E/TT-R125LWE)
EC624000
COUPLERS AND LEADS CONNECTION
INSPECTION
1. Check:
Couplers and leads connection
Rust/dust/looseness/short-circuit →
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
Charging voltage
Out of specification → If no failure is
found in checking the source coil resis-
tance, replace the rectifier/regulator.
Tester (+) lead → Red lead 1
Tester (–) lead → Black lead 2
Charging
voltageTester selector
position
14.0 ~ 15.0 V at
5,000 r/minDCV-20
W
B
RY
2
1
3. Inspect:
Charging coil resistance
Out of specification → Replace.
Tester (+) lead → White lead 1
Tester (–) lead → Black lead 2
Charging coil
resistanceTester selector
position
0.64 ~ 0.96 Ω at
20 ˚C (68 ˚F)Ω × 1
WSb
YB
1
2