2007 YAMAHA TTR125 maintenance

[x] Cancel search: maintenance

Page 97 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) SPEC
2 - 24
MAINTENANCE SPECIFICATIONS
TT-R125E/TT-R125LWE
Item Standard Limit
CDI:
Magneto-model/manufacturer 5HP-10/YAMAHA ----
Source coil resistance (color) 688 ~ 1,032 Ω at 20 ˚C (68 ˚F)
(Bro

Page 98 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) SPEC
2 - 25
MAINTENANCE SPECIFICATIONS
Starter relay:
Model/manufacturer MS5F-751/JIDECO ----
Amperage rating 180 A ----
Coil winding resistance 4.2 ~ 4.6 Ω at 20 ˚C (68 ˚F) ----
Starting circuit

Page 170 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) PERIODIC MAINTENANCE CHART FOR THE EMISSION
CONTROL SYSTEM
NOTE:
From 18 months or 7,000 km (4,200 mi) or 210 hours, repeat the maintenance intervals starting from 6 months
or 3,000 km (1,800 mi) or 9

Page 171 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) ONLY FOR CANADA
GENERAL MAINTENANCE AND LUBRICATION CHART
NOTE:
From 18 months or 7,000 km (4,200 mi) or 210 hours, repeat the maintenance intervals starting from 6 months
or 3,000 km (1,800 mi) or 90

Page 172 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) NOTE:
The air filter needs more frequent service if you are riding in unusually wet or dusty areas.
Hydraulic brake service (TT-R125LW / TT-R125LWE)
After disassembling the brake master cylinders and

Page 176 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) 3 - 1
INSP
ADJ
MAINTENANCE INTERVALS
EC300000
REGULAR INSPECTION AND ADJUSTMENTS
MAINTENANCE INTERVALS
The following schedule is intended as a general guide to maintenance and lubrication. Bear in min

Page 177 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) 3 - 2
INSP
ADJ
MAINTENANCE INTERVALS
*: Since these items requires special tools data and technical skills, they should be serviced.*1: For USA
SidestandCheck operation.
Lubricate and repair if necess

Page 182 of 616

YAMAHA TTR125 2007  Betriebsanleitungen (in German) 3 - 3
INSP
ADJ
PRE-OPERATION INSPECTION AND MAINTENANCE
PRE-OPERATION INSPECTION AND MAINTENANCE
Before riding for break-in operation or practice, make sure the machine is in good operating condi-
tio
Page:   < prev 1-10 9-16 17-24 25-32 33-40 next >