2GR-FE IGNITION – IGNITION COIL AND SPARK PLUGIG–11
IG
2. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 6 ignition coils with the 6 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
(b) Connect the 6 ignition coil connectors.
3. INSTALL NO. 1 SURGE TANK STAY
NOTICE:
DO NOT apply oil to the bolt listed below:
(a) Install the No. 1 surge tank stay with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
(b) Install the 2 bolts, 2 clamps, and nut.
Torque: 8.3 N*m (84 kgf*cm, 73 in.*lbf)
4. INSTALL INTAKE AIR SURGE TANK ASSEMBLY (See
page FU-19)
5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See
page FU-20)
6. ADD ENGINE COOLANT (See page CO-7)
7. CONNECT CABLE TO NEGATIVE BATTERY
TERMINAL
8. INSPECT FOR ENGINE COOLANT LEAK (See page
CO-1)
9. INSTALL V-BANK COVER SUB-ASSEMBLY (See
page EM-63)
10. INSTALL COWL TOP PANEL SUB-ASSEMBLY
OUTER FRONT (See page FU-21)
11. INSTALL NO. 1 COWL TOP TO COWL BRACE INNER
(See page FU-21)
A134966E01
Tightening Parts
No. 1 surge tank stay and cylinder head cover
A134967
A161840