SPEC
2 - 16 Part to be tightened Thread size Q’tyTightening torque
Nm m·kg ft·lb
Rear wheel axle and nut M20 × 1.5 1 125 12.5 90
Driven sprocket and wheel hub M8 × 1.25 6 50 5.0 36
Nipple (spoke)—72 3 0.3 2.2
Disc cover and rear brake caliper M6 × 1.0 2 7 0.7 5.1
Protector and rear brake caliper M6 × 1.0 2 7 0.7 5.1
Chain puller adjust bolt and locknut M8 × 1.25 2 16 1.6 11
Engine mounting:
Engine upper bracket and frame M10 × 1.25 2 55 5.5 40
Engine lower bracket and frame M8 × 1.25 4 34 3.4 24
Engine and engine bracket (front) M10 × 1.25 1 69 6.9 50
Engine and engine bracket (upper) M10 × 1.25 1 52 5.2 37
Engine and frame (lower) M10 × 1.25 1 69 6.9 50
Engine guard (left and right) M8 × 1.25 2 23 2.3 17
Engine skid plate mounting (front) M6 × 1.0 3 10 1.0 7.2
Engine skid plate mounting (rear) M6 × 1.0 3 10 1.0 7.2
Regulator mounting M6 × 1.0 2 7 0.7 5.1
Pivot shaft and nut M16 × 1.5 1 80 8.0 58
Relay arm and swingarm M14 × 1.5 1 70 7.0 50
Relay arm and connecting rod M14 × 1.5 1 80 8.0 58
Connecting rod and frame M14 × 1.5 1 80 8.0 58
Rear shock absorber and frame M10 × 1.25 1 56 5.6 40
Rear shock absorber and relay arm M10 × 1.25 1 53 5.3 38
Rear frame and frame (upper) M8 × 1.25 1 32 3.2 23
Rear frame and frame (lower) M8 × 1.25 2 29 2.9 21
Swingarm and brake hose holder M5 × 0.8 4 2 0.2 1.4
Swingarm and patch M4 × 0.7 4 2 0.2 1.4
Drive chain tensioner mounting (upper) M8 × 1.25 1 19 1.9 13
Drive chain tensioner mounting (lower) M8 × 1.25 1 20 2.0 14
Chain support and swingarm M6 × 1.0 3 7 0.7 5.1
Seal guard and swingarm M5 × 0.8 4 6 0.6 4.3
Fuel tank mounting M6 × 1.0 2 10 1.0 7.2
Fuel tank and fuel cock M6 × 1.0 2 6 0.6 4.3
Fuel tank and seat set bracket M6 × 1.0 1 7 0.7 5.1
Fuel tank and hooking screw (fitting band) M6 × 1.0 1 7 0.7 5.1
Fuel tank and fuel tank bracket M6 × 1.0 4 7 0.7 5.1
Seat mounting M8 × 1.25 2 23 2.3 17
Side cover mounting M6 × 1.0 2 7 0.7 5.1
Air scoop and fuel tank M6 × 1.0 6 7 0.7 5.1
Air scoop and radiator panel (lower) M6 × 1.0 2 6 0.6 4.3
Front fender mounting M6 × 1.0 4 7 0.7 5.1
Rear fender mounting (front) M6 × 1.0 2 7 0.7 5.1
Rear fender mounting (rear) M6 × 1.0 2 11 1.1 8.0
Multi-function display bracket mounting M6 × 1.0 2 7 0.7 5.1
MAINTENANCE SPECIFICATIONS
SPEC
2 - 19
HINWEIS:
Die Rotormutter zunächst mit 65 Nm (6,5 m kg, 47 ft lb) festziehen, dann wieder lockern und
anschließend wieder mit 65 Nm (6,5 m kg, 47 ft lb) anziehen. Starter-Relais:
Typ/Hersteller 2768090-A/JIDECO ----
Amperezahl 180 A ----
Wicklungs-Widerstand 4,2–4,6 Ω bei 20 °C (68 °F) ----
Anlasssperrelais:
Typ/Hersteller ACM33221 M06/MATSUSHITA ----
Wicklungs-Widerstand 75,69–92,51 Ω bei 20 °C (68 °F) ----
Sicherungs-Stärke × Anzahl:
Hauptsicherung 10 A × 1 ----
Reservesicherung 10 A × 1 ----
Festzuziehendes TeilGewinde-
größeAnz.Anzugsmoment
Nm m·kg ft·lb
Stator M5 × 0,8 2 7 0,7 5,1
Lichtmaschinen-Kabelhalterung M5 × 0,8 2 7 0,7 5,1
Rotor M12 × 1,25 1 Siehe unter HINWEIS.
Leerlaufschalter M5 × 0,8 2 4 0,4 2,9
Startermotor M6 × 1,0 2 10 1,0 7,2
Starter-Relaisklemme M6 × 1,0 2 4 0,4 2,9
Impulsgeber M6 × 1,0 2 10 1,0 7,2 Bezeichnung Standard Grenzwert
WARTUNGSDATEN
2 - 23
SPECCABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1Fuel tank breather hose
2Clamp
3Diode
4Wire harness
5Hot starter cable
6Negative battery lead
7Starter motor lead
8TPS (throttle position sensor)
lead
9Cylinder head breather hose
0Neutral switch lead
AOil hose
BAC magneto lead
COil tank breather hose
DRectifier/regulator lead
EBrake hose
FHose guideGCarburetor breather hose
HOverflow hose
ICoolant reservoir tank breather
hose
ÈInsert the fuel tank breather
hose into the hole in the steer-
ing shaft cap.
ÉUsing a plastic locking tie and
fasten the diode of the wire har-
ness (at the white tape) to the
frame, and cut off the tie end.ÊFasten the wire harness, cool-
ant reservoir hose and hot
starter cable to the frame with a
plastic locking tie and cut off the
tie end.
ËFasten the wire harness and
coolant reservoir hose to the
frame with a plastic locking tie
and cut off the tie end.
ÌFasten the wire harness to the
frame at its white tape with a
plastic locking tie and cut off the
tie end.
2
Ù
B
BA
B-B
A
A
0Ò2
Ñ2 B ÓC Ô D
EFÕÖ2
×2F
1
È
2
É
3
2
Ê
452
Ë
2
Ì2
Í
6
7
Î
2
Ï
8
9
0
A 2
ÐØ GG
HI
2 - 24
SPECCABLE ROUTING DIAGRAM
ÍFasten the wire harness, starter
motor lead and negative battery
lead to the frame with a plastic
locking tie and cut off the tie
end.
ÎMake sure that the TPS coupler
does not go out the chassis.
ÏFasten the TPS lead to the
frame with a plastic band.
ÐFasten the neutral switch lead
and oil hose together with the
plastic locking ties and cut off
the tie ends.
ÑFasten the neutral switch lead
to the frame with a plastic band
ends outward.ÒFasten the neutral switch lead
and AC magneto lead to the
frame with a plastic band ends
outward.
ÓPass the oil tank breather hose
on the outside of the AC mag-
neto lead, neutral switch lead,
wire harness, rectifier/regulator
lead and cylinder head breather
hose.
ÔPass the wire harness on the
outside of the neutral switch
lead and AC magneto lead.
ÕPass the wire harness through
the cable guide.
ÖFasten the rectifier/regulator
lead to the cable guide with a
plastic locking tie and cut off the
tie end.×Fasten the AC magneto lead
and neutral switch lead to the
cable guide at their protecting
tube with a plastic locking tie.
ØPass the carburetor breather
hoses, overflow hose and cool-
ant reservoir tank breather
hose so that the hoses do not
contact the rear shock
absorber.
ÙUsing a plastic locking tie, fas-
ten the CDI unit lead on the
right of the frame and then cut
off the tie end.
2
Ù
B
BA
B-B
A
A
0Ò2
Ñ2 B ÓC Ô D
EFÕÖ2
×2F
1
È
2
É
3
2
Ê
452
Ë
2
Ì2
Í
6
7
Î
2
Ï
8
9
0
A 2
ÐØ GG
HI
2 - 25
SPECCABLE ROUTING DIAGRAM
1Hot starter cable
2Clutch cable
3Throttle cable (return)
4Throttle cable (pull)
5Ignition coil
6Negative battery lead
7Starter motor lead
8Coolant reservoir tank breather
hose
9Cable holder
0Coolant reservoir hose
AClamp
BCDI unit lead
CCDI unit
DCDI unit band
ECDI unit stay (frame)
FCable bracketÈPass the throttle cables, clutch
cable and hot starter cable
through the cable guides.
ÉPass the throttle cables, clutch
cable and hot starter cable
between the radiator and frame,
then over the middle radiator
mounting boss.
ÊPass the throttle cables and
clutch cable on the outside of
the ignition coil.
ËPass the carburetor breather
hose (throttle cable cover)
through the hose holder.
ÌFasten the coolant reservoir
tank breather hose and carbure-
tor breather hoses together with
a plastic locking tie.ÍFasten the grommet of the clutch
cable with the cable holder.
ÎFasten the CDI unit lead to the
frame with a plastic locking tie
ends at the lower of the frame
and cut off the tie end.
ÏInsert the CDI unit band over the
CDI unit stay (frame) as far as
possible.
ÐFasten the starter motor lead
and negative battery lead to the
cable bracket in its slot with a
plastic locking tie and cut off the
tie end.
A
A
D
ÏE A
Ð
B
B
C
F
Í90
ÎABCD
1
2
43
È
É
Ê
5
6 7 8 Ë Ì
2 - 27
SPECCABLE ROUTING DIAGRAM
1Starter motor lead
2Negative battery lead
3Wire harness
4Clamp
5Taillight lead
6Coolant reservoir tank breather
hose
7Coolant reservoir hose
8Positive battery lead
9Starting circuit cut-off relay
0BatteryÈPosition the starter motor lead,
negative battery lead and wire
harness in the tank damper slit.
ÉFasten the wire harness to the
frame with a plastic locking tie
and cut off the tie end.
ÊFasten the coolant reservoir
tank breather hose and coolant
reservoir hose to the frame with
a plastic locking tie.
ËDo not allow the taillight lead to
slacken.
ÌPass the starter motor lead and
negative battery lead over the
carburetor.
ÍFasten the coolant reservoir
tank breather hose and coolant
reservoir hose to the frame with
a plastic band.ÎPass the coolant reservoir hose
on the outside of the coolant
reservoir tank breather hose.
7Ì4
Í
5
Ë
4
Ê
7
6
È3
2
1
4
É
4
Í4
Í
Î 0
968
213
Zero ~ 10 mm
(Zero ~ 0.39 in)
INSP
ADJ
*: USA
TELESKOPGABEL
Kontrollieren und einstellen
Öl wechseln Gabelöl “S1”
Dichtring erneuern
GABEL-DICHT- UND -STAUB-
SCHUTZRINGE
Reinigen und schmieren Lithiumseifenfett
PROTEKTOR-FÜHRUNG
Erneuern
FEDERBEIN
(nach einer
Fahrt im
Regen)
Kontrollieren und einstellen
Schmieren Molybdändisulfidfett
Spannen
KETTENSCHUTZ UND -ROLLEN
Kontrollieren
ANTRIEBSKETTEN-ANSCHLAG
Kontrollieren
SCHWINGE
Molybdändisulfidfett
Kontrollieren, schmieren und span-
nen
UMLENKHEBEL UND ÜBERTRA-
GUNGSHEBEL
Molybdändisulfidfett
Kontrollieren, schmieren und span-
nen
SEITENSTÄNDER
Schmieren Lithiumseifenfett
LENKKOPF
Spiel kontrollieren und spannen
Reinigen und schmieren Lithiumseifenfett
Lager erneuern
RÄDER UND REIFEN
Luftdruck kontrollieren und auf Ver-
zug, Verschleiß sowie lose Speichen
prüfen
Kettenrad-Schraube spannen
Lager kontrollieren
Lager erneuern
Schmieren Lithiumseifenfett
SEILZÜGE
Yamaha-Seilzugschmier-
mittel oder SAE 10W-30
Motoröl Verlauf und Anschluss kontrollieren
Schmieren
WARMSTART- UND KUPPLUNGSHE-
BEL
Spiel kontrollieren
BATTERIE
Anschlüsse auf Lockerheit und Korro-
sion kontrollierenBezeichnung
Nach
dem Ein-
fahrenNach
jedem
RennenNach
jedem 3.
Rennen
(oder
500 km)Nach
jedem 5.
Rennen
(oder
1.000 km)Nach
BedarfBemerkungen
WARTUNGSINTERVALLE
3 - 3
INSP
ADJ
ROUTINEKONTROLLE VOR FAHRTBEGINN
Ob zum Einfahren, Training oder Rennen, vor dem Starten stets die “Routinekontrolle vor Fahrtbe-
ginn” ausführen.
Vor dem ersten Einsatz folgende Punkte kontrollieren.
ALLGEMEINE KONTROLL- UND WARTUNGSARBEITEN
Bezeichnung Ausführung Seite
KühlflüssigkeitSicherstellen, dass die Kühlflüssigkeit bis zum Kühlerdeckel
reicht.
Das Kühlsystem auf Undichtigkeit prüfen.3-5–9
KraftstoffSicherstellen, dass der Tank mit frischem Kraftstoff befüllt ist Die
Kraftstoffleitung auf Undichtigkeit prüfen.1-21
MotorölDen Ölstand kontrollieren. Kurbelgehäuse und Rahmen auf
Öllecks kontrollieren.3-14–18
Schaltung und KupplungKontrollieren, ob die Gänge sich einwandfrei einlegen lassen und
die Kupplung rucklos funktioniert.3-10
Gasdrehgriff und -gehäuseDie Funktion des Gasdrehgriffs und das Gaszugspiel kontrollie-
ren. Gasdrehgriff und -gehäuse ggf. schmieren.3-10–11
BremsenHandbremshebel-Spiel sowie Funktion der Vorder- und Hinterrad-
Bremsen kontrollieren.3-25–31
AntriebsketteAntriebsketten-Durchhang und -Ausrichtung kontrollieren. Sicher-
stellen, dass die Antriebskette gründlich geschmiert ist.3-32–35
RäderReifenluftdruck und auf starken Verschleiß kontrollieren. Auf lose
Speichen und übermäßiges Spiel kontrollieren.3-43–44
LenkungSicherstellen, dass der Lenker sich stockungsfrei bewegen lässt,
jedoch kein Spiel aufweist.3-44–46
Teleskopgabel und Feder-
beinAuf Funktionsstörungen und Ölaustritt kontrollieren.
3-35–42
SeilzügeSicherstellen, dass die Gas- und Kupplungszüge stockungsfrei
arbeiten. Sicherstellen, dass die Seilzüge durch Schwenken des
Lenkers und Einfedern der Gabel nicht behindert werden.—
SchalldämpferSicherstellen, dass der Schalldämpfer fest montiert ist und keine
Risse aufweist.—
Kettenrad Sicherstellen, dass die Kettenrad-Schraube festgezogen ist. 3-32
Schmierung Einwandfreie Funktion sicherstellen. Gegebenenfalls schmieren. 3-47
SchraubverbindungenFahrgestell und Motor auf lockere Schraubverbindungen kontrol-
lieren.1-26
KabelanschlüsseSicherstellen, dass Lichtmaschine, Zündbox, und Zündspule fest
angeschlossen sind.1-6
EinstellungenEntsprechen die Einstellungen den Fahrbahn- und Wetterbedin-
gungen sowie den Ergebnissen der Testfahrten? Sind sämtliche
Kontroll- und Wartungsarbeiten abgeschlossen?7-1–20
ROUTINEKONTROLLE VOR FAHRTBEGINN
3 - 4