2006 MITSUBISHI LANCER exhaust

[x] Cancel search: exhaust

Page 60 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
EXHAUST PIPE AND MAIN MUFFLER
INTAKE AND EXHAUST15-10
REMOVAL SERVICE POINT
<<A>> ENGINE CONTROL OXYGEN SEN-
SOR (FRONT) REMOVAL
AC212566AC
MD998770
Engine control 
oxygen sensor 
(front)
Use spe c i

Page 61 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
AC303695AC
1
3
50 ± 10 N·m
2
7
N
N
45
8 4
N9
10
59 ± 10 N·m
45 ± 5 N·m
13 ± 2 N·m
45 ± 5 N·m
13 ± 2 N·m
10
<4G6-M/T>
AC504798AB
<4G6-A/T> 1
2
3N
4
7N8
N9
10
13 ± 2 N·m
13 ± 2 N·m
45

Page 62 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
EXHAUST PIPE AND MAIN MUFFLER
INTAKE AND EXHAUST15-12
REMOVAL SERVICE POINT
<<A>> ENGINE CONTROL OXYGEN SEN-
SOR (REAR) REMOVAL
AC212566AD
MD998770
Engine control 
oxygen sensor 
(rear)
Use spe c ia

Page 92 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
IGNITION SYSTEM
ENGINE ELECTRICAL16-30
IGNITION SYSTEM
GENERAL INFORMATIONM1163000100294
This system is equipped with two ignition coils (A and 
B) with built-in power transistors for the No. 1 and

Page 107 of 800

MITSUBISHI LANCER 2006  Workshop Manual 17-1
GROUP 17
ENGINE AND 
EMISSION  
CONTROL
CONTENTS
ENGINE CONTROL . . . . . . . . . .17-2
GENERAL INFORMATION . . . . . .17-2
SERVICE SPECIFICATIONS. . . . .17-2
ON-VEHICLE SERVICE.  . . . . . . .

Page 110 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
EMISSION CONTROL <MPI>
ENGINE AND EMISSION CONTROL17-4
INSTALLATION SERVICE POINT
>>A<< ACCEL PEDAL PAD INSTALLA-
TION
CAUTION
To prevent damages to the accelerator pedal pad, 
warm the thumb area of

Page 118 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
Battery voltageNormal condition
AppliedVacuum leaks
Not appliedVacuum maintained
EMISSION CONTROL <MPI>
ENGINE AND EMISSION CONTROL17-12
5. Measure the resistance between the terminals of the solenoi

Page 124 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
EMISSION CONTROL <MPI>
ENGINE AND EMISSION CONTROL17-18
EXHAUST GAS RECIRCULATION (EGR) 
VALVE REMOVAL AND INSTALLATION
M1173010500175
Pre-removal and Post-installation Operation
Air Cleaner Assembly
Page:   < prev 1-8 9-16 17-24 next >