Preface
With the increase of automobile demand in China, our automobile industry also experiences a rapid
development. The trucks including SUV, manufactured by Great Wall Motor Co., Ltd, which are sold all over
China, are in the leading place in terms of their sales volume, in order to satisfy the demands of various maintain-
ing staff, technicians and managing staff of Changcheng Co., Ltd, we compile this maintenance manual accord-
ing to the latest technological data. This manual covers six vehicle models including Deer, Safe, Sailor, Sing, So
Cool and Pegasus, its main content includes:
Part I is general introduction, which introduces the application index of this manual.
Part II introduces the chassis system, which mainly includes the technologies of dismantle, inspection,
adjustment, repairing, assembly and mount of the clutch, gear box, transfer box, drive shaft, suspension system
and automobile axle, braking system and steering system, etc. each operation approach is illustrated with figure,
which not only presents the maintenance procedure, but also clearly describes the technical requirements and
application limit.
Part III introduces the electric system and air-conditioning system of the automobile body, which mainly
covers such items as the location and content of protective box, power supply system, starting system, lighting
system, combination instrument, backup radar system, wiping and washing system, center control locking and
power window system, acoustical equipment system, full wire harness and air-conditioning system, etc. Electric-
ity diagrams for those electric systems are given in this manual so as to facilitate the maintaining technicians to
find out the problem easily and quickly.
Part IV introduces the external and internal body decoration, which mainly covers the dismantling, inspect-
ing and assembling requirements of the engine cover, front and rear doors, adhesive strip of body collision
avoidance, wheel shield, wrapping angle of wheel-shield and exterior trim panel, front and rear windshields,
side-window glass, rear-door glass, rear platform of cargo compartment, rear door, instrument panel, safety belt,
seat, tail-fin, luggage rack, and reserve tire bracket etc. The dimensions of vehicle body and frame are also given
to maintaining staff for reference during their repairing.
During the narrations of each part, items such as troubleshooting, maintenance notice, maintenance data
and application limit, fastening torques of bolts and nuts for special purpose, SST, SSM and lubricant materials
and so on are also introduced. Various maintenance data are briefed in attachment for reference.
Altogether, this manual is comprehensive in content, visual in illustration, clarifying in requirement and
plain in language. It can be referred by the maintaining staff, technicians and professional managing staff.
Even though we try our best to compile this manual in a strict earnest manner, we cannot guarantee that all
contents in this manual are correct. Therefore, users shall not put forward any claim with Great Wall Company
according to this manual; we are not in the position to hold the responsibility for the loss caused by usage of this
manual. Due to our limited knowledge, it is unavoidable to find error in this manual, any criticism and correction
from you is welcomed.
The final explanation power for this manual is subject to Great Wall Motor Co., Ltd
Compiler
May 2006
AC-3Air Conditioning SystemIntroduction
(c) Tighten the O-ring matching position or the threaded position
to the specified moment.
4. Take notice when connecting measuring meter at branch pipes:
(a) Connect the end of filling hose with high speed joint to the
filling valve of compressor.
(b) Letter D marked on the compressor near the auxiliary valve
represents the side of high voltage while S means the side of
low voltage, which shall be looked out when connecting the hose.
(c) Fasten the bolts by hand, and
(d) In order to prevent the hose from loosing, lubricant oil shall not
be spread at the connection position.
Remarks: after connecting the measuring meter on branch pipes to
the refrigerant container (repairing tank), the air in the hose shall be
exhausted up.
5. Take notice when vacuumizing:
After vacuumizing for 20 min, maintain the container at certain
pressure to ensure that all air in it is exhausted up, and another
inspection shall be made to see whether there is leakage.
6. Take notice when handling with the refrigerant container
(repairing tank):
(a) Do not heat it.
(b) Store the container at the place where temperature is under 40
(c) In case of heating the repairing tank with hot water, care shall
be paid to the valves at the top of tank, do not dip them into the
water, or the water will penetrate into the cooling system.
(d) The empty repairing tank is forbidden to reuse.
8. Take notice when using the high-pressure air cylinder type
inspecting device:
(a) In case the open fire is used, it is the first to ensure before using
there is no flammable material around.
(b) Be careful because toxic gas will be produced when the
gaseous refrigerant meets with the open fire. 7. Take notice in the A/C operation or when adding the liquid
refrigerant:
(a) In case the gaseous refrigerant in the cooling system is
insufficient, which can lead to the compressor burns out, and
such accidents shall be avoided.
(b) If the valve on the side of high pressure is uncovered, the
refrigerant will flow in the reverse direction, which may lead
to the break of the repairing tank, therefore, only valves on the
side of low pressure are allowed to open or closed.
(c) If the repair tank is laid in reverse direction, and the refrigerant
is added in liquid status, the liquid refrigerant will be
compressed, which may lead to failure of the compressor,
therefore, refrigerant shall be inflated in the gaseous status.
(d) Be careful not over-inflate the gaseous refrigerant, otherwise,
such failures as insufficient cooling, increase of oil consuming
or over heat of engine will be followed.
under 40
incorrect
correct
measuring meter of branch pipe
loose over-fastened
A/C operation