Page 418 of 484

B0-35Vehicle BodyFront Windshield
4. Mount of front windshield.
Dr
(a) Lay the ready glass against the corresponding position of front
windshield opens.
(b) Pull the rope from the inside of body to encase the roof, the front
column and the door frame within the adhesive strip, meanwhile
push the outside of the glass by hand.
(c) Tap the four edges of the adhesive strip to ensure that the
adhesive strip contact closely with the body windshield opened.
(d) Coat the glue from left to right at the upper part of windshield
(location between the adhesive strip and the body windshield open)
and the lower part of windshield (location between the adhesive
strip and glass), and the remaining glue should be cleared away with
abrasive paper, and the location should be cleaned with cloth.
Notice: there should no breakage at the sealing glue seam
when coating the glue.
SL SK SF SY SJ
(a) Suck the front windshield with two sucking discs and put the
glass on the worktable in reverse dirdction.
(b) Seize the upper trim strip of front windshield at the position of
upper glass edge.
(c) Coat the cleaning active agent on the inside edges around the
front windshield (the black glass edges), airing for 3~5 min, then
coat the priming paint on the layer of cleaning active agent, and
airing for 5 to 30 min, finally coat the sealing agent.
Notice: no breakage should be allowable at the sealing glue
seam when coating.
Recommended sealing agent for use:
(SF)
Glass glue TS-100 PVC windshield glue
Priming paint TS-5028
Cleaning active agent TS-7016
(SL SK SY SJ)
Glass glue TEROSTAT-8590 windshield glue
Priming paint TEROSTAT-8511
(d) Clean the body windshield open completely with cotton cloth to
coat the priming glue, airing for 5 min or so, and then stick the
front windshield to the windshield open.
(e) Fix the left/right trim strip of front windshield at the edges of
windshield open.
(f) Fix the lower trip strip of front windshield with screw at the
clipes of lower glass edge. (SF)
(g) Stick the upper edge of front windshield to the body with
transparent adhesive strip so as to prevent the glass from lowering.
Page 422 of 484

B0-39Vehicle BodySide Window Glass
3. Mount the trim strip and spilling strip of side window (SY SJ)
(a) Assemble the trip strip of side window on the left upper
conner of inner edge of the left side window at 60 mm under
the conner, and encase the roof in the trim strip.
(b) Stick the spilling strip (46) to the center of lower edge of
side window and to the circumference of the glass frame.
4. Mounting of side glass
Coat the cleaning active agent around the inner edge along the
circumference of side window glass (the black glass edge).
Airing for 3 to 5 min, coat the priming agent on the layer of cleaning
active agent and airing for 5 to 30 min.
(SYSJ)
(a) Plaster the glass glue with the glue container on the layer of
priming paint of window frame with the initiative location
200 mm under the left upper conner of left side window.
(b) Stick the glass quickly to the window frame and adjust the
upper, lower, left and right clearance, and fill them with
gasket.
(c) Exert the pressure of certain degree on the glass circumfer-
ence after adjusting so that the glass contact
Recommended sealing glue for use
Glass glue U-201 windshield glue
Priming paint 130
Cleaning active agent C020
(SF)
(a) Plaster the glass glue alongside the complete circumference
of adhesive strip of side window glass, and the glue section
should be similar to tri-angle after coating.
(b) Put the side window glass assembly at the corresponding
location on body, fix the upper edge of side window glass with
three hex nuts and others should be fixed with flange nuts.
Recommended sealing glue for use
Glass glue TS-100 PVC windshield glue
Priming paint TS-5028
Cleaning active agent TS-7016
Notice:
(a) When plastering glue, the glue should be plastered continu-
ously and no breakage is allowable at the sealing glue seam.
(b) Clean the redundant glue on the body;
(c) The vehicle is not allowed to drive within 4 hours in summer
and 8 hours in winder under common circumstances.
5. Check whether there is leakage and the leakage reparation;
(a) Conduct the leakage test;
(b) Seal the leaking parts with glass glue. SJ
SY
SF
Page 433 of 484
B0-50Vehicle BodyInstrument Panel
Instrument panel ()
Element figure
Dr
instrument
panel body
glove box
cover
glove box
lower instrument cover
left air tunnel
combination
instrument
ignition
switch cap
central cover
decorative cover of
instrument upper instrument
cover
air passage
CD deviceair-conditioning
controlling
mechanism
assembly
central lower wall
ashtray
Page 434 of 484
B0-51Vehicle BodyInstrument Panel
Instrument Panel ()
Element figure
SF
instrument panel body
lower instrument coverglove box
central panelcentral switchcentral air tunnel
combination instrument
instrument cover
cigarette lighter seat
ashtraycombined acoustic
deviceir-conditioner panel
fixed bracket
Page 435 of 484
B0-52Vehicle BodyInstrument Panel
Instrument panel ()
Element figure
SL SK SY SJ
instrument
panel body
right upper air tunnel
central air tunnel
left upper
air tunnel
combination
instrument
decorative cover
of instrument
lower covering board
at right end
glove box
lower instrument
cover(SY)
air-conditioning
controlling mechanism
assemblylower instrument cover
central cover
CD device
cigarette
lighter seat
lower decorative
frame of
instrument panel
ashtray cluster
glove box lock
Page 436 of 484

B0-53Vehicle BodyInstrument Panel
Dismantle of instrument panel
(Dr SF)
1. Disconnect the cable of accumulator from the negative
polar;
2. Tear down the steering wheel;
3. Tear down the combined switch shell cluster;
4. Tear down the bonnet lock switch;
Tear down the two screws and the sliding fastener of bonnet
lock.
5. Tear down the central bottom-wall (Dr)
Tear down the decorative cover of gearbox (SF)
6. Tear down the instrument cover (SF).
Tear down the two screws and the cover.
7. Tear down the lower instrument cover;
(a) Tear down the ignition lock;
(b) Tear down the five screws and the cover;
Tear down the four screws and the cover;
(c) Disconnect the plugging elements.
8. Tear down the air-conditioner controlling panel;
(a) Pull out the air-conditioner controlling button;
(b) Prize out the A/C switch;
(c) Prize out the air-conditioner panel as shown in the
drawing with screwdriver and take it down.
Notice: the screwdriver should be wrapped with adhesive
strap at its head before using.
(d) Disconnect the plugging elements.
9. Tear down the decorative cover of instrument (Dr)
(a) Tear down the two screws to pull out the decorative cover
of instrument;
(b) Disconnect the plugging elements.EF
Page 437 of 484

B0-54Vehicle BodyInstrument Panel
10. Tear down the combination instrument;
(a) Tear down the four screws;
Tear down the two screws;
(b) Disconnect the plugging elements;
(c) Tear down the combination instrument.
11. Tear down the ashtray cluster;
12. Tear down the central cover;
(a) Tear down the decorative frame;
(b) Tear down the three screws to pull out the central cover;
(c) Disconnect the plugging elements.
13. Tear down the central panel;
(a) Prize out the central panel as shown in the drawing with
screwdriver to take it down.
Notice: the screwdriver must be wrapped with adhesive strap
at its head before using.
(b) Disconnect the plugging elements.
14. Tear down the air-conditioning controlling mechanism
assembly;
Tear down the two screws, which will let the air-conditioning
controlling mechanism in suspension.
15. Tear down the air-controlling panel;
(a) Tear down the four screws to pull out the air-condition-
ing panel;
(b) Disconnect the plugging element;
16. Tear down the CD device or the combined acoustic
device;
(a) Tear down the four screws.
(b) Disconnect the aerial cable and the plugging elements.
(c) Tear down the CD device or the combined acoustic device.
17. Tear down the glove box;
Tear down the two screws and the glove box.
SF
Seize the flanges at two ends of glove box into the sliding
channel of the glove box.
18. Tear down the central air tunnel;
Tear down the four screws and the central air tunnel.
Page 439 of 484

B0-56Vehicle BodyInstrument Panel
10. Tear down the combination instrument;
(a) Tear down the four screws;
(b) Disconnect the plugging elements.
(c) Tear down the combination instrument.
11. Tear down the CD or combined acoustic device;
(a) Tear down the four screws;
(b) Disconnect the aerial cable and the plugging elements;
(c) Tear down the CD or the combined acoustic device.
12. Tear down the central air tunnel;
Tear down the four screws to take out the central air tunnel.
13. Tear down the air-conditioner controlling panel;
(a) Pull out the air-conditioner controlling button;
(b) Prize out the A/C switch;
(c) Prize out the air-conditioner controlling panel as shown
in the drawing with screwdriver and take it down.
Notice: the screwdriver should be wrapped with adhesive
strap at its head before using.
(d) Disconnect the plugging elements.
14. Tear down the air-conditioning controlling mechanism
assembly;
Tear down the two screws and let the air-conditioner control-
ling mechanism in suspension.
15. Tear down the lower covering board at right end;
Tear down the four screws and take out the lower covering
board at right end.
16. Tear down the glove box;
Tear down the two screws and the glove box
17. Tear down the instrument body;
(a) Tear down the three bolts and the instrument panel;
(b) Disconnect the plugging elements.
Mount of instrument panel
Mount the parts of instrument panel in the reverse
approach.