2 - 21
SPECCABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1Fuel tank breather hose
2Oil tank breather hose
3Hot starter cable
4Radiator hose 4
5Clutch cable
6Cylinder head breather hose
7Radiator hose 1
8Hose guide
9Brake hose
0“ENGINE STOP” button lead
AClamp
BSub wire harness
CTPS (throttle position sensor)
lead
DNeutral switch lead
EOil hoseFRadiator breather hose
GCDI magneto lead
HCarburetor breather hose
IOverflow hose
ÈInsert the end of the fuel tank
breather hose into the hole in
the steering shaft cap.
ÉPass the hot starter cable
between the cylinder head
breather hose, oil tank breather
hose and ignition coil, then on
the outside of the left engine
bracket.
ÊPass the clutch cable through
the cable guides.ËPass the cylinder head breather
hose on the outside of the radia-
tor hose 1 and on the inside of
the radiator pipe (radiator hose
4).
ÌPass the clutch cable in front of
the lower radiator mounting boss.
ÍFasten the “ENGINE STOP” but-
ton lead and sub wire harness to
the frame at the protecting tube
of the sub wire harness with a
plastic locking tie and cut off the
tie end.
B
0
C-C
D-D
B
A
AB
DD
CC
F
D G
F
D
A
G
A
A
F
AE
A
DC A A A A B A 0
1
2
3
4 5 6 7 89
Ì
Ë
ÊÉ ÈÙÍ
Î
Ï
Ð
Ð Ñ
A
Ô Õ Ø
Ú HIH
E Û
Ò
Ö ×
Ê Ê Ê
Ó