Page 26 of 646
GEN
INFO
1 - 1
DESCRIPTION
EC100000
GENERAL INFORMATION
EC110000
DESCRIPTION
1Clutch lever
2Hot starter lever
3Front brake lever
4Throttle grip
5Radiator cap
6Fuel tank cap
7“ENGINE STOP” button
8Kick starter
9Fuel tank
0Radiator
ACoolant drain bolt
BRear brake pedal
CValve joint
DFuel cock
ECold starter knob
FDrive chain
GAir cleaner
HShift pedal
IOil dipstick
JFront forkNOTE:
The machine you have purchased may differ
slightly from those shown in the following.
Designs and specifications are subject to
change without notice.
Page 48 of 646

1 - 10
GEN
INFO
CONTROL FUNCTIONS
EC150000
CONTROL FUNCTIONS
EC151000
“ENGINE STOP” BUTTON
The “ENGINE STOP” button 1 is located on
the left handlebar. Continue pushing the
“ENGINE STOP” button till the engine comes
to a stop.
EC152000
CLUTCH LEVER
The clutch lever 1 is located on the left han-
dlebar; it disengages or engages the clutch.
Pull the clutch lever to the handlebar to disen-
gage the clutch, and release the lever to
engage the clutch. The lever should be pulled
rapidly and released slowly for smooth starts.
EC153000
SHIFT PEDAL
The gear ratios of the constant-mesh 4 speed
transmission are ideally spaced. The gears
can be shifted by using the shift pedal 1 on
the left side of the engine.
EC154000
KICK STARTER
Rotate the kick starter 1 away from the
engine. Push the starter down lightly with your
foot until the gears engage, then kick smoothly
and forcefully to start the engine. This model
has a primary kick starter so the engine can be
started in any gear if the clutch is disengaged.
In normal practices, however, shift to neutral
before starting.
1
EC155001
THROTTLE GRIP
The throttle grip 1 is located on the right han-
dlebar; it accelerates or decelerates the
engine. For acceleration, turn the grip toward
you; for deceleration, turn it away from you.
Page 62 of 646

1 - 17
GEN
INFO
BREAK-IN PROCEDURES
1. Before starting the engine, fill the fuel tank
with the fuel.
2. Perform the pre-operation checks on the
machine.
3. Start and warm up the engine. Check the
idle speed, and check the operation of the
controls and the “ENGINE STOP” button.
Then, restart the engine and check its
operation within no more than 5 minutes
after it is restarted.
4. Operate the machine in the lower gears at
moderate throttle openings for five to eight
minutes.
5. Check how the engine runs when the
machine is ridden with the throttle 1/4 to 1/
2 open (low to medium speed) for about
one hour.
6. Restart the engine and check the operation
of the machine throughout its entire operat-
ing range. Restart the machine and oper-
ate it for about 10 to 15 more minutes. The
machine will now be ready to race.
CAUTION:
After the break-in or before each race,
you must check the entire machine for
loose fittings and fasteners as per
“TORQUE-CHECK POINTS”.
Tighten all such fasteners as required.
When any of the following parts have
been replaced, they must be broken in.
CYLINDER AND CRANKSHAFT:
About one hour of break-in operation is
necessary.
PISTON, RING, VALVES, CAMSHAFTS
AND GEARS:
These parts require about 30 minutes of
break-in operation at half-throttle or less.
Observe the condition of the engine care-
fully during operation.
STARTING AND BREAK-IN
Page 130 of 646

2 - 21
SPECCABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1Fuel tank breather hose
2Oil tank breather hose
3Hot starter cable
4Radiator hose 4
5Clutch cable
6Cylinder head breather hose
7Radiator hose 1
8Hose guide
9Brake hose
0“ENGINE STOP” button lead
AClamp
BSub wire harness
CTPS (throttle position sensor)
lead
DNeutral switch lead
EOil hoseFRadiator breather hose
GCDI magneto lead
HCarburetor breather hose
IOverflow hose
ÈInsert the end of the fuel tank
breather hose into the hole in
the steering shaft cap.
ÉPass the hot starter cable
between the cylinder head
breather hose, oil tank breather
hose and ignition coil, then on
the outside of the left engine
bracket.
ÊPass the clutch cable through
the cable guides.ËPass the cylinder head breather
hose on the outside of the radia-
tor hose 1 and on the inside of
the radiator pipe (radiator hose
4).
ÌPass the clutch cable in front of
the lower radiator mounting boss.
ÍFasten the “ENGINE STOP” but-
ton lead and sub wire harness to
the frame at the protecting tube
of the sub wire harness with a
plastic locking tie and cut off the
tie end.
B
0
C-C
D-D
B
A
AB
DD
CC
F
D G
F
D
A
G
A
A
F
AE
A
DC A A A A B A 0
1
2
3
4 5 6 7 89
Ì
Ë
ÊÉ ÈÙÍ
Î
Ï
Ð
Ð Ñ
A
Ô Õ Ø
Ú HIH
E Û
Ò
Ö ×
Ê Ê Ê
Ó
Page 132 of 646

2 - 22
SPECCABLE ROUTING DIAGRAM
ÎFasten the “ENGINE STOP” but-
ton lead and sub wire harness to
the frame at the protecting tube
for the “ENGINE STOP” button
lead with a plastic locking tie and
cut off the tie end.
ÏFasten the sub wire harness and
hot starter cable to the frame at
the white tape for the sub wire
harness with a plastic locking tie
and cut off the tie end.
ÐFasten the sub wire harness to
the frame with a plastic locking
tie and cut off the tie end.
ÑPass the sub wire harness
between the engine brackets.ÒMake sure that the TPS coupler
does not go outside the chassis.
ÓFasten the TPS lead to the
frame with a plastic band.
ÔFasten the neutral switch lead
and oil hose together with a
plastic locking tie and cut off the
tie end.
ÕFasten the neutral switch lead to
the frame with a plastic band.
ÖFasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame with
a plastic band.×Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame with
a plastic locking tie and cut off
the tie end.
ØPass the neutral switch lead,
CDI magneto lead and radiator
breather hose between the radi-
ator and frame.
ÙFasten the neutral switch lead
and CDI magneto lead to the
cable guide at their protecting
tubes with a plastic locking tie
and cut off the tie end.
ÚPass the carburetor breather
hoses and overflow hose so that
all there hoses do not contact
the rear shock absorber.
B
0
C-C
D-D
B
A
AB
DD
CC
F
D G
F
D
A
G
A
A
F
AE
A
DC A A A A B A 0
1
2
3
4 5 6 7 89
Ì
Ë
ÊÉ ÈÙÍ
Î
Ï
Ð
Ð Ñ
A
Ô Õ Ø
Ú HIH
E Û
Ò
Ö ×
Ê Ê Ê
Ó
Page 140 of 646
2 - 26
SPECCABLE ROUTING DIAGRAM
1Throttle cable
2Fuel tank breather hose
3Clamp
4Clutch cable
5Hot starter cable
6“ENGINE STOP” button lead
7Brake hose
8Hose guideÈFasten the “ENGINE STOP” but-
ton lead to the handlebar with
the plastic band.
ÉPass the brake hose in front of
the number plate.
3
6
40˚±10˚
A
12
3
4
5
6
7
8 È
É
A
Page 520 of 646
5 - 42
CHAS
EC5B0000
HANDLEBAR
Extent of removal:
1 Handlebar removal
Extent of removal Order Part name Q’ty Remarks
HANDLEBAR REMOVAL
Preparation for removal Number plate Remove the clamp portion only.
1 Hot starter cable 1 Disconnect at the lever side.
2 Hot starter lever holder 1
3 Clutch cable 1 Disconnect at the lever side.
4 Clutch lever holder 1
5“ENGINE STOP” button 1
6 Master cylinder 1 Refer to “REMOVAL POINTS”.
7 Throttle cable cap 1
8 Throttle cable #2 (pushed) 1 Disconnect at the throttle side.
9 Throttle cable #1 (pulled) 1 Disconnect at the throttle side.
10 Grip (right) 1 Refer to “REMOVAL POINTS”.
11 Tube guide 1
12 Cover (grip cap) 1
13 Collar 1
14 Grip (left) 1 Refer to “REMOVAL POINTS”.
15 Handlebar holder (upper) 2
16 Handlebar 1
1
HANDLEBAR
Page 530 of 646
5 - 47
CHASHANDLEBAR
9. Install:
“ENGINE STOP” button 1
Clutch lever holder 2
Bolt (clutch lever holder) 3
Hot starter lever holder 4
Bolt (hot starter lever holder) 5
Clamp 6
NOTE:
The “ENGINE STOP” button, clutch lever
holder and clamp should be installed accord-
ing to the dimensions shown.
Pass the “ENGINE STOP” button lead in the
middle of the clutch lever holder.
T R..4 Nm (0.4 m · kg, 2.9 ft · lb)
T R..4 Nm (0.4 m · kg, 2.9 ft · lb)
10. Install:
Clutch cable 1
Hot starter cable 2
NOTE:
Apply the lithium soap base grease on the
clutch cable end and hot starter cable end.
11. Adjust:
Clutch lever free play
Refer to “CLUTCH ADJUSTMENT” sec-
tion in the CHAPTER 3.
Hot starter lever free play
Refer to “HOT STARTER LEVER
ADJUSTMENT” section in the CHAPTER
3.
12. Clamp the clamp portion a of the number
plate to the handlebar.
13. Insert the end of the fuel breather hose 1
into the hole in the steering shaft cap 2.
2 1a