2005 YAMAHA YZ125LC wheel torque

[x] Cancel search: wheel torque

Page 60 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 1-16
GEN
INFO
TORQUE-CHECK POINTS
EC1A0013
TORQUE-CHECK POINTS
Frame construction Frame to rear frame
Combined seat and tank Fuel tank to frame
Engine mounting Frame to engine
Engine bracket to engine

Page 76 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 2-9
SPECMAINTENANCE SPECIFICATIONS
NOTE:
1. First, tighten the ring nut approximately 38 Nm (3.8 m•kg, 27 ft•lb) by using the ring nut wrench,
then loosen the ring nut one turn.
2. Retighten the r

Page 77 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 2-10
SPECMAINTENANCE SPECIFICATIONS
Part to be tightened Thread size QtyT ightening torqueNm m•kg ft•lb
Rear brake master cylinder and frame M  6 ×1.0 2 10 1.0 7.2
Rear brake master cylinder cap

Page 202 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 3-35
STEERING HEAD INSPECTION AND ADJUSTMENT
INSP
ADJ
2. Inspect:
9Bearing free play
Exist play Replace.
EC36U070
STEERING HEAD INSPECTION AND
ADJUSTMENT
1. Elevate the front wheel by placing a suita