2005 YAMAHA YZ125LC clock

[x] Cancel search: clock

Page 142 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 3-5
INSP
ADJENGINE/COOLANT LEVEL INSPECTION/
COOLANT REPLACEMENT
EC350000
ENGINE
EC351011
COOLANT LEVEL INSPECTION
w
Do not remove the radiator cap 1 1
, drain
bolt and hoses when the engine and radia

Page 184 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 3-26
FRONT FORK INSPECTION
INSP
ADJ
3. Adjust:
9Drive chain slack
EC36C000
FRONT FORK INSPECTION
1. Inspect:
9Front fork smooth action
Operate the front brake and stroke the
front fork.
Unsmooth actio

Page 210 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 3-39
IGNITION TIMING CHECK
INSP
ADJ
EC372012
IGNITION TIMING CHECK
1. Remove:
9Fuel tank
Refer to “SEAT, FUEL TANK AND SIDE
COVERS” section in the CHAPTER 4.
9Spark plug
9Crankcase cover (left)
2.

Page 222 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 4-5
ENGRADIATOR
EC456000
HANDLING NOTE
w
Do not remove the radiator cap when the
engine and radiator are hot. Scalding hot
fluid and steam may be blown out under
pressure, which could cause serious in

Page 298 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 4-43
ENG
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
GEAR
4. Hook:
9Torsion spring 1
NOTE:
Turn the torsion spring clockwise and hook into
the proper hole ain the crankcase.
EC4C5402
Kick idle gear
1. In

Page 300 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 4-44
ENG
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
GEAR
5. Install:
9Crankcase cover (right) 1
NOTE:
Mesh the governor gear 2, and impeller shaft
gear 3with primary drive gear 4.
6. Install:
9Bolt [cra

Page 318 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 4-53
ENGCDI MAGNETO
EC4L3000
REMOVAL POINTS
EC4L3102
Rotor
1. Remove:
9Nut (rotor) 1
9Plain washer 2
Use the rotor holding tool 3.
2. Remove:
9Rotor 1
Use the flywheel puller 2.
NOTE:
When installing

Page 348 of 568

YAMAHA YZ125LC 2005  Notices Demploi (in French) 8. Install:
9Segment 1
9Bolt (segment) 2
NOTE:
9When installing the segment onto the shift cam
3, align the punch mark awith the dowel pin
b.
9Turn the segment clockwise until it stops and
tighten the
Page:   1-8 9-16 next >