Downloaded from www.Manualslib.com manuals search engine 266
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Remove:
- The fixings of the pipe linking the power steering pump with the rotary valve.
- The clutch lower closing plate.
- Lock the engine flywheel, using tool [6].
Remove the screw (8).
Refit the screw (8)without its thrust washer.
Remove:
- The accessories pulley (9), using tool [8].
- Tool [6].
- The lower torque reaction rod.
Support the engine by means of a workshop hoist.
Remove:
- The bearing shell fitting (10).
- The nut (12).
- Screws (11).
- The bracket (13).
NOTE:Lift then lower the engine with the workshop hoist, to have access to the
timing cover fixing screws.
Remove:
- The intermediate timing cover.
- The lower timing cover.
B1CP04BCB1BP2R3CB1BP2R4C
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 266