Page 180 of 462
Downloaded from www.Manualslib.com manuals search engine 174
ENGINEXSARA
AUXILIARY EQUIPMENT DRIVE BELT
Power-assisted steering, with air conditioning
Tools.
[1] Dynamic tensioner peg: (-) 0188 H
[2] Belt tension measuring instrument: 4122-T
Removal.
Peg the dynamic tensioner (1) at "a", using tool [1].
Loosen the screw (2)of the roller (3).
Turn the roller (3)backwards.
Remove the belt.
NOTE:If it can not be pegged at "a":
- Loosen the screw (2)of the roller (3).
- Using a 7 mmsquare drive, turn the roller (3)at "b".
- Peg the tensioner (1) at "a", using tool [1].
NOTE: If the belt is broken:
- Support the engine using a jack
(insert a wooden block between the housing and the jack).
- Remove the right engine support.
- Using a square drive at (b)turn the tool (3)in the direction of the arrow "a", so that it can be
pegged at "a"using the tool [1].
B1BP1SKC
Engine: WJY
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 174
Page 241 of 462
Downloaded from www.Manualslib.com manuals search engine 235
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
Setting the timing (continued).
Remove the tool [3].
Rotate the engine by means of the crankshaft pinion screw (2)
(clockwise), to bring it to the pegging position.
Peg the camshaft pulley, using tool [4].
Peg:
- The crankshaft pinion (6), using tool [5].
- The high pressure pump pinion, using tool [5].
Support the engine with the aid of a roller jack equipped with a chock.
Remove:
- The RH engine support (7).
- The intermediate engine support
(right hand side)(8).
B1JP03SCB1EP18DCB1EP195CB1BP2LYC
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 235
Page 246 of 462
Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the catalytic converter flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 240
Page 249 of 462
Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 243
Page 254 of 462

Downloaded from www.Manualslib.com manuals search engine 248
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
IMPERATIVE: Should it be impossible to peg the camshaft, check that the offset between the camshaft hole and the pegging hole is not
more than 1 mm. If the offset is too great, repeat the operation to position the timing belt
(see corresponding operation).
Remove the tools [2]and [3].
Refit tool [1]at «b».
Remove the screw (8).
Refit:
- The upper timing cover (11).
- The lower timing cover (12).
- The pulley (9).
- The screw (8).
Tightening methodfor the screw (8):
- Pre-tighten to 3 ± 0,3 m.daN.
- Angular tighten 180° ± 5°.
Remove tool [1].Refit:
- The engine support (7), tighten to 5,5 ± 0,9 m.daN.
- The engine support (3).
- The four screws (5), tighten to 5,5 ± 0,8 m.daN.
- The three screws (4), tighten to 5,5 ± 0,8 m.daN.
- The electrical harness (6).
Disengage the jack from under the engine.
Complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 248
Page 255 of 462
Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports (4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 249
Page 259 of 462
Downloaded from www.Manualslib.com manuals search engine 253
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1]Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports(4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 253
Page 264 of 462
![Citroen XSARA PICASSO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit: Citroen XSARA PICASSO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:](/manual-img/9/4138/w960_4138-263.png)
Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
- Screw (10)Pre-tighten to: 3 ± 0,3 m.daN.
Angular tighten: 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 258