Page 267 of 462
Downloaded from www.Manualslib.com manuals search engine 261
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: WJY
Setting the timing (continued).
Peg the camshaft hub, using tool[4].
Peg the injection pump hub, using tool[3].
Slacken screws (5)and (6).
Slacken screw (9)of the tensioner roller (8).
Remove the timing belt.
Refitting.
Retighten screws (5)and (6) by hand.
Turn the pinions (10)and(7)clockwise in order to place them at end of slots.
Fit the timing belt on the crankshaft.
Hold the belt, using tool [5].
Position the timing belt in the following sequence:
- Guide roller (11).
- Injection pump pinion (7).
- Camshaft pinion (10).
- Coolant pump pinion (12).
- Tensioner roller (8).
B1EP16PDB1EP1EDCB1EP132C
XSARA
B1EP1EEC
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 261
Page 268 of 462

Downloaded from www.Manualslib.com manuals search engine 262
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1EP1EDC
Setting the timing (continued).
NOTE:If necessary, you can slightly rotate the pinions (10)and (7)anti-clockwise in order to engage the belt.
The angular displacement value of the belt in relation to the pinions should not be more than half a tooth.
Remove tool [5].
Act on the tensioner roller (8)by its square «a», using tool [6]to check that the camshaft and injection
pump pinions can turn freely.
Position the belt tension instrument [7]on the belt at «b».
Using tool [6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
106 ± 2 SEEMunits.
Tighten screws (9), (5) and (6).
Remove tools [7], [2], [3]and [4].
Rotate the crankshaft 8 times
in the normal direction of rotation.
Peg the flywheel, using tool [2].
Peg the camshaft hub, using tool [4].
Peg the injection pump hub, using tool [3].
Slacken screws (9), (5)and (6).
Position the belt tension instrument [7]on the belt at «b».
Using tool [6], act at «a»in the direction opposite to that of engine rotation, to obtain a tension value of
42 ± 2 SEEMunits.
B1EP1EFC
XSARA
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 262
Page 274 of 462
Downloaded from www.Manualslib.com manuals search engine 268
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: RHY - RHZ
Reposition the timimg belt, belt at «a»well tensioned, in the following order:
- Fuel high pressure pump pulley (21).
- Guide roller (15).
- Crankshaft pinion (19).
- Coolant pump pinion (16).
- Tensioner roller (18).
Position tool [1]on the belt at «a».
Remove tools [4]and [9].
Turn the tensioner roller (18)anti-clockwise, using tool [2], to attain an overtension of:
98 ± 2 SEEMunits.
Tighten screw (17)of the tensioner roller to 2,5 ± 0,2 m.da N.
Lock the flywheel by means of tool [6].
Tighten the accessories drive pulley screw (8)to 7 ± 0,7 m.da N.
Remove tools [1], [3], [5]and [6].
Rotate the crankshaft eight times in the normal direction of rotation.
Peg:
- The crankshaft, using tool [3].
- The camshaft drive pulley, using tool [5].
B1EP1ABD
B1EP1ACC
XSARA - XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 268
Page 283 of 462
Downloaded from www.Manualslib.com manuals search engine 277
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
Rotate the crankshaft ten times
(in the direction of rotation of the engine).
Peg the crankshaft, using tool [2] and the camshaft drive pinion, using tool [3].
Lock the flywheel, using tool [6].
Slacken the screw (8)of the auxiliaries drive pulley (7) and the screw (12)of
the tensioner roller (17).
Turn the tensioner roller
(clockwise), using a hexagonal spanner at «e».
Position the index «d»opposite the notch «f».
Tighten:
- The screw (12)of the tensioner roller (17)to 2,1 ± 0,2 m.daN.
- The auxiliaries drive pulley to 7 ± 0,7 m.daN.
Remove tools [2], [3]and [6].
Rotate the crankshaft two times
(in the direction of rotation of the engine).
Refit tools [2]and [3].
Check the position of the index «d», it should be opposite the notch «f».
B1EP1FKC
B1EP1FLC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 277