2005 CHRYSLER VOYAGER ipm

[x] Cancel search: ipm

Page 136 of 2339

CHRYSLER VOYAGER 2005  Service Manual master cylinder reservoir from completely draining
out.
(3) Disconnect the brake fluid flex hose from the
caliper assembly and remove it from the vehicle.
CAUTION: Do not use excessive force when clam

Page 140 of 2339

CHRYSLER VOYAGER 2005  Service Manual (3) Disconnect the brake fluid flex hose from the
caliper assembly and remove it from the vehicle.
CAUTION: Do not use excessive force when clamp-
ing caliper in vise. Excessive vise pressure will
cau

Page 165 of 2339

CHRYSLER VOYAGER 2005  Service Manual DIAGNOSIS AND TESTING - PROPORTIONING
VALVE (HEIGHT SENSING)
CAUTION: The use of aftermarket load leveling or
load capacity increasing devices on this vehicle is
prohibited. Using air shock absorbers

Page 170 of 2339

CHRYSLER VOYAGER 2005  Service Manual Minimum allowable thickness is the minimum
thickness which the brake rotor machined surface
may be cut to.
CAUTION: Do not machine the rotor if it will cause
the rotor to fall below minimum thickness.

Page 171 of 2339

CHRYSLER VOYAGER 2005  Service Manual SPECIFICATIONS
BRAKE ROTOR
When refacing a rotor, the required TIR (Total
Indicator Reading) and thickness variation limitsMUST BE MAINTAINED. Extreme care in the oper-
ation of rotor turning equipmen

Page 201 of 2339

CHRYSLER VOYAGER 2005  Service Manual CAUTION
The ABS uses an electronic control module, the
CAB. This module is designed to withstand normal
current draws associated with vehicle operation.
Care must be taken to avoid overloading the CAB

Page 218 of 2339

CHRYSLER VOYAGER 2005  Service Manual (21) Bleed the Base and ABS brake hydraulic sys-
tems (Refer to 5 - BRAKES - STANDARD PROCE-
DURE).
(22) Road test vehicle to ensure proper operation
of the base and antilock brake systems.
INSTALLATI

Page 220 of 2339

CHRYSLER VOYAGER 2005  Service Manual COOLING
TABLE OF CONTENTS
page page
COOLING
DESCRIPTION
DESCRIPTION - COOLING SYSTEM........1
DESCRIPTION - HOSE CLAMPS...........1
OPERATION
OPERATION - COOLING SYSTEM.........2
OPERATION - HOSE CLAM
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 49-56 ... 128 next >