2004 YAMAHA YZ125LC clutch

[x] Cancel search: clutch

Page 76 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 2-9
SPECMAINTENANCE SPECIFICATIONS
NOTE:
1. First, tighten the ring nut approximately 38 Nm (3.8 m•kg, 27 ft•lb) by using the ring nut wrench,
then loosen the ring nut one turn.
2. Retighten the r

Page 120 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 2-15
SPECCABLE ROUTING DIAGRAM
1Cable guide
2Radiator breather hose
3Ignition coil
4CDI magneto lead
5Clutch cable
6CDI unit band
7CDI unit
8Wireharness
9High tension cord
0Clamp
qCDI unit bracketAPas

Page 124 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 2-17
SPECCABLE ROUTING DIAGRAM
AInstall the brake hose so that its pipe portion 
directs as shown and lightly touches the 
projection on the master cylinder.
BPass the “ENGINE STOP” button lead in

Page 126 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 3-1
MAINTENANCE INTERVALS
INSP
ADJ
EC300000
REGULAR INSPECTION AND ADJUSTMENTS
EC310053
MAINTENANCE INTERVALS
The following schedule is intended as a general guide to maintenance and lubrication. Bear

Page 138 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 3-4
PRE-OPERATION INSPECTION AND MAINTENANCE
INSP
ADJ
EC320000
PRE-OPERATION INSPECTION AND MAINTENANCE
Before riding for break-in operation, practice or a race, make sure the machine is in good opera

Page 150 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 3-9
INSP
ADJ
CLUTCH ADJUSTMENT
NOTE:
9Do not apply pressure more than specified
pressure.
9Radiator should be filled fully.
4. Inspect:
9Pressure
Impossible to maintain the specified pres-
sure for 10

Page 206 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 3-37
LUBRICATION
INSP
ADJ
EC36a042
LUBRICATION
To ensure smooth operation of all components,
lubricate your machine during setup, after break-
in, and after every race.
1All control cable
2Clutch leve

Page 224 of 568

YAMAHA YZ125LC 2004  Notices Demploi (in French) 4-6
ENGRADIATOR
EC455000
ASSEMBLY AND INSTALLATION
EC445344
Radiator
1. Install:
9Radiator breather hose 1
9Radiator hose 3 2
9Radiator hose 1 3
To radiator (right) 4.
NOTE:
Clamp the radiator hose in
Page:   < prev 1-8 9-16 17-24 25-32 next >