Page 154 of 801

YH4
GRAND
VITARA
1. P / S fluid reservoir
2. Attachment
3. Gasket4. Union bolt
5. High pressure side
6. Low pressure side
1. P / S fluid reservoir
2. Gauge valve (open)
3. P / S pump4. P / S gear box
5. High pressure side
6. Low pressure side
3B1-10 POWER STEERING (P / S) SYSTEM
HYDRAULIC PRESSURE IN P / S CIRCUIT
HYDRAULIC PRESSURE CHECK
1) After cleaning joint of high pressure hose and P / S pump thor-
oughly, disconnect hose from pump and install special tool (oil
pressure gauge, attachment and hose).
Tighten each flare nut to specified torque.
CAUTION:
Take care not to cause damage to A / C condenser during
service operation, if equipped.
Special Tool
(A): 09915-77410 (Oil pressure gauge)
(B): 09915-77420
2) Check each connection for fluid leakage and bleed air.
Refer to ªAIR BLEEDING PROCEDUREº in this section.
3) With engine idling, turn steering wheel and warm up engine till
temperature of fluid in P/S fluid reservoir rises to 50 ± 60C (122
± 140F).
4) Check back pressure by measuring hydraulic pressure with en-
gine idling and hands off steering wheel.
Back pressure: Lower than 1000 kPa (10 kg / cm
2, 142 psi)
When back pressure is higher than specified values, check con-
trol valve and piping for clogging.
Page 155 of 801

YH4
GRAND
VITARA
1. P / S fluid reservoir
2. Gauge valve (shut)
3. Oil pressure gauge
4. P / S pump
5. P / S gear box
1. P / S fluid reservoir
2. Gauge valve (open)
3. Oil pressure gauge
4. P / S pump
5. P / S gear box
POWER STEERING (P / S) SYSTEM 3B1-11
5) Check relief pressure
Increase engine speed to about 1,500 r / min (rpm). Close
gauge valve gradually while watching pressure increase indi-
cated by gauge and take reading of relief pressure (maximum
hydraulic pressure).
Relief pressure:
6200 ± 7000 kPa
(62 ± 70 kg / cm
2, 882 ± 995 psi) G16 Type engine. . . . . . .
6700 ± 7500 kPa
(67 ± 75 kg / cm
2, 953 ± 1067 psi) J20 Type engine. . . . . . .
7050 ± 7850 kPa
(70.5 ± 78.5 kg / cm
2, 1003 ± 1116 psi) H25 Type engine. .
When it is higher than specified values, possible cause is mal-
function of relief valve.
When it is lower than specified values, possible cause is either
failure of P / S pump or settling of relief valve spring.
CAUTION:
Be sure not to close gauge valve for longer than 10 se-
conds.
Next, open gauge valve fully and increase engine speed to
about 1,500 r / min (rpm). Then turn steering wheel to the left
or right fully and take reading of relief pressure.
Relief pressure:
6200 ± 7000 kPa
(62 ± 70 kg / cm
2, 882 ± 995 psi) G16 Type engine. . . . . . .
6700 ± 7500 kPa
(67 ± 75 kg / cm
2, 953 ± 1067 psi) J20 Type engine. . . . . . .
7050 ± 7850 kPa
(70.5 ± 78.5 kg / cm
2, 1003 ± 1116 psi) H25 Type engine. .
When it is higher than specified values, possible cause is mal-
function of relief valve.
When it is lower than specified values, possible cause is failure
in steering gear box. Replace gear box.
CAUTION:
Be sure not to hold steering wheel at fully turned posi-
tion for longer than 10 seconds.
BOOT
STEERING RACK BOOT CHECK
Check boot for crack and damage which, if any, means possibility
of rusty gear, entry of dust or lack of grease. Also, check if any of
such faulty conditions exists.
Check steering rack boot for dent or breakage.
If there is a dent, keep boot in most compressed state for some se-
conds to correct dent.
Page 156 of 801

YH4
GRAND
VITARA
3B1-12 POWER STEERING (P / S) SYSTEM
TIE-ROD END BOOT CHECK
Check boot for crack and damage and if any, replace it with a new
one.
AIR BLEEDING PROCEDURE
1) Hoist the front end of vehicle and apply safety stands.
2) Fill P / S fluid reservoir with fluid up to specified level.
NOTE:
Before starting engine, place transmission gear shift lever
in ªNeutralº (shift selector lever to ªPº range for A / T mod-
el), and set parking brake.
3) After running engine at idling speed for 3 to 5 seconds, stop it
and add fluid to satisfy specification.
4) With engine stopped, turn steering wheel to the right and left as
far as it stops, repeat it a few times and fill fluid to specified level.
5) With engine running at idling speed, repeat stop-to-stop turn of
steering wheel till all foams in P / S fluid reservoir are gone.
NOTE:
Make sure to bleed air completely. If air remains in fluid, P / S
pump may make humming noise or steering wheel may feel
heavy.
6) Finally check to make sure that fluid is filled to specified level.
Page 158 of 801

YH4
GRAND
VITARA
1. High pressure pipe
2. Union bolt3. Low pressure hose
4. Steering lower shaft bolt
3B1-14 POWER STEERING (P / S) SYSTEM
3) After installing wheels, lower vehicle and tighten wheel nuts to
specified torque.
Tightening Torque
(a): 100 N
.m (10.0 kg-m, 72.5 lb-ft)
4) Check that proper amount of toe-in is obtained by referring to
ªFRONT WHEEL ALIGNMENTº.
5) After confirming proper amount of toe-in, tighten tie-rod end lock
nut to specified torque.
Tightening Torque
(a): 65 N
.m (6.5 kg-m, 47.0 lb-ft)
POWER STEERING GEAR BOX
ASSEMBLY
REMOVAL
1) Take out fluid in P / S fluid reservoir with syringe or such.
2) Disconnect high pressure pipe from steering gear box by remov-
ing union bolt.
NOTE:
As fluid flows out of disconnected joints, put a receptacle
under joints or a plug to pipe.
3) Disconnect low pressure hose from steering gear box.
NOTE:
As fluid flows out of disconnected joints, put a receptacle
under joints or a plug to hose.
4) Remove steering lower shaft bolt.
5) Hoist vehicle and remove both right and left wheels.
6) Disconnect both right and left tie rod ends from knuckle, refer to
steps 2) to 3) of ªTIE-ROD END REMOVALº in this section.
Page 160 of 801

YH4
GRAND
VITARA
3B1-16 POWER STEERING (P / S) SYSTEM
1. Clip
2. Wire
Make marking here
RACK BOOT AND TIE-ROD (EXCEPT CANVAS
TOP LH MODEL)
REMOVAL
CAUTION:
Never disassemble tie-rod except for canvas top LH model.
Performing this prohibited service will affect original per-
formance.
1) Remove steering gear box by referring to ªPOWER STEERING
GEAR BOX ASSEMBLY REMOVALº in this section.
2) For ease of adjustment after installation, make marking of tie-rod
end lock nut position of tie-rod end thread.
3) Loosen tie-rod end lock nut and remove tie-rod end.
4) Remove boot wire and clip.
5) Remove boot from tie-rod.
INSTALLATION
1) Visually inspect that rack and rack end ball joint are free from dirt
or foreign matters. Clean thoroughly with cloth or such.
Position boot properly in grooves of gear case and tie-rod and
clamp it with wire and clip.
Wire should be new and should go around twice.
Pull its both ends together by screw driver or such and make
sure that the wire won't be crossed. Then twist the ends several
times, the twisted ends should be bent in the circumferential
direction.
After this, check to ensure that wire is tight and boot is free from
twist and dent.
Page 161 of 801

YH4
GRAND
VITARA
POWER STEERING (P / S) SYSTEM 3B1-17
1. Tie-rod
2. Steering rack
3. Boot
4. Mark
1. Tie-rod lock washer
2. Tie-rod
3. Steering rack
4. Aluminium plate
5. Vise
1. Tie-rod
2. Mark
3. Lock nut
4. Tie-rod end
5. Knuckle
6. Nut
2) Install tie-rod end lock nut and tie-rod end to tie-rod. Position lock
nut to the mark made in removal.
3) Install steering gear box assembly by referring ªPOWER
STEERING GEAR BOX ASSEMBLY INSTALLATIONº in this
section.
After installation, fill specified P / S fluid and bleed air from sys-
tem. Then check toe setting and adjust as required.
RACK BOOT AND TIE-ROD
(FOR CANVAS TOP LH MODEL)
REMOVAL
1) Remove steering gear case, refer to ªPOWER STEERING
GEAR BOX ASSEMBLY REMOVALº in this section.
2) For ease of adjustment after installation, make marking of tie-rod
end lock nut position of tie-rod thread.
3) Loosen tie-rod end lock nut and remove tie-rod end.
4) Remove boot band and clip.
5) Remove boot from tie-rod.
6) Unbend washer (2 places), and remove tie-rod from rack.
Page 162 of 801
YH4
GRAND
VITARA
3B1-18 POWER STEERING (P / S) SYSTEM
ªAº
1
1
1. Mark
1. Tie-rod lock washer
(A)
INSTALLATION
1) Install new tie-rod lock washer and tie-rod to rack.
2) Tighten tie-rod ball nut to specified torque.
Tightening Torque
(a): 85 N
.m (8.5 kg-m, 61.5 lb-ft)
3) Bend lock washer 2 place at the flat part of tie-rod ball nut.
4) Apply grease to ªAº indicated in figure.
5) Position boot properly in grooves of gear case and tie-rod.
Check to ensure that boot is free from twist and dent.
6) Fasten boot with new clamp and clip securely.
Special Tool
(A): 09943-55010
7) Install tie-rod end lock nut and tie-rod end to tie-rod.
Position lock nut to marking made in removal.
NOTE:
When tie-rod was replaced, measure length ªAº on re-
moved tie-rod and use it on new replacement tie-rod so as
to position lock nut properly.
8) Install steering gear case. Refer to ªPOWER STEERING GEAR
BOX ASSEMBLY INSTALLATIONº in this section.
Page 166 of 801

YH4
GRAND
VITARA
3B1-22 POWER STEERING (P / S) SYSTEM
1. Flow control spring
1. Oil seal
2. Shaft (pulley)
1. O-ring
1. Side plate
2. Bolt hole
1. Rotor
2. Snap ring
3. Dot
Check free length of relief valve spring.
Free length: Standard 22.0 mm (0.866 in.)
Limit 19.0 mm (0.748 in.)
Replace if any defective is found.
ASSEMBLY
Reverse disassembly procedure for assembly, noting the following.
1) Apply grease to oil seal lip and apply power steering fluid to slid-
ing surface of the shaft then insert pulley's shaft from oil seal side
of the pump body.
ªAº: Grease 99000-25010
2) Apply power steering fluid to O-rings and fit them to pump body.
3) Install side plate to pump body.
NOTE:
Carefully align the dowel pins on the side plate at bolt hole
as shown in figure.
4) Apply power steering fluid to sliding surface of rotor.
5) Install rotor to shaft, directing dot marked side of rotor facing up.
6) Install new snap ring to shaft, then make sure to fit snap into shaft
groove securely.
NOTE:
Never reuse the removed snap ring.