2004 CHRYSLER VOYAGER relay

[x] Cancel search: relay

Page 538 of 2585

CHRYSLER VOYAGER 2004  Service Manual DAYTIME RUNNING LAMPS
Power is reduced using pulse-width modulation to
the high beams, where by the power is switched on
and off rapidly instead of remaining on continuously.
The duration and interval

Page 542 of 2585

CHRYSLER VOYAGER 2004  Service Manual FRONT FOG LAMP
DIAGNOSIS AND TESTING - FRONT FOG LAMP
When a vehicle experiences problems with the
front fog lamp system, verify the condition of the bat-
tery connections, fuses, charging system, fog

Page 543 of 2585

CHRYSLER VOYAGER 2004  Service Manual CONDITION POSSIBLE CAUSES CORRECTION
FOG LAMPS FLASH
RANDOMLY1. Poor lighting circuit Z349/Z248
ground.1. Test for voltage drop across Z349/Z248
ground locations. Refer to Electrical, Wiring
Informati

Page 545 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
(1) Install mounting nuts.
(2) Reconnect the wire harness to the fog lamp
bulb.
(3) Reconnect the battery negative cable.
HEADLAMP
DIAGNOSIS AND TESTING - HEADLAMP
When a vehicle experien

Page 619 of 2585

CHRYSLER VOYAGER 2004  Service Manual ered. This defeats the day-detect logic. If OK, go to
Step 8. If not OK, replace the faulty mirror unit.
(8) With the mirror darkened, place the transmis-
sion gear selector lever in the Reverse posit

Page 623 of 2585

CHRYSLER VOYAGER 2004  Service Manual Refer toHeated Seat Systemfor more informa-
tion on the heated seat system. Refer toRemote
Keyless Entry Systemin Power Lock Systems for
more information on the RKE system.
Refer toWiring Diagramsfor

Page 624 of 2585

CHRYSLER VOYAGER 2004  Service Manual WARNING: SOME VEHICLES ARE EQUIPPED WITH
SEATBACK MOUNTED AIRBAGS. BEFORE
ATTEMPTING TO DIAGNOSE OR SERVICE ANY
SEAT OR POWER SEAT SYSTEM COMPONENT
YOU MUST FIRST DISCONNECT AND ISOLATE THE
BATTERY NE

Page 635 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
(1) Obtain new vent window motor.
(2) Snap the actuator link socket onto the quarter
window ball socket. Using a soft rubber mallet, push
the circular link tab flush with link surface.
(3