2004 CHRYSLER VOYAGER lock

[x] Cancel search: lock

Page 1480 of 2585

CHRYSLER VOYAGER 2004  Service Manual (7) Install a spark plug adapter in the spark plug
hole. Connect air hose that can supply 620.5±689 kPa
(90±100 psi) of air pressure to adapter. This is to
hold valves in place while servicing compo

Page 1481 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
INSTALLATION - CYLINDER HEAD OFF
(1) If removed, install a new valve stem seal (Refer
to 9 - ENGINE/CYLINDER HEAD/VALVE STEM
SEALS - INSTALLATION).
(2) Position valve spring and retainer

Page 1493 of 2585

CHRYSLER VOYAGER 2004  Service Manual (4) Insert muffler pipe into catalytic converter pipe
until the hangers are positioned as shown in (Fig. 11)
CAUTION: Band clamps should never be tightened
such that the two sides of the clamps are bo

Page 1498 of 2585

CHRYSLER VOYAGER 2004  Service Manual (5) Install the six screws attaching rear fascia to
rear fascia brackets.
(6) Install the four plastic push pins attaching bot-
tom of rear fascia to fascia support.
(7) Lower vehicle.
(8) Install the

Page 1505 of 2585

CHRYSLER VOYAGER 2004  Service Manual REMOVAL
The front cradle crossmember must be installed in
the design location to achieve proper front end sus-
pension alignment. If the cradle crossmember is
removed without applying reference marks

Page 1506 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
NOTE: If cradle crossmember requires replacement.
Refer to Group 2, Suspension, to transfer suspen-
sion components and Group 19, Steering, to trans-
fer steering components.
(1) Support

Page 1512 of 2585

CHRYSLER VOYAGER 2004  Service Manual FUEL LEVEL SENDING UNIT /
SENSOR
DESCRIPTION
The fuel gauge level sending unit is attached to the
side of fuel pump module. The level sensor is a vari-
able resistor.
OPERATION
Its resistance changes

Page 1513 of 2585

CHRYSLER VOYAGER 2004  Service Manual (4) Install level sensor wires in connector. Push
the wires up through the connector and then pull
them down until they lock in place. Ensure signal
and ground wires are installed in the correct posi-