2 - 18
SPECCABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1Fuel tank breather hose
2Clutch cable
3Oil tank breather hose
4Hot starter cable
5Cylinder head breather hose
6Cable guide
7Hose guide
8Brake hose
9Engine stop switch lead
0Clamp
ASub-wire harness
BThrottle position sensor lead
CNeutral switch lead
DOil hose
ECDI magneto lead
FRadiator breather hose
GCarburetor breather hose
HCarburetor overflow hoseÅPass the fuel tank breather hose
between the handlebar and ten-
sion bar, then insert its end into
the hole of the number plate.
ıPass the hot starter cable
between the cylinder head
breather hose, oil tank breather
hose and ignition coil, then on
the outside of the left engine
bracket.
ÇPass the clutch cable through
the cable guides.
ÎPass the clutch cable in front of
the radiator mounting boss.
‰Fit the brake hose into the
guides on the protector.ÏFasten the neutral switch lead
and CDI magneto lead to the
cable guide with a plastic locking
tie and cut off the tie end.
ÌFasten the engine stop switch
lead, neutral switch lead and
CDI magneto lead.
ÓFasten the engine stop switch
lead and sub-wire harness.
ÈFasten the sub-wire harness
and hot starter cable at the white
tape for the sub-wire harness.
ÔFasten the sub-wire harness.
Pass the sub-wire harness
between the engine brackets.