Page 252 of 662
3 - 46
INSP
ADJ
IGNITION TIMING CHECK
IGNITION TIMING CHECK
1. Remove:
Timing mark accessing screw 1
2. Attach:
Timing light
Inductive tachometer
To the spark plug lead.
3. Check:
Ignition timing
Timing light:
YM-33277-A/90890-03141
Inductive tachometer:
YU-8036-B
Engine tachometer:
90890-03113
Checking steps:
Start the engine and let it warm up. Let the
engine run at the specified speed.
Engine speed:
1,900 ~ 2,100 r/min
Visually check the stationary pointer a is
within the firing range b on the rotor.
Incorrect firing range → Check rotor and
pickup assembly.
4. Install:
Timing mark accessing screw
Page 418 of 662
4 - 83
ENGENGINE REMOVAL
Extent of removal:1 Engine removal
Extent of removal Order Part name Q’ty Remarks
Ignition coil
Disconnect the CDI magneto lead.
Right engine guard
1 Lower engine guard 1
2 Neutral switch 1
3 Bolt (oil hose) 2
4 Drive chain sprocket cover 1
5 Nut (drive sprocket) 1
Refer to “REMOVAL POINTS”. 6 Lock washer 1
7 Drive sprocket 1
8 Clip 1
9 Bolt (brake pedal) 1
10 Brake pedal 1
11 Upper engine bracket 2
12 Lower engine bracket 2
13 Engine mounting bolt 3
14 Pivot shaft 1
Refer to “REMOVAL POINTS”.
15 Engine 1
1
Page 582 of 662

6 - 1
–+ELEC
ELECTRICAL COMPONENTS AND WIRING DIAGRAM
EC600000
ELECTRICAL
EC610000
ELECTRICAL COMPONENTS AND WIRING DIAGRAM
EC611000
ELECTRICAL COMPONENTS
1
Engine stop switch
2
Throttle position sensor
3
Neutral switch
4
CDI magneto
5
Spark plug
6
Ignition coil
7
CDI unit
COLOR CODE
B...................... Black
Br .................... Brown
G ..................... Green
L ...................... Blue
O ..................... Orange
P...................... Pink
R ..................... Red
Sb.................... Sky blue
EC612000
WIRING DIAGRAM
71
5
62
3
4
B/WB/W
B/L
B/Y
SbSb
G/B
LYLY
P
B
B
B
B
G
O
WR
P
GW
R PP
B Br W
W
B/YGBr
G RR
OB Sb Sb Y
Y
WY
W
GG
B
PP
Br BrR R
OL
B SbY LL
B/L B/WB/W G/B
B B
B/L L Sb
B/L
G/B G/B
B/Y
B/Y B/W
O B/W
BrBr
W ..................... White
Y ...................... Yellow
B/L ................... Black/Blue
B/W .................. Black/White
B/Y ................... Black/Yellow
G/B................... Green/Black
L/W .................. Blue/White
R/W .................. Red/White
Page 584 of 662

–+ELEC
6 - 2
MAP-CONTROLLED CDI UNIT
MAP-CONTROLLED CDI UNIT
A map-controlled, CDI ignition system is used in the YZ250F.
The microcomputer in the CDI unit detects the engine speed and throttle position, thus determining
the optimum ignition timing through the entire operating range. In this way, quick throttle response
can be achieved according to various riding conditions.
CDI unit
Throttle position sensor
Pickup coil CDI magneto rotorIgnition coil
Function of Component
Component Function
Throttle position sensor Detects throttle valve opening and inputs it into the computer in the
CDI unit as a throttle opening signal.
Pickup coil Detects signal rotor revolutions and inputs them into the computer in
the CDI unit as engine revolution signals.
CDI unit The signals of the throttle position sensor and pickup coil sensor are
analyzed by the computer in the CDI unit, which then adjusts ignition
timing for the operation requirements.
Principal of 3-Dimensional Control
Conventionally, ignition timing was controlled only
by engine revolutions (2-dimensional control).
However, ignition timing needs advancement also
by engine load. Thus, accurate ignition timing can
be determined by adding throttle opening to deter-
mine ignition timing (3-dimensional control).
3-D Image Map of Ignition Timing
(different from actual characteristics)
Revolutions
Ignition timing
Throttle opening
Page 588 of 662
–+ELEC
6 - 3
IGNITION SYSTEM
EC620000
IGNITION SYSTEM
INSPECTION STEPS
Use the following steps for checking the possibility of the malfunctioning engine being attributable to
ignition system failure and for checking the spark plug which will not spark.
*marked: Only when the ignition checker is used.
NOTE:
Remove the following parts before inspection.
1) Seat
2) Fuel tank
Use the following special tools in this inspection.
Dynamic spark tester:
YM-34487
Ignition checker:
90890-06754
Pocket tester:
YU-3112-C/90890-03112
Spark gap test*Clean or replace
spark plug.
Check entire ignition
system for connection.
(couplers, leads and
ignition coil)Repair or replace.
Check engine stop switch. Replace.
Check ignition coil. Primary coil Replace.
Secondary coil Replace.
Check CDI magneto. Pickup coil Replace.
Charging coil Replace.
Check neutral switch. Repair or replace.
Replace CDI unit.
No spark
OK
OK
OK
OK
OK
Spark
No good
No good
No good
No good
No good
No good
No good
Page 592 of 662

6 - 4
–+ELEC
IGNITION SYSTEM
SPARK GAP TEST
1. Disconnect the spark plug cap from spark
plug.
2. Remove the ignition coil cap.
3. Connect the dynamic spark tester
1
(ignition checker
2
) as shown.
Ignition coil
3
Spark plug
4
Å
For USA and CDN
ı
Except for USA and CDN
4. Kick the kickstarter crank.
5. Check the ignition spark gap.
6. Start engine, and increase spark gap until
misfire occurs. (for USA and CDN only)
Minimum spark gap:
6.0 mm (0.24 in)
Å
ı
COUPLERS, LEADS AND IGNITION COIL
CONNECTION INSPECTION
1. Check:
Couplers and leads connection
Rust/dust/looseness/short-circuit
→
Repair or replace.
Ignition coil and spark plug as they are
fitted
Push in the ignition coil until it closely
contacts the spark plug hole in the cyl-
inder head cover.
ENGINE STOP SWITCH INSPECTION
1. Inspect:
Engine stop switch conduct
No continuous while being pushed
→
Replace.
Continuous while being freed
→
Replace.
Tester (+) lead
→
Black/White lead
1
Tester (–) lead
→
Black lead
2
B/W
1
B
2
Tester selec-
tor position
PUSH IN
Ω
×
1
FREE
B/W B
11 2 2
Page 594 of 662
6 - 5
–+ELEC
IGNITION SYSTEM
EC626002
IGNITION COIL INSPECTION
1. Inspect:
Primary coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
Orange lead
1
Tester (–) lead
→
Black lead
2
Primary coil
resistanceTester selector
position
0.08 ~ 0.10
Ω
at
20 ˚C (68 ˚F)Ω × 1
2. Inspect:
Secondary coil resistance
Out of specification → Replace.
3. Inspect:
Sealed portion of ignition coil a
Spark plug terminal pin b
Threaded portion of spark plug c
Wear → Replace.
CDI MAGNETO INSPECTION
1. Inspect:
Pickup coil resistance
Out of specification → Replace. Tester (+) lead → Spark plug terminal 1
Tester (–) lead → Orange lead 2
Secondary coil
resistanceTester selector
position
4.6 ~ 6.8 kΩ at
20 ˚C (68 ˚F)kΩ × 1
Tester (+) lead → Red lead 1
Tester (–) lead → White lead 2
Pickup coil
resistanceTester selector
position
248 ~ 372 Ω at
20 ˚C (68 ˚F)Ω × 100
W
RBr
GP
B
1 2
21
Page 596 of 662
6 - 6
–+ELECIGNITION SYSTEM
2. Inspect:
Charging coil 1 resistance
Out of specification → Replace.
3. Inspect:
Charging coil 2 resistance
Out of specification → Replace. Tester (+) lead → Brown lead 1
Tester (–) lead → Green lead 2
Charging coil 1
resistanceTester selector
position
720 ~ 1,080 Ω
at 20 ˚C (68 ˚F)Ω × 100
Tester (+) lead → Pink lead 1
Tester (–) lead → Black lead 2
Charging coil 2
resistanceTester selector
position
44 ~ 66 Ω at
20 ˚C (68 ˚F)Ω × 10
W
RBr
GP
B
2 1
21
2 1
W
RBr
GP
B
21
NEUTRAL SWITCH INSPECTION
1. Inspect:
Neutral switch conduct
No continuous while in neutral → Replace.
Continuous while in gear → Replace.
EC628000
CDI UNIT INSPECTION
Check all electrical components. If no fault is
found, replace the CDI unit. Then check the
electrical components again.Tester (+) lead → Sky blue lead 1
Tester (–) lead → Ground 2
Sb
1Ground
2Tester selec-
tor position
NEUTRALΩ × 1IN GEAR
2 1