Page 156 of 3502
AT-148
A/T 4TH GEAR FUNCTION
2. CHECK LINE PRESSURE
Perform line pressure test. Refer to AT- 4 6 , "
LINE PRESSURE TEST" .
OK or NG
OK >> GO TO 3.
NG >> GO TO 7.
3. CHECK VALVE RESISTANCE
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Shift solenoid valve A
–Shift solenoid valve B
2. Check resistance between terminal cord assembly harness con-
nector terminals and ground. Refer to AT- 9 1 , "
Wiring Diagram —
AT — SSV/A" and AT- 9 6 , "Wiring Diagram — AT — SSV/B" .
OK or NG
OK >> GO TO 4.
NG >> Replace solenoid valve assembly.
Solenoid valve Connector TerminalResistance
(Approx.)
Shift solenoid valve A
F432 - Ground 20 - 30Ω
Shift solenoid valve B 1 - Ground 5 - 20Ω
SCIA3594E
Page 157 of 3502

A/T 4TH GEAR FUNCTION
AT-149
D
E
F
G
H
I
J
K
L
MA
B
AT
4. CHECK VALVE OPERATION
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Shift solenoid valve A
–Shift solenoid valve B
2. Check solenoid valve by listening for its operating sound while
applying battery voltage to the terminals and ground. Refer to
AT- 9 1 , "
Wiring Diagram — AT — SSV/A" and AT- 9 6 , "Wiring
Diagram — AT — SSV/B" .
OK or NG
OK >> GO TO 5.
NG >> Replace solenoid valve assembly.
5. CHECK CONTROL VALVE
1. Disassemble control valve assembly. Refer to AT- 2 8 0 , "
Control Valve Assembly" .
2. Check to ensure that:
–Valve, sleeve and plug slide along valve bore under their own weight.
–Valve, sleeve and plug are free from burrs, dents and scratches.
–Control valve springs are free from damage, deformation and fatigue.
–Hydraulic line is free from obstacles.
OK or NG
OK >> GO TO 6.
NG >> Repair control valve.
6. CHECK SHIFT-UP (D3 TO D4 )
During AT- 5 0 , "
Cruise Test — Part 1" .
Does A/T shift from D
3 to D4 at the specified speed?
YES >> GO TO 11.
NO >> Check control valve again. Repair or replace control valve assembly.
SCIA3595E
Page 158 of 3502

AT-150
A/T 4TH GEAR FUNCTION
7. CHECK VALVE RESISTANCE
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Line pressure solenoid valve
2. Check resistance between terminal cord assembly harness con-
nector terminal and ground. Refer to AT- 1 2 7 , "
Wiring Diagram
— AT — LPSV" .
OK or NG
OK >> GO TO 8.
NG >> Replace solenoid valve assembly.
8. CHECK VALVE OPERATION
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Line pressure solenoid valve
2. Check solenoid valve by listening for its operating sound while
applying battery voltage to the terminal and ground. Refer to AT-
127, "Wiring Diagram — AT — LPSV" .
OK or NG
OK >> GO TO 9.
NG >> Replace solenoid valve assembly.
9. CHECK CONTROL VALVE
1. Disassemble control valve assembly. Refer to AT- 2 8 0 , "
Control Valve Assembly" .
2. Check line pressure circuit valves for sticking.
–Pilot valve
–Shift solenoid valve A
–Shift solenoid valve B
OK or NG
OK >> GO TO 10.
NG >> Repair or replace control valve.
10. CHECK SHIFT-UP (D3 TO D4 )
During AT- 5 0 , "
Cruise Test — Part 1" .
Does A/T shift from D
3 to D4 at the specified speed?
YES >> GO TO 11.
NO >> Check control valve again. Repair or replace control valve assembly.
11 . CHECK DTC
Perform AT- 1 4 7 , "
DTC Confirmation Procedure" .
OK or NG
OK >>INSPECTION END
NG >> Perform AT- 5 0 , "
Cruise Test — Part 1" again and return to the start point of this test group.
Solenoid valve Connector TerminalResistance
(Approx.)
Line pressure solenoid valve F43 4 - Ground 2.5 - 5Ω
SCIA4951E
SCIA3275E
Page 161 of 3502

A/T TCC S/V FUNCTION (LOCK-UP)
AT-153
D
E
F
G
H
I
J
K
L
MA
B
AT
3. CHECK CONTROL VALVE
1. Disassemble control valve assembly. Refer to AT- 2 8 0 , "
Control Valve Assembly" .
2. Check to ensure that:
–Valve, sleeve and plug slide along valve bore under their own weight.
–Valve, sleeve and plug are free from burrs, dents and scratches.
–Control valve springs are free from damage, deformation and fatigue.
–Hydraulic line is free from obstacles.
OK or NG
OK >> GO TO 4.
NG >> Repair or replace control valve.
4. CHECK SHIFT-UP (D3 TO D4 )
During AT- 5 0 , "
Cruise Test — Part 1" .
Does A/T shift from D
3 to D4 at the specified speed?
YES >> GO TO 5.
NO >> Check control valve again. Repair or replace control valve assembly.
5. CHECK DTC
Perform AT- 1 5 2 , "
DTC Confirmation Procedure" .
OK or NG
OK >>INSPECTION END
NG >> GO TO 11. Check for proper lock-up.
6. CHECK VALVE RESISTANCE
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Line pressure solenoid valve
2. Check resistance between terminal cord assembly harness con-
nector terminal and ground. Refer to AT- 1 2 7 , "
Wiring Diagram
— AT — LPSV" .
OK or NG
OK >> GO TO 7.
NG >> Replace solenoid valve assembly.
7. CHECK VALVE OPERATION
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Line pressure solenoid valve
2. Check solenoid valve by listening for its operating sound while
applying battery voltage to the terminal and ground. Refer to AT-
127, "Wiring Diagram — AT — LPSV" .
OK or NG
OK >> GO TO 8.
NG >> Replace solenoid valve assembly.
Solenoid valve Connector TerminalResistance
(Approx.)
Line pressure solenoid valve F43 4 - Ground 2.5 - 5Ω
SCIA4951E
SCIA3275E
Page 162 of 3502

AT-154
A/T TCC S/V FUNCTION (LOCK-UP)
8. CHECK CONTROL VALVE
1. Disassemble control valve assembly. Refer to AT- 2 8 0 , "
Control Valve Assembly" .
2. Check line pressure circuit valves for sticking.
–Pressure regulator valve
–Pilot valve
–Pressure modifier valve
OK or NG
OK >> GO TO 9.
NG >> Repair or replace control valve.
9. CHECK SHIFT-UP (D3 TO D4 )
During AT- 5 0 , "
Cruise Test — Part 1" .
Does A/T shift from D
3 to D4 at the specified speed?
YES >> GO TO 10.
NO >> Check control valve again. Repair or replace control valve assembly.
10. CHECK DTC
Perform AT- 1 5 2 , "
DTC Confirmation Procedure" .
OK or NG
OK >>INSPECTION END
NG >> GO TO 11.
11 . CHECK LOCK-UP
During AT- 5 0 , "
Cruise Test — Part 1" .
A/T perform lock-up at the specified speed?
YES >> Perform AT- 5 0 , "Cruise Test — Part 1" again and return to the start point of this test group.
NO >> GO TO 12.
12. CHECK VALVE RESISTANCE
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Torque converter clutch solenoid valve
2. Check resistance between terminal cord assembly harness con-
nector terminal and ground. Refer to AT- 1 0 6 , "
Wiring Diagram
— AT — TCV" .
OK or NG
OK >> GO TO 13.
NG >> Replace solenoid valve assembly.
Solenoid valve Connector TerminalResistance
(Approx.)
Torque converter clutch solenoid valve F43 5 - Ground 5 - 20Ω
SCIA2063E
Page 163 of 3502

A/T TCC S/V FUNCTION (LOCK-UP)
AT-155
D
E
F
G
H
I
J
K
L
MA
B
AT
13. CHECK VALVE OPERATION
1. Remove control valve assembly. Refer to AT- 2 2 5 , "
Control Valve Assembly and Accumulators" .
–Torque converter clutch solenoid valve
2. Check solenoid valve by listening for its operating sound while
applying battery voltage to the terminal and ground. Refer to AT-
106, "Wiring Diagram — AT — TCV" .
OK or NG
OK >> GO TO 14.
NG >> Replace solenoid valve assembly.
14. CHECK CONTROL VALVE
1. Disassemble control valve assembly. Refer to AT- 2 8 0 , "
Control Valve Assembly" .
2. Check control valves for sticking.
–Torque converter clutch control valve
–Torque converter clutch relief valve
OK or NG
OK >> GO TO 15.
NG >> Repair or replace control valve.
15. CHECK LOCK-UP
During AT- 5 0 , "
Cruise Test — Part 1" .
A/T perform lock-up at the specified speed?
YES >> GO TO 16.
NO >> Check control valve again. Repair or replace control valve assembly.
16. CHECK DTC
Perform AT- 1 5 2 , "
DTC Confirmation Procedure" .
OK or NG
OK >>INSPECTION END
NG >> Perform AT- 5 0 , "
Cruise Test — Part 1" again and return to the start point of this test group.
SCIA2066E
Page 166 of 3502
AT-158
MAIN POWER SUPPLY AND GROUND CIRCUIT
MAIN POWER SUPPLY AND GROUND CIRCUITPFP:00100
Wiring Diagram — AT — MAINBCS0012Z
TCWM0519E
Page 171 of 3502

PNP, 3RD POSITION SWITCH AND CLOSED THROTTLE, WIDE OPEN THROT-
TLE POSITION SIGNAL
AT-163
D
E
F
G
H
I
J
K
L
MA
B
AT
3. CHECK PNP SWITCH CIRCUIT (WITHOUT CONSULT-II)
Without CONSULT-II
1. Turn ignition switch ON. (Do not start engine.)
2. Check voltage between TCM connector F105 terminals and
ground while moving selector lever through each position. Refer
to AT- 1 6 8 , "
Wiring Diagram — AT — NONDTC" .
B: Battery voltage
0: 0V
OK or NG
OK >> GO TO 7.
NG >> GO TO 4.
4. CHECK PNP SWITCH
Check PNP switch. Refer to AT- 1 6 6 , "
PNP SWITCH" .
OK or NG
OK >> GO TO 5.
NG >> Repair or replace damaged parts.
5. DETECT MALFUNCTIONING ITEM
Check the following items:
Harness for short or open between ignition switch and PNP switch.
Harness for short or open between PNP switch and TCM.
Harness for short or open between unified meter and A/C amp and PNP switch.
Harness for short or open between unified meter and A/C amp and TCM.
10A fuse (No.14, located in the fuse block)
Unified meter and A/C amp. Refer to DI-27, "UNIFIED METER AND A/C AMP" .
Ignition switch. Refer to PG-3, "POWER SUPPLY ROUTING CIRCUIT" .
OK or NG
OK >> GO TO 6.
NG >> Repair or replace damaged parts.
Lever positionTerminal
36 35 34 27 26
“P”, “N” B 0 0 0 0
“R” 0 B 0 0 0
“D”·“3” 0 0 B 0 0
“2” 0 0 0 B 0
“1” 0 0 0 0 B
SCIA4343E