2003 JEEP GRAND CHEROKEE Power System

[x] Cancel search: Power System

Page 351 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (4) Loosen the battery positive cable terminal
clamp pinch-bolt hex nut.
(5) Disconnect the battery positive cable terminal
clamp from the battery positive terminal post. If nec-
essary, use a battery

Page 352 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (5) Install and tighten the nut that secures the
battery positive cable eyelet terminal to the B(+) ter-
minal stud on the starter solenoid. Tighten the nut to
11.3 N´m (100 in. lbs.).
(6) Install an

Page 353 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual OPERATION
The battery tray provides a secure mounting loca-
tion and supports the battery. On some vehicles, the
battery tray also provides the anchor point/s for the
battery holddown hardware. The ba

Page 354 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSTALLATION
(1) Clean and inspect the battery tray and support
unit. Refer to the procedures in this section of the
service manual.
(2) Install the battery temperature sensor onto the
battery tray. R

Page 355 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual CHARGING
TABLE OF CONTENTS
page page
CHARGING
DESCRIPTION.........................24
OPERATION...........................24
DIAGNOSIS AND TESTING - CHARGING
SYSTEM............................24
SPECIF

Page 356 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²a faulty or improperly adjusted switch that
allows a lamp to stay on. Refer to Ignition-Off Draw
Test in 8, Battery for more information.
INSPECTION
The Powertrain Control Module (PCM) monitors
crit

Page 359 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSTALLATION
(1) Position generator to engine and install mount-
ing bolts.
(2) Tighten generator mounting bolts as follows:
²Vertical mounting bolt 4.7L engineÐ40 N´m (29
ft. lbs.)
²Long horizont

Page 360 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual STARTING
TABLE OF CONTENTS
page page
STARTING
DESCRIPTION.........................29
OPERATION...........................30
DIAGNOSIS AND TESTING - STARTING
SYSTEM............................30
SPECIF