2003 JEEP GRAND CHEROKEE Ignition control

[x] Cancel search: Ignition control

Page 325 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²Malfunction indicator lamp (Check engine lamp).
Driven through J1850 circuits.
²Overdrive indicator lamp (if equipped). Driven
through J1850 circuits.
²Oxygen sensor heater relays (if equipped).

Page 326 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (2) If equipped, remove Transmission Control Mod-
ule (TCM).
(3) Remove coolant reserve/overflow tank.
(4) Remove cover over electrical connectors. Cover
snaps onto PCM.
(5) Carefully unplug three 32

Page 327 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual sponder through a tuned antenna ring integral to the
SKIM housing. If this antenna ring is not mounted
properly around the ignition lock cylinder housing,
communication problems between the SKIM and t

Page 328 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (3) Disconnect the instrument panel wire harness
connector from the SKIM connector.
(4) Remove the screw that secures the SKIM to
the bottom of the steering column housing (Fig. 16).
(5) Disengage the

Page 344 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual STANDARD PROCEDURE - IGNITION-OFF
DRAW TEST
The term Ignition-Off Draw (IOD) identifies a nor-
mal condition where power is being drained from the
battery with the ignition switch in the Off position.

Page 355 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual CHARGING
TABLE OF CONTENTS
page page
CHARGING
DESCRIPTION.........................24
OPERATION...........................24
DIAGNOSIS AND TESTING - CHARGING
SYSTEM............................24
SPECIF

Page 356 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²a faulty or improperly adjusted switch that
allows a lamp to stay on. Refer to Ignition-Off Draw
Test in 8, Battery for more information.
INSPECTION
The Powertrain Control Module (PCM) monitors
crit

Page 360 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual STARTING
TABLE OF CONTENTS
page page
STARTING
DESCRIPTION.........................29
OPERATION...........................30
DIAGNOSIS AND TESTING - STARTING
SYSTEM............................30
SPECIF